RF Roof Replacement Project

ENERGY, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
RFP27-005JR
NAICS
238160
PSC
Y1EZ
Set-aside
No Set aside used
Posted
November 9, 2026
Response due
December 10, 2026
Place of performance
Princeton, NJ

What this opportunity is

The Department of Energy is seeking a contractor to replace roofs on two buildings at the Princeton Plasma Physics Laboratory in New Jersey, specifically the C40 RF Building and C41 CS Building. This opportunity is open to all businesses, as there is no set-aside. Interested contractors should note that this is a combined synopsis/solicitation, meaning they will need to track the project closely and prepare for a site visit and pre-bid meeting scheduled for November 17, 2026, to access project drawings.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Princeton Plasma Physics Laboratory – RF Roof Replacement Issued for Bid September 26, 2025 -- 1 of 406 -- 341 Nassau Street, Princeton, NJ 08540 t 609.924.6409 MICHAELGRAVES.COM -- 2 of 406 -- Princeton Plasma Physics Laboratory – RF Roof Replacement 09/26/26 Issued For Bid TABLE OF CONTENTS DIVISION 1 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 000000 PROJECT MANUAL COVER PAGE 000101 PROJECT TITLE PAGE DIVISION 1 - GENERAL REQUIREMENTS SECTION 010010 012200 GENERAL REQUIREMENTS R4 UNIT PRICES 012900 PAYMENT PROCEDURES R3 013100 ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS R4 013119 MEETINGS R2 013200 SCHEDULE AND PROGRESS DOCUMENTATION R2 013300 SUBMITTALS R2 013514 BUILDING INFORMATION MODELING (BIM) REQUIREMENTS R2 014100 QUALITY REQUIREMENTS R2 015000 TEMPORARY FACILITIES AND CONTROLS R2 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL R2 017700 CLOSEOUT PROCEDURES R2 017823 OPERATION AND MAINTENANCE DATA R2 017836 WARRANTIES R2 017900 DEMONSTRATION AND TRAINING R2 018113 SUSTAINABLE DESIGN REQUIREMENTS R2 018119 INDOOR AIR QUALITY DURING CONSTRUCTION R2 019113 GENERAL COMMISSIONING REQUIREMENTS R3 DIVISION 2 - EXISTING CONDITIONS SECTION 024119 SELECTIVE DEMOLITION AND ALTERATION WORK DIVISION 3 - CONCRETE SECTION 033000 CAST-IN-PLACE CONCRETE 035114 CEMENTITIOUS ROOF DECK -- 3 of 406 -- Princeton Plasma Physics Laboratory – RF Roof Replacement 09/26/26 Issued For Bid DIVISION 4 - MASONRY SECTION 040120 MAINTENANCE OF UNIT MASONRY 042000 UNIT MASONRY DIVISION 5 - METALS SECTION 051200 STRUCTURAL STEEL 055000 MISCELLANEOUS METALS 055100 METAL STAIRS 055300 METAL GRATINGS DIVISION 6 - WOOD, PLASTICS AND COMPOSITES DIVISION 7 - THERMAL AND MOISTURE PROTECTION SECTION 070150 MAINTENANCE OF MEMBRANE ROOFING 072216 ROOF BOARD INSULATION 072700.23 SELF-ADHERING VAPOR PERMEABLE AIR BARRIER MEMBRANE 076200 SHEET METAL FLASHING AND TRIM 077100 ROOF SPECIALTIES AND ACCESSORIES 079200 JOINT SEALERS DIVISION 8 - OPENINGS SECTION 081113 STEEL DOORS AND FRAMES 087100 FINISH HARDWARE DIVISION 9 - FINISHES SECTION 099000 PAINTING AND FINISHING DIVISION 10 - SPECIALTIES SECTION 101100 VISUAL DISPLAY DIVISION 11 - EQUIPMENT -- 4 of 406 -- Princeton Plasma Physics Laboratory – RF Roof Replacement 09/26/26 Issued For Bid SECTION 118129 HORIZONTAL FALL PROTECTION DIVISION 21 - FIRE PROTECTION DIVISION 22 – PLUMBING SECTION 220000 220517 GENERAL PLUMBING REQUIREMENTS SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220518 