Description
CONTRACT SPECIFICATIONS
STA Dauphin Island Hurricane Isaias Repairs
AT
UNITED STATES COAST GUARD
Station Dauphin Island
Dauphin Island, Alabama
PROJECT NUMBER 33649495
October 2026
-- 1 of 7 --
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. GENERAL DESCRIPTION
General Work Requirements
Request commercial contractor repair services to provide all labor, tools, equipment, materials,
transportaƟon, and supervision necessary to perform comprehensive hurricane damage
repairs, renewal, and facility sustainment at United States Coast Guard StaƟon Dauphin Island,
ensuring efficient system operaƟon, life safety, structural integrity, and complete operaƟonal
readiness.
This project consƟtutes a 1-for-1 like-for-like, in-kind repair and replacement sustainment
acƟon across staƟon faciliƟes, waterfront structures, perimeter infrastructure, and mechanical
systems. All dimensions, quanƟƟes, and field alignments shall be verified by the contractor
during physical on-site inspecƟon. This Work Request will generally include, but is not limited
to, the following primary scopes of work:
Base Items:
Station Multi-Purpose Building Remediation (Item 1): Remediation of storm
damage to the station's Multi-Purpose Building. Two soffit light fixtures were
damaged along some of the soffit outside of the galley area. The work includes:
Soffit & Electrical Repair: Repair the damaged soffit area and replace the
2 exterior soffit light fixture, including any necessary electrical wiring.
2. SPECIFIC WORK REQUIREMENTS
N/A.
-- 2 of 7 --
3. SPECIAL WORK REQUIREMENTS
Staging and Laydown: Coordinate all staging areas, material laydown, and vehicle
parking with the Coast Guard Point of Contact prior to commencing physical work.
Maintain clear, unobstructed access for emergency response apparatus and station
search-and-rescue (SAR) assets at all times.
Hot Work Operations: Any hot work operations (welding, cutting, brazing, grinding,
or open-flame application) require an approved USCG Hot Work Permit issued at
least 48 hours in advance through the Station Point of Contact. A continuous fire
watch equipped with appropriate fire-extinguishing equipment must remain on-site
during all hot work activities and for a minimum of sixty (60) minutes following
completion.
4. TEMPORARY FACILITIES OR UTILITIES
None required. The Contractor shall furnish all necessary heavy-duty extension cords, hoses,
connectors, and adapters conforming to OSHA requirements.
5. LOCATION
The work is located at:
U.S. Coast Guard StaƟon Dauphin Island
251 Aquarium Dr,
Dauphin Island, AL 36528
Arrangements for visiƟng the site, physical inspecƟons, and technical coordinaƟon may be made
by contacƟng:
Point of Contact: MKC Jeremy Gawlik
Email: Jeremy.J.Gawlik@uscg.mil
Telephone: (210) 253-0983
-- 3 of 7 --
6. DRAWINGS ACCOMPANYING SPECIFICATION
There are no drawings accompanying this specificaƟon. Contractors shall physically inspect the
site, verify all field measurements, exisƟng condiƟons, equipment configuraƟons, and scope
boundaries during the site visit prior to commencing work.
7. WORK HOURS
This project is for hurricane recovery. This project requires close schedule coordinaƟon to
prevent operaƟonal interrupƟons during work execuƟon. The contractor shall plan and execute
the schedule to minimize disrupƟons to ongoing staƟon military operaƟons and emergency
Search and Rescue (SAR) response missions.
8. SPECIFIC ENVIRONMENTAL REQUIREMENTS
There are no specific environmental permits required for like-for-like repairs. Refer to the secƟon
Ɵtled Environmental for general environmental, refrigerant handling, and waterway protecƟon
requirements.
9. SAFETY PROGRAM
General
The Contractor is solely responsible for work site safety. Implement a comprehensive safety
program that protects the lives and health of personnel in the construcƟon area, prevents
damage to property, and avoids work interrupƟons.
Provide appropriate safety measures including, but not limited to, barricades, warning signs, and
signal lights, complying with all requirements of applicable federal standards (OSHA 29 CFR 1910
and 29 CFR 1926), USACE Safety and Health Requirements Manual (EM 385-1-1), and State of
Florida and local safety laws, rules, and regulaƟons.
10. AVAILABILITY OF UTILITY SERVICES
Reasonable amounts of the following uƟliƟes will be made available to the Contractor without
charge:
Electricity (120V branch circuits, provided circuits are not overloaded), and
-- 4 of 7 --
Potable Water (from designated exterior station hose bibbs).
11. UNDERGROUND AND CONCEALED UTILITIES
Any utility locations provided are diagrammatic, not exact.
Physically verify the location and elevation of existing underground and concealed
utilities local to the work area. Employ techniques to scan the construction site,
including electromagnetic and sonic equipment, prior to commencing excavation or
post-hole drilling. Mark the surface of the ground where existing underground
utilities are discovered.
12. USE OF PREMISES
The work shall be performed on an acƟve Coast Guard operaƟonal military installaƟon. Become
familiar with and obey staƟon fire, traffic, and security regulaƟons. Personnel shall not stray
from the immediate area of work or direct avenues of ingress and egress unless authorized in
advance by the StaƟon.
Isolate each construcƟon area with temporary parƟƟons and dust controls. Provide movable
high-visibility safety fencing around all work areas and equipment laydown areas located
outdoors. Provide temporary covers on excavaƟons or pier deck openings that remain open
overnight.
13. CLEANUP
Keep the work area, including the laydown and storage area, free from accumulaƟons of waste
materials on a daily basis and comply with all federal, state, and local regulaƟons pertaining to
the storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste
disposal faciliƟes, including garbage cans, trash piles, or staƟon dumpsters. Tools and loo…