Skip to content

Open for responses

Removal, refurbishment, and reinstallation of two (2) 200 HP General Electric (GE) induction motor at the Unitary Plan Wind Tunnel facility

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Notice type
Combined Synopsis/Solicitation
Solicitation #
80NSSC27948630Q
NAICS
811310
PSC
J059
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
November 24, 2026

What this opportunity is

NASA is seeking a small business to remove, refurbish, and reinstall two 200 HP General Electric induction motors at the Unitary Plan Wind Tunnel facility, as detailed in the Statement of Work. This procurement is a total small business set-aside under NAICS 811310, making it suitable for small contractors with relevant experience. Vendors should note that this is a combined synopsis/solicitation, indicating they should track the opportunity closely and submit quotes with specific information, including delivery time and applicable discounts.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 , 6/2026 11/16/2026 Statement of Work for Drive Motor #1 Blower Fan Motors Refurbishment -- 1 of 8 -- 2 6/2026 11/16/2026 Project Overview: The drive for the wind tunnel compressor consists of four motors which can be coupled together or run separately. To cool the windings of the drive motors, each drive motor has a pair of blowers mounted in the basement beneath the drive motor. The blower wheels are overhung on dual shaft 200hp motors. See Figure 1 below. Figure 1: Main Drive Blower Motors This Statement of Work outlines the requirements for the removal, refurbishment, and reinstallation of two (2) 200 HP General Electric (GE) induction motor at the Unitary Plan Wind Tunnel facility in Moffett Field, CA. The two blower motors to be refurbished are the two blower motors associated with main drive motor #1. Removal of the motors will be difficult because of their position in the basement of the switchgear room. A job walk is required to understand the complexity of the motor removal. The period of performance will begin on or near April 12, 2027 or as determined by the Branch Chief, Facility Chief, and Facility Managers so long as there are no hindrances to wind tunnel operations. The scope includes vibration analysis, electrical disconnection, rigging, transportation, refurbishment, and reinstallation of the refurbished motors. The project duration should not exceed a 40-day duration. -- 2 of 8 -- 3 , 6/2026 11/16/2026 The work will be performed by [Contractor Name], hereinafter referred to as “Contractor,” in coordination with [NASA Ames Unitary Plan Wind Tunnel], hereinafter referred to as “Owner.” The NASA Project Manager is Carl Kruger. Contractors shall provide a fixed price quote. Prevailing wage requirements do not apply. Access to Site: Note: All personnel on site shall be a “US Person”. A “US Person” is defined as any individual who is granted U.S. citizenship; or any individual who is granted U.S. permanent residence ("Green Card" holder); or any individual who is granted status as a "protected person" under 8 U.S.C. 1324b(a)(3). Real ID driver’s license is required to enter the center. A NASA badge or visitor’s pass is required to enter the NASA Ames Research Center. The names of each worker needing a visitor pass shall be sent to the Amentum/NASA Project Manager (Electrical Craft Supervisor) at least three business days prior to any work date on site. Each worker will be sent an automated email with a pre- screening questionnaire. If they fail to provide the requested information 48 hours in advance, they may be denied entry to the center. The Badging office opens at 6 a.m. Personnel on site for 29 days or less in a 365-day period shall be badged using the visitor badge process, which requires only name, citizenship, and company affiliation. Personnel on site for more than 29 days in a 365-day period shall be badged via the via the NASA IdMAX system as either short-term (NASA non-PIV temporary credentials; 30 to 179 days in a 365-day period) or long-term (180 days or more in a 365-day period) employees. The basic information needed from visitors for a non-PIV badge application includes a. Name of the applicant. b. Date of birth of the applicant. c. Home address. d. Social Security Number (SSN). e. Position of the applicant. f. Contact information for the applicant. g. Name of the requester. h. Organization of the requester. i. Contact information for the requester. Safety Chemicals – Cleaning Supplies Any chemicals, solvents, or other hazardous material to be used on site must be approved by the Jacobs Project Manager prior to use. The approval process shall be through the Wind Tunnel Division Safety Office. An estimated quantity of use shall be provided, in addition to SDS’ for each material. SDS for each material must be always on site and available to workers. Use Of Ladders Portable ladders are to be inspected before initial use in each work shift, and more frequently as necessary to identify any visible defects that could cause employee injury. Ladders with defects are not to be used and shall be immediately removed from service. All ladders shall be of a type, size, and rating appropriate for the task, and used in accordance with manufacturer requirements. Rigging Equipment All rigging equipment used for the job must have been load tested within a year and tagged with certification (100% rating). -- 3 of 8 -- 4 6/2026 11/16/2026 The Contractor shall submit a Lift Plan detailing motor removal & installation by February 2027. This Lift Plan must be approved by the Owner’s Safety Department prior to the commencement of work. Fire Permits/Hot Work Permits Safety clearance permits shall be obtained with the support of the Amentum’s Project Manager prior to performing any of the following: • Hot Work Permits - The Amentum Project Manager will coordinate with the Fire Prevention Program Supervisor to procure a hot work permit. Permits shall be requested 24 hours prior to commencing hot work and are posted at the jobsite for the duration of the work. Hot work consists of open flame heating devices, cutting torches, welding, welding preheat devices, or any other processes that create a potential fire hazard. • Energized Electrical Work Permits - The Amentum Project Manager will coordinate issuance of Energized Electrical Work Permits. These permits must be issued prior to work on live circuits >50 volts to ground. Permits will only be issued if the de-energization introduces additional or increased hazards,or is infeasible due to equipment design or operational limitations. Permit approval is dependent upon approval from the associated NASA directorate. Energized Electrical Work Permits are not required if only performing diagnostic checks (i.e. voltage or amperage readings) • Safety Clearance Permit - The Amentum Project Manager shall arrange for issuance of a Safety Clearance Permit (from Branch JCM) prior to construction activities that include excavations, hi…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 811310