ESCUTCHEONS FOR PLUMBING PIPING 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220719 PLUMBING PIPING INSULATION 221413 221423 STORM DRAINAGE PIPING STORM DRAINAGE PIPING SPECIALTIES DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING SECTION 230000 230500 GENERAL MECHANICAL REQUIREMENTS HVAC ROOF ACCESSORIES 230713 DUCT INSULATION 230719 HVAC PIPING INSULATION 232300 REFRIGERANT PIPING 233113 METAL DUCTS DIVISION 26 – ELECTRICAL SECTION 260000 260529 260533 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING -- 5 of 406 -- Princeton Plasma Physics Laboratory – RF Roof Replacement 09/26/26 Issued For Bid GENERAL REQUIREMENTS 010010 - 1 SECTION 010010 – GENERAL REQUIREMENTS PART 1 GENERAL 2 1.1 PURPOSE 2 1.2 SUMMARY 2 1.3 REFERENCES 2 1.4 SITE LOCATION 3 1.5 3 3 1.6 DESCRIPTION OF WORK 4 1.7 MATERIALS & EQUIPMENT FURNISHED BY 44 1.8 BUY AMERICAN ACT 4 1.9 SERVICES FURNISHED BY 44 1.10 ITEMS AFFECTING WORK PLANNING 4 1.11 ELECTRONIC PROJECT DRAWINGS 6 1.12 PARKING AND STAGING AREA 6 1.13 SITE ACCESS AND HAULING 6 1.14 TRANSPORTATION OF EQUIPMENT AND MATERIALS 7 1.15 TEMPORARY SERVICES AND FACILITIES 7 1.16 89 1.17 MATERIAL SUBSTITUTIONS 9 1.18 DOCUMENTATION 10 1.19 SUBCONTRACTOR’S REQUESTS FOR INFORMATION (RFI) 11 PART 2 PRODUCTS - Not Used 12 PART 3 EXECUTION 12 3.1 NOTICE TO PROCEED 12 3.2 CONSTRUCTION SCHEDULE 13 3.3 QUALITY CONTROL AND CONTROL OF INSTALLATION 13 3.4 ACCEPTANCE 14 -- 6 of 406 -- Princeton Plasma Physics Laboratory – RF Roof Replacement 09/26/26 Issued For Bid GENERAL REQUIREMENTS 010010 - 2 SECTION 010010 – GENERAL REQUIREMENTS PART 1 GENERAL 1.1 PURPOSE A. The following specification provides the project-specific requirements that are supplementary to the requirements of the PPPL General Provisions for Non- Commercial Subcontracts, Part G - Provisions & Conditions for Fixed Price Construction Subcontracts B. The Subcontractor is required to plan, control, and deliver the final project according to the project subcontract documents. The project must possess complete functional systems and be assembled safely and in quality fashion following industry standards, regulatory requirements, and best practices. The Subcontractor is required to complete the project within the specified time. 1.2 SUMMARY A. The Subcontractor shall provide in the performance of the work under this subcontract all labor, materials, equipment, transportation, services, occupational exposure monitoring and supervision required to maintain work sites that meet the ES&H requirements found in Section 013100. B. All major elements of the work are believed to be adequately described herein. The Subcontractor is expected, as a requirement of the Subcontractor’s qualifications, to utilize his or her knowledge and experience to anticipate, and include in the cost of the work any incidentals of work which may be required, but are not specifically expressed herein, in order to provide a complete and fully functional facility and/or system. C. Definitions and roles and responsibilities can be found in Section 013100. 1.3 REFERENCES A. The publications listed below form a part of this subcontract to the extent referenced. 1. Subcontract Agreement 2. PPPL General Provisions for …

Source: SAM.gov, as posted. Verify the current solicitation before responding.