The Department of Defense is soliciting bids for the repair of Taxiways Alpha and Bravo at North Auxiliary Airfield in South Carolina, focusing on airfield paving, concrete work, striping, joint sealing, and lighting. This opportunity is set aside for small businesses, making it suitable for contractors with relevant experience in multi-discipline construction efforts. Note that the solicitation is competitive, and no award will be made until funds are available, so interested parties should track the notice for updates rather than immediately bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Repair Taxiway
Alpha & Bravo
at
North Auxiliary Airfield
North, South Carolina
Orangeburg County
Specifications
April 21, 2017
100% Design Submittal
Project Manager: Greg Jones, P.E.
gregj@adcengineering.com
JBC Project No. SBML 12-1100
ADC Project No. 16222
-- 1 of 353 --
Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100
North Auxiliary Airfield 100% Design Submittal
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 PROJECT SCHEDULE AND PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 23 OPERATIONAL SAFETY ON AIRFIELDS DURING CONSTRUCTION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 54 00.00 31 GREEN PROCUREMENT
01 57 19.00 31 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 31 ENVIRONMENTAL PROTECTION
01 74 19.00 31 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 01 00.00 GEOTECHNICAL DATA
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 22 - PLUMBING
22 05 83.63 CURED-IN-PLACE PIPE (CIPP) LINING
DIVISION 26 - ELECTRICAL
26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COAT
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
PROJECT TABLE OF CONTENTS Page 1
-- 2 of 353 --
Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100
North Auxiliary Airfield 100% Design Submittal
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
-- 3 of 353 --
Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100
North Auxiliary Airfield 100% Design Submittal
SECTION 01 11 00
SUMMARY OF WORK
06/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When
used, a designation following the "G" designation identifies the office
that will review the submittal for the Government. The following shall be
submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests; G
Road Closure Requests; G
Air Force Work Clearance Permit; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
The work includes but not limited to mill and overlay of Taxiways Alpha &
Bravo, addition of shoulders, new lighting and signage, and regrading clear
area.
1.2.1 Location
The work shall be located at North Auxiliary Airfield in North, South
Carolina, approximately as indicated on drawings. The exact location will
be shown by the Contracting Officer.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation,
Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or
damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered
during construction operations to match existing or adjoining work, as
approved by the Contracting Officer. At the completion of operations,
existing work must be in a condition equal to or better than that which
existed before new work started.
1.4 ON-SITE PERMITS
Obtain a work clearance/digging permit prior to start of excavation. The
Contractor is responsible for marking and verifying all utilities. Verify
the elevations of existing piping, utilities,and any type of underground or
encased obstruction not indicated to be specified or removed but indicated
or discovered in locations to be traversed by piping, ducts, and other work
to be conducted or installed. Verify elevations before installing new work
closer than nearest manhole or other structure at which an adjustment in
SECTION 01 11 00 Page 1
-- 4 of 353 --
Repair Taxiway Alpha & Bravo JBC Project No. SBML 12-1100
North Auxiliary Airfield 100% Design Submittal
grade can be made.
1.4.1 Notifications
Notify the Contracting Officer at least 72 hours prior to starting
excavation work.
1.4.2 Outage Requests
Utility outages and road closures required during the prosecution of work
shall be arranged for the convenience of the Government. Utility outages
and connections shall be scheduled outside regular working hours. Utility
outage, and road closure requests shall be submitted to the Contracting
Officer for coordination and Government approval at least 21 days prior to
the desired outage or closure date. Requests shall clearly identify the
need for the outage or closure, the requested date(s) for the outage or
closure, the expected length of the outage or closure and proposed backup
dates.
1.5 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the
property of the Government.
The salvaged property shall be segregated, itemized, delivered and off-load
ed at the Government designated storage area located salvage property
includes but is not limited to all removed fixtures, base plates, spacers,
signs, transformers, etcon North Auxillary Airfield.
Contractor shall maintain property control records for material or
equipment designated as salvage. Contractor's system of property control
may be used if approved by the Contracting Officer. Salvaged materials and
equipment until disposition by the Contracting Officer. Salvage …