Skip to content

Open for responses

Repair Taxiway Alpha & Bravo - North Auxiliary Airfield

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA441827R0002
NAICS
237310
PSC
Y1BD
Set-aside
Small Business Set Aside - Total
Posted
October 30, 2026
Response due
December 2, 2026
Place of performance
North, SC

What this opportunity is

The Department of Defense is soliciting bids for the repair of Taxiways Alpha and Bravo at North Auxiliary Airfield in South Carolina, focusing on airfield paving, concrete work, striping, joint sealing, and lighting. This opportunity is set aside for small businesses, making it suitable for contractors with relevant experience in multi-discipline construction efforts. Note that the solicitation is competitive, and no award will be made until funds are available, so interested parties should track the notice for updates rather than immediately bid.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Repair Taxiway Alpha & Bravo at North Auxiliary Airfield North, South Carolina Orangeburg County Specifications April 21, 2017 100% Design Submittal Project Manager: Greg Jones, P.E. gregj@adcengineering.com JBC Project No. SBML 12-1100 ADC Project No. 16222 -- 1 of 353 -- Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100 North Auxiliary Airfield 100% Design Submittal PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 14 00 WORK RESTRICTIONS 01 30 00 ADMINISTRATIVE REQUIREMENTS 01 32 16.00 20 PROJECT SCHEDULE AND PROGRESS DOCUMENTATION 01 33 00 SUBMITTAL PROCEDURES 01 35 13 SPECIAL PROJECT PROCEDURES 01 35 23 OPERATIONAL SAFETY ON AIRFIELDS DURING CONSTRUCTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 QUALITY CONTROL FOR MINOR CONSTRUCTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 54 00.00 31 GREEN PROCUREMENT 01 57 19.00 31 TEMPORARY ENVIRONMENTAL CONTROLS 01 57 20.00 31 ENVIRONMENTAL PROTECTION 01 74 19.00 31 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 01 78 00 CLOSEOUT SUBMITTALS 01 78 23 OPERATION AND MAINTENANCE DATA DIVISION 02 - EXISTING CONDITIONS 02 01 00.00 GEOTECHNICAL DATA 02 41 00 DEMOLITION DIVISION 03 - CONCRETE 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE DIVISION 22 - PLUMBING 22 05 83.63 CURED-IN-PLACE PIPE (CIPP) LINING DIVISION 26 - ELECTRICAL 26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS DIVISION 31 - EARTHWORK 31 00 00 EARTHWORK DIVISION 32 - EXTERIOR IMPROVEMENTS 32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS 32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS 32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS 32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE 32 12 10 BITUMINOUS TACK AND PRIME COAT 32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING 32 17 23 PAVEMENT MARKINGS 32 92 19 SEEDING 32 92 23 SODDING DIVISION 33 - UTILITIES 33 40 00 STORM DRAINAGE UTILITIES PROJECT TABLE OF CONTENTS Page 1 -- 2 of 353 -- Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100 North Auxiliary Airfield 100% Design Submittal -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 2 -- 3 of 353 -- Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100 North Auxiliary Airfield 100% Design Submittal SECTION 01 11 00 SUMMARY OF WORK 06/15 PART 1 GENERAL 1.1 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Utility Outage Requests; G Road Closure Requests; G Air Force Work Clearance Permit; G 1.2 WORK COVERED BY CONTRACT DOCUMENTS The work includes but not limited to mill and overlay of Taxiways Alpha & Bravo, addition of shoulders, new lighting and signage, and regrading clear area. 1.2.1 Location The work shall be located at North Auxiliary Airfield in North, South Carolina, approximately as indicated on drawings. The exact location will be shown by the Contracting Officer. 1.3 EXISTING WORK In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements": a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. 1.4 ON-SITE PERMITS Obtain a work clearance/digging permit prior to start of excavation. The Contractor is responsible for marking and verifying all utilities. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in SECTION 01 11 00 Page 1 -- 4 of 353 -- Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100 North Auxiliary Airfield 100% Design Submittal grade can be made. 1.4.1 Notifications Notify the Contracting Officer at least 72 hours prior to starting excavation work. 1.4.2 Outage Requests Utility outages and road closures required during the prosecution of work shall be arranged for the convenience of the Government. Utility outages and connections shall be scheduled outside regular working hours. Utility outage, and road closure requests shall be submitted to the Contracting Officer for coordination and Government approval at least 21 days prior to the desired outage or closure date. Requests shall clearly identify the need for the outage or closure, the requested date(s) for the outage or closure, the expected length of the outage or closure and proposed backup dates. 1.5 SALVAGE MATERIAL AND EQUIPMENT Items designated by the Contracting Officer to be salvaged remain the property of the Government. The salvaged property shall be segregated, itemized, delivered and off-load ed at the Government designated storage area located salvage property includes but is not limited to all removed fixtures, base plates, spacers, signs, transformers, etcon North Auxillary Airfield. Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Salvaged materials and equipment until disposition by the Contracting Officer. Salvage …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 237310