Remediation of storm damage to station multi-Purpose Bldg

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
30332Q270000002
NAICS
238220
PSC
Z2AZ
Set-aside
Small Business Set Aside - Total
Posted
November 20, 2026
Response due
November 28, 2026
Place of performance
Dauphin Island, AL

What this opportunity is

The Department of Homeland Security is seeking a small business to provide repair services for storm damage at the United States Coast Guard Station Dauphin Island in Alabama. The project involves comprehensive remediation of the Multi-Purpose Building, including soffit and electrical repairs. As a total small business set-aside, this opportunity is suited for small contractors, and the combined synopsis/solicitation notice indicates that interested parties should track the opportunity closely rather than submit bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

CONTRACT SPECIFICATIONS STA Dauphin Island Hurricane Isaias Repairs AT UNITED STATES COAST GUARD Station Dauphin Island Dauphin Island, Alabama PROJECT NUMBER 33649495 October 2026 -- 1 of 7 -- SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1. GENERAL DESCRIPTION General Work Requirements Request commercial contractor repair services to provide all labor, tools, equipment, materials, transportaƟon, and supervision necessary to perform comprehensive hurricane damage repairs, renewal, and facility sustainment at United States Coast Guard StaƟon Dauphin Island, ensuring efficient system operaƟon, life safety, structural integrity, and complete operaƟonal readiness. This project consƟtutes a 1-for-1 like-for-like, in-kind repair and replacement sustainment acƟon across staƟon faciliƟes, waterfront structures, perimeter infrastructure, and mechanical systems. All dimensions, quanƟƟes, and field alignments shall be verified by the contractor during physical on-site inspecƟon. This Work Request will generally include, but is not limited to, the following primary scopes of work: Base Items:  Station Multi-Purpose Building Remediation (Item 1): Remediation of storm damage to the station's Multi-Purpose Building. Two soffit light fixtures were damaged along some of the soffit outside of the galley area. The work includes:  Soffit & Electrical Repair: Repair the damaged soffit area and replace the 2 exterior soffit light fixture, including any necessary electrical wiring. 2. SPECIFIC WORK REQUIREMENTS N/A. -- 2 of 7 -- 3. SPECIAL WORK REQUIREMENTS  Staging and Laydown: Coordinate all staging areas, material laydown, and vehicle parking with the Coast Guard Point of Contact prior to commencing physical work. Maintain clear, unobstructed access for emergency response apparatus and station search-and-rescue (SAR) assets at all times.  Hot Work Operations: Any hot work operations (welding, cutting, brazing, grinding, or open-flame application) require an approved USCG Hot Work Permit issued at least 48 hours in advance through the Station Point of Contact. A continuous fire watch equipped with appropriate fire-extinguishing equipment must remain on-site during all hot work activities and for a minimum of sixty (60) minutes following completion. 4. TEMPORARY FACILITIES OR UTILITIES None required. The Contractor shall furnish all necessary heavy-duty extension cords, hoses, connectors, and adapters conforming to OSHA requirements. 5. LOCATION The work is located at: U.S. Coast Guard StaƟon Dauphin Island 251 Aquarium Dr, Dauphin Island, AL 36528 Arrangements for visiƟng the site, physical inspecƟons, and technical coordinaƟon may be made by contacƟng:  Point of Contact: MKC Jeremy Gawlik  Email: Jeremy.J.Gawlik@uscg.mil  Telephone: (210) 253-0983 -- 3 of 7 -- 6. DRAWINGS ACCOMPANYING SPECIFICATION There are no drawings accompanying this specificaƟon. Contractors shall physically inspect the site, verify all field measurements, exisƟng condiƟons, equipment configuraƟons, and scope boundaries during the site visit prior to commencing work. 7. WORK HOURS This project is for hurricane recovery. This project requires close schedule coordinaƟon to prevent operaƟonal interrupƟons during work execuƟon. The contractor shall plan and execute the schedule to minimize disrupƟons to ongoing staƟon military operaƟons and emergency Search and Rescue (SAR) response missions. 8. SPECIFIC ENVIRONMENTAL REQUIREMENTS There are no specific environmental permits required for like-for-like repairs. Refer to the secƟon Ɵtled Environmental for general environmental, refrigerant handling, and waterway protecƟon requirements. 9. SAFETY PROGRAM General The Contractor is solely responsible for work site safety. Implement a comprehensive safety program that protects the lives and health of personnel in the construcƟon area, prevents damage to property, and avoids work interrupƟons. Provide appropriate safety measures including, but not limited to, barricades, warning signs, and signal lights, complying with all requirements of applicable federal standards (OSHA 29 CFR 1910 and 29 CFR 1926), USACE Safety and Health Requirements Manual (EM 385-1-1), and State of Florida and local safety laws, rules, and regulaƟons. 10. AVAILABILITY OF UTILITY SERVICES Reasonable amounts of the following uƟliƟes will be made available to the Contractor without charge:  Electricity (120V branch circuits, provided circuits are not overloaded), and -- 4 of 7 --  Potable Water (from designated exterior station hose bibbs). 11. UNDERGROUND AND CONCEALED UTILITIES  Any utility locations provided are diagrammatic, not exact.  Physically verify the location and elevation of existing underground and concealed utilities local to the work area. Employ techniques to scan the construction site, including electromagnetic and sonic equipment, prior to commencing excavation or post-hole drilling. Mark the surface of the ground where existing underground utilities are discovered. 12. USE OF PREMISES The work shall be performed on an acƟve Coast Guard operaƟonal military installaƟon. Become familiar with and obey staƟon fire, traffic, and security regulaƟons. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the StaƟon. Isolate each construcƟon area with temporary parƟƟons and dust controls. Provide movable high-visibility safety fencing around all work areas and equipment laydown areas located outdoors. Provide temporary covers on excavaƟons or pier deck openings that remain open overnight. 13. CLEANUP Keep the work area, including the laydown and storage area, free from accumulaƟons of waste materials on a daily basis and comply with all federal, state, and local regulaƟons pertaining to the storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste disposal faciliƟes, including garbage cans, trash piles, or staƟon dumpsters. Tools and loo…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 238220