The Department of Defense is seeking engineering services for the repair of B-52 CONECT components through a Firm Fixed Price Indefinite Delivery Requirements contract and Cost-Plus Fixed Fee arrangement. This opportunity is not set aside for small businesses, as it is intended for Honeywell Aerospace, the Original Equipment Manufacturer, due to their unique capabilities. Interested parties may express their interest or submit proposals, but this notice indicates that competitive proposals are not being requested at this time, suggesting a focus on tracking rather than bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PR: FD2060-27-00011 PWS REVISION: 0 1
Performance Work Statement
for
B-52 CONECT Repair/Sustainment
Purchase Request: FD2060-27-00011
24 June 2026
-- 1 of 21 --
PR: FD2060-27-00011 PWS REVISION: 0 2
1.0 Description of Services
1.1 Objective(s): This Performance Work Statement (PWS) details the services required from
the contractor/manufacturer for the repair and obsolescence mitigation of three (3) B-52
CONECT items. The contractor shall provide quality repair to ensure a serviceable “A”
condition item efficiently serves its intended purpose, by the required disassembly, testing,
inspection and repair. The contractor shall provide timely and accurate reporting in Commercial
Asset Visibility Air Force (CAVAF), while meeting the repair Turn Around Times (TAT) of
routines, SURGE, and MICAP requirements and reduce the frequency of Product Quality
deficiency Reports (PQDRs). The scope of services includes evaluation, fault isolation, remove
and replace, inspection, testing, repair, and packaging of the below items:
NSN 5821-01-657-6453CX PN: 7000386-19
NSN 5821-01-657-6452CX PN: 7000946-19
NSN 5821-01-664-4605CX PN: 73000053-19
1.2 Benefit to United States Air Force (USAF): This acquisition directly benefits the United
States Air Force (USAF) by providing the serviceable assets necessary to sustain the B-52
CONECT system. This will ensure proper operation of CONECT components and significantly
reduce Mission Incapable Awaiting Parts (MICAP) requisitions. Minimizing MICAPs is crucial,
as elevated hours and backorders lead to grounded mission-capable aircraft and degrade the vital
information warfighters need for successful missions.
1.3 Background: The B-52 Combat Network Communications Technology (CONECT) system
provides significantly upgraded communications capabilities and crew interface. CONECT
provides new infrastructure to the aircraft to incorporate integrated communications capability,
in-flight conventional weapons retargeting, carrier re-tasking, improved operator interface
design, and an enhanced situational awareness environment to support both nuclear and
conventional delivery functions in a more efficient, versatile, and timely manner. For all mission
capabilities, CONECT provides improved communications capabilities, rapid response to
changing theatre circumstances, and improved crew awareness of those changes. It allows the B-
52 to receive information from several sources and provide the integrated information to the
crew. It also provides interfaces for machine-to-machine communication, allowing quicker,
easier, and more reliable retargeting and re-tasking.
2.0 Services Summary
Performance
Objective
PWS
Reference
Performance Threshold
Quality of repair 4.6.1 Repaired assets shall pass inspection with no more than one
failure per quarter.
At a minimum, 95% of repaired assets shall pass initial
inspection. Remaining 5% (or less) of failed assets shall pass
on the second attempt. This metric will be calculated per
contract year.
-- 2 of 21 --
PR: FD2060-27-00011 PWS REVISION: 0 3
Performance
Objective
PWS
Reference
Performance Threshold
There shall be no more than 1 valid PQDR per quarter. A valid
PQDR shall be repaired and delivered serviceable within 30
calendar days of receipt.
Delivery of repair 4.6.3 Repaired assets shall be delivered in accordance with the
schedule defined by the contract/order.
There shall be no more than 5 late deliveries per contract year.
The Contractor shall notify the Government, via email to the
PCO and PM, if the delivery of any asset will not meet the
scheduled delivery date and negotiate a revised delivery date.
The late assets shall be delivered by the revised delivery date
acceptable to the Government.
CAV-AF reporting 4.3.3 The Contractor shall report production using CAVAF. The
Contractor shall provide data on the actions conducted for each
unit. The Contractor shall report daily or as actions occur.
Quality of CDRL
deliverable
4.2.1 There shall be no more than one rejection of any deliverable.
There shall be no more than 2 total rejections of deliverables
per contract year. The Government will reject a deliverable if 1
or more technical errors or 1 or more minor errors are found
within the deliverable. The rejected deliverable shall be
corrected and resubmitted within five business days of
notification of Government rejection.
Receipt of CDRL
deliverable
4.2.2 There shall be no more than one late submission(s) of
deliverables per contract year. The Contractor shall notify the
Government if the delivery of any data/document will not meet
the scheduled delivery date and negotiate a revised delivery
date. The data/document shall be delivered by the revised
delivery date acceptable to the Government.
Adherence to
Contractor Quality
Management System
(QMS)
5.9 100% compliance with the QMS is required.
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in
accordance with the Revolutionary FAR Overhaul (RFO) and as specified in the contract/order.
3.2 Government Property to be Provided: Government property to be provided includes the
NSN’s listed in Appendix B provided for repair. The contractor shall furnish all material and
parts necessary for repair of these items.
3.3 Reporting of Government Property: The Contractor shall have a system of internal
controls to manage (control, use, preserve, protect, repair, and maintain) Government property in
-- 3 of 21 --
PR: FD2060-27-00011 PWS REVISION: 0 4
its possession in accordance with RFO 52.245-1, and its property management system shall be
adequate to satisfy the requirements of this clause. The contractor shall record receipt and return
of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption,
disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise
Environment (PIEE), https://piee.eb.mil, as stipulated by R-DFARS 252.245-7005. This
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.