Description
PR # 61200PR270000061
STATEMENT OF WORK
LAST UPDATED: 11/19/2026
STATEMENT OF WORK (SOW)
FOR
MONTHLY BOILER CHEMICAL TESTING
1.0 GENERAL
1.1 BACKGROUND
U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road
Petaluma; CA 94952 is the Coast Guard’s largest West Coast Training Center. Our graduates
are the latest chefs, medics, storekeepers, yeoman, information systems technicians,
electronics technicians, operations specialists, and aviation survival technicians (AST). We are
also home to the Coast Guard Leadership Development Center’s Chief Petty Officer Academy.
1.2 SCOPE
The requirement of this contract is for the contractor to furnish all labor, tools, materials,
equipment, supplies, services, supervision, and all other items necessary to provide
comprehensive boiler chemical testing, preventative water treatment, and scale/corrosion
control on eleven (11) hot water loops located at USCG TRACEN Petaluma. The contractor is
responsible for all phases of chemical water treatment, system monitoring, periodic inspections,
inventory control, and waterside efficiency assurance.
1.3 OBJECTIVE
The service provider shall provide all labor, equipment, materials, vehicles, and appliances
necessary to perform all operations in connection with routine water testing, scale and corrosion
mitigation, equipment calibration, and chemical water treatment across facility heating loops at
U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road,
Petaluma, CA 94952-4154.
1.4 APPLICABLE DOCUMENTS
1.4.1 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in
this document:
• 29 CFR Part 1910 - Occupational Safety and Health Standards (General Industry)
• 29 CFR Part 1910.1200 - Hazard Communication Standard (Safety Data Sheets /
Chemical Safety)
• Federal Acquisition Regulation (FAR) 4.1103 - System for Award Management
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. ROUTINE MONTHLY ONSITE SERVICE AND WATER TESTING
• Provide one (1) onsite service visit per calendar month to conduct testing, monitoring,
and chemical servicing of eleven (11) hot water loops.
• Perform standard chemical testing on boiler water, feedwater, condensate, and closed
loop systems (evaluating pH, conductivity, dissolved solids, inhibitor levels, and
alkalinity).
• Provide and maintain access to an online portal for digital service reporting, data
trending, and continuous operational logging.
-- 1 of 4 --
PR # 61200PR270000061
STATEMENT OF WORK
LAST UPDATED: 11/19/2026
List of boilers locations:
Boiler Model Serial # Location
KN Series 10 0101423561 Steadman Hall Bldg. 550
KN Series 10 0101423560 Steadman Hall Bldg. 550
KN Series 4 0101423474 Facilities ENG Bldg. 160
KN Series 10 0101423559 Club Bldg. 134
KN Series 6 0101423558 Motor Pool Bldg. 170
KN Series 4 0101423473 Supply Bldg. 165
Lochinvar CHN0991 K10H00229967 Gym Bldg. 251
Lochinvar FTX400N 2019119201701 Theater Bldg. 261
KN Series 10 0101423563 Mace Hall Bldg. 130
Lochinvar CHL1801 C11H00231789 Upper Galley Bldg. 126
Lochinvar CHL1801 C11H00231788 Upper Galley Bldg. 126
Smith GS110-W-7-H GSS110-7-H-
080024
Housing Bldg. 408
(Outside)
2.2 TASK TWO. SCALE AND CORROSION INHIBITOR APPLICATION
• Furnish and apply chemical water treatment products engineered to retard scale and
corrosion in the boilers.
• Furnish and apply corrosion inhibitor to closed hydronic loops should water loss occur
from the systems.
• Provide supplemental corrosion inhibitors to treat system water loss up to a maximum
volume of 10% total system capacity per calendar year at no additional cost to the
Government.
2.3 TASK THREE. FEED EQUIPMENT CALIBRATION AND MAINTENANCE
• Check, clean, calibrate, and service all chemical control, dosing, and feeding equipment.
• Check, inspect, and verify the operational integrity of all associated water treatment
control hardware and monitoring probes.
2.4 TASK FOUR. INVENTORY CONTROL AND CONTAINER DISPOSAL
• Maintain strict inventory control of all onsite chemical reserves, ensuring adequate
supplies are always maintained.
• Promptly remove all empty chemical drums, containers, and packaging from
Government property and dispose of them legally in full compliance with applicable
environmental regulations.
2.5 TASK FIVE. LABORATORY ANALYSIS AND TECHNICAL SAFETY TRAINING
• Provide certified laboratory analyses for backup diagnostic support whenever anomalous
conditions, severe contamination, or baseline verification is required.
• Conduct chemical safety and operational handling training for onsite USCG facility
maintenance personnel.
• Participate in annual management reviews conducted at the discretion of TRACEN
Petaluma facility engineering personnel.
• Guarantee that the present degree of operating efficiency of the heating systems will be
maintained while under the contractor's program; should fouling or loss of efficiency
occur as a result of chemical treatment failure, the contractor shall clean the affected
systems at no additional cost to the Government.
-- 2 of 4 --
PR # 61200PR270000061
STATEMENT OF WORK
LAST UPDATED: 11/19/2026
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this
SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement
is maintained at all times. The Contractor must ensure that all contract support personnel are
present for all hours of the workday. If for any reason the Contractor staffing levels are not
maintained due to vacation, leave, appointments, etc., and replacement personnel will not be
provided, the Contractor must provide e-mail notification to the Government Technical
Representative prior to employee absence. Otherwise, the Contractor must provide a fully