Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W911SG26RA011
NAICS
238330
PSC
7220
Set-aside
8a Competed
Posted
June 4, 2026
Response due
June 17, 2026
Place of performance
Fort Bliss, TX
What this opportunity is
The Department of Defense is seeking a contractor to remove and install vinyl composite tile flooring in Building 1001 at Fort Bliss, Texas. This project is set aside for 8(a) businesses and involves demolition, disposal, subfloor preparation, and installation of new flooring across nine rooms totaling approximately 1,500 square feet. Interested small businesses should note that this is a solicitation notice, indicating the opportunity to bid on the contract.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Directorate of Public Works
Engineering Services Division
Fort Bliss, Texas
STATEMENT OF WORK
Installation of Vinyl Composite Tile and Painting of Door Trims
in Building 1001
5AB-00003-6J. 02 MARCH 2026
-- 1 of 31 --
Controlled Unclassified Information (CUI)
STATEMENT OF WORK 5AB-00003-6J
Page 1 of 30
Contents
PART 1 - DESCRIPTION OF WORK ............................................................................................................ 4
1.1. Objectives. .................................................................................................................................................. 4
1.2. Period of Performance. ............................................................................................................................... 4
1.3. Place of Performance .................................................................................................................................. 4
1.3.1. Occupancy: .............................................................................................................................................. 4
1.4. Specific Work Requirements...................................................................................................................... 4
1.4.1. Civil……………………………………………………………………………………………………..4
1.4.1.1. Demolition 02 41 00. ............................................................................................................................ 4
1.4.1.2. Cast in Place Concrete 03 30 00. .......................................................................................................... 4
1.4.1.3. Traffic Signage 10 14 53. ..................................................................................................................... 4
1.4.1.4. Earthwork 31 00 00. ............................................................................................................................. 4
1.4.1.5. Cold Milling Asphalt Paving 32 01 16.71. ........................................................................................... 5
1.4.1.6. Bituminous Tack and Prime Coats 32 12 13. ....................................................................................... 5
1.4.1.7. Hot-Mix Asphalt HMA for Roads 32 12 16. ........................................................................................ 5
1.4.2. Architectural ............................................................................................................................................ 5
1.4.3 Structural ................................................................................................................................................. 5
1.4.4 Fire Protection .......................................................................................................................................... 5
1.4.5 Electrical ................................................................................................................................................... 5
1.4.6. Telecommunications................................................................................................................................ 5
1.4.7. Mechanical/Plumbing/HVAC ................................................................................................................. 5
1.5. Attachments ................................................................................................................................................ 5
PART 2 - GENERAL REQUIREMENTS ....................................................................................................... 6
2.1. Basic Guidelines ......................................................................................................................................... 6
2.1.1. Preconstruction Conference..................................................................................................................... 6
2.1.2. Construction Documents ......................................................................................................................... 6
2.1.4. Contractor Furnished Items ..................................................................................................................... 6
2.1.5. Installation Property ................................................................................................................................ 6
2.1.6. Contractor Vehicles ................................................................................................................................. 6
2.1.7. Buy American Act. Construction Materials ............................................................................................ 7
2.2. Key Personnel............................................................................................................................................. 7
2.2.1. PM……………………………………………………………………………………………………….7
2.2.2. Superintendent ......................................................................................................................................... 8
2.2.3. SSHO……………… ............................................................................................................................... 8
-- 2 of 31 --
Controlled Unclassified Information (CUI)
STATEMENT OF WORK 5AB-00003-6J
Page 2 of 30
2.2.4. QCM…. ................................................................................................................................................... 9
2.3. Utilities ..................................................................................................................................................... 10
2.3.1. Utilities Cutovers and Interruptions ...................................................................................................... 10
2.3.2. Portable Latrines.................................................................................................................................... 10
2.4. Hours of Operation ........…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238330)
B334 Repair Kitchen Flooring
DEPT OF DEFENSE · Solicitation · due July 20, 2026
Refurbish Wash Rack Floor - F129, Vance AFB, OK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 25, 2026
Request for Pricing Proposal – Replacement of carpeting in US Consulate Johannesburg (PR16068545)
STATE, DEPARTMENT OF · Solicitation · due July 10, 2026
USCG Base Astoria Hanger Carpet and Flooring Project
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 18, 2026
Repair Flooring Student Pilot Housing, Multiple Facilities
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 22, 2026
Replace Carpet Multiple Buildings
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 7, 2026