What this opportunity is
The Department of Energy is seeking a contractor to replace roofs on two buildings at the Princeton Plasma Physics Laboratory in New Jersey, specifically the C40 RF Building and C41 CS Building. This opportunity is open to all businesses, as there is no set-aside. Interested contractors should note that this is a combined synopsis/solicitation, meaning they will need to track the project closely and prepare for a site visit and pre-bid meeting scheduled for November 17, 2026, to access project drawings.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Princeton Plasma Physics Laboratory –
RF Roof Replacement
Issued for Bid
September 26, 2025
-- 1 of 406 --
341 Nassau Street, Princeton, NJ 08540
t 609.924.6409
MICHAELGRAVES.COM
-- 2 of 406 --
Princeton Plasma Physics Laboratory – RF Roof Replacement
09/26/26 Issued For Bid
TABLE OF CONTENTS
DIVISION 1 – PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION
000000 PROJECT MANUAL COVER PAGE
000101 PROJECT TITLE PAGE
DIVISION 1 - GENERAL REQUIREMENTS
SECTION
010010
012200
GENERAL REQUIREMENTS R4
UNIT PRICES
012900 PAYMENT PROCEDURES R3
013100 ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS R4
013119 MEETINGS R2
013200 SCHEDULE AND PROGRESS DOCUMENTATION R2
013300 SUBMITTALS R2
013514 BUILDING INFORMATION MODELING (BIM) REQUIREMENTS R2
014100 QUALITY REQUIREMENTS R2
015000 TEMPORARY FACILITIES AND CONTROLS R2
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL R2
017700 CLOSEOUT PROCEDURES R2
017823 OPERATION AND MAINTENANCE DATA R2
017836 WARRANTIES R2
017900 DEMONSTRATION AND TRAINING R2
018113 SUSTAINABLE DESIGN REQUIREMENTS R2
018119 INDOOR AIR QUALITY DURING CONSTRUCTION R2
019113 GENERAL COMMISSIONING REQUIREMENTS R3
DIVISION 2 - EXISTING CONDITIONS
SECTION
024119 SELECTIVE DEMOLITION AND ALTERATION WORK
DIVISION 3 - CONCRETE
SECTION
033000 CAST-IN-PLACE CONCRETE
035114 CEMENTITIOUS ROOF DECK
-- 3 of 406 --
Princeton Plasma Physics Laboratory – RF Roof Replacement
09/26/26 Issued For Bid
DIVISION 4 - MASONRY
SECTION
040120 MAINTENANCE OF UNIT MASONRY
042000 UNIT MASONRY
DIVISION 5 - METALS
SECTION
051200 STRUCTURAL STEEL
055000 MISCELLANEOUS METALS
055100 METAL STAIRS
055300 METAL GRATINGS
DIVISION 6 - WOOD, PLASTICS AND COMPOSITES
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
SECTION
070150 MAINTENANCE OF MEMBRANE ROOFING
072216 ROOF BOARD INSULATION
072700.23 SELF-ADHERING VAPOR PERMEABLE AIR BARRIER
MEMBRANE
076200 SHEET METAL FLASHING AND TRIM
077100 ROOF SPECIALTIES AND ACCESSORIES
079200 JOINT SEALERS
DIVISION 8 - OPENINGS
SECTION
081113 STEEL DOORS AND FRAMES
087100 FINISH HARDWARE
DIVISION 9 - FINISHES
SECTION
099000 PAINTING AND FINISHING
DIVISION 10 - SPECIALTIES
SECTION
101100 VISUAL DISPLAY
DIVISION 11 - EQUIPMENT
-- 4 of 406 --
Princeton Plasma Physics Laboratory – RF Roof Replacement
09/26/26 Issued For Bid
SECTION
118129 HORIZONTAL FALL PROTECTION
DIVISION 21 - FIRE PROTECTION
DIVISION 22 – PLUMBING
SECTION
220000
220517
GENERAL PLUMBING REQUIREMENTS
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
220518 ESCUTCHEONS FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND
EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221413
221423
STORM DRAINAGE PIPING
STORM DRAINAGE PIPING SPECIALTIES
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING
SECTION
230000
230500
GENERAL MECHANICAL REQUIREMENTS
HVAC ROOF ACCESSORIES
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
232300 REFRIGERANT PIPING
233113 METAL DUCTS
DIVISION 26 – ELECTRICAL
SECTION
260000
260529
260533
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS
AND CABLING
-- 5 of 406 --
Princeton Plasma Physics Laboratory – RF Roof Replacement
09/26/26 Issued For Bid
GENERAL REQUIREMENTS 010010 - 1
SECTION 010010 – GENERAL REQUIREMENTS
PART 1 GENERAL 2
1.1 PURPOSE 2
1.2 SUMMARY 2
1.3 REFERENCES 2
1.4 SITE LOCATION 3
1.5 3 3
1.6 DESCRIPTION OF WORK 4
1.7 MATERIALS & EQUIPMENT FURNISHED BY 44
1.8 BUY AMERICAN ACT 4
1.9 SERVICES FURNISHED BY 44
1.10 ITEMS AFFECTING WORK PLANNING 4
1.11 ELECTRONIC PROJECT DRAWINGS 6
1.12 PARKING AND STAGING AREA 6
1.13 SITE ACCESS AND HAULING 6
1.14 TRANSPORTATION OF EQUIPMENT AND MATERIALS 7
1.15 TEMPORARY SERVICES AND FACILITIES 7
1.16 89
1.17 MATERIAL SUBSTITUTIONS 9
1.18 DOCUMENTATION 10
1.19 SUBCONTRACTOR’S REQUESTS FOR INFORMATION (RFI) 11
PART 2 PRODUCTS - Not Used 12
PART 3 EXECUTION 12
3.1 NOTICE TO PROCEED 12
3.2 CONSTRUCTION SCHEDULE 13
3.3 QUALITY CONTROL AND CONTROL OF INSTALLATION 13
3.4 ACCEPTANCE 14
-- 6 of 406 --
Princeton Plasma Physics Laboratory – RF Roof Replacement
09/26/26 Issued For Bid
GENERAL REQUIREMENTS 010010 - 2
SECTION 010010 – GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 PURPOSE
A. The following specification provides the project-specific requirements that are
supplementary to the requirements of the PPPL General Provisions for Non-
Commercial Subcontracts, Part G - Provisions & Conditions for Fixed Price
Construction Subcontracts
B. The Subcontractor is required to plan, control, and deliver the final project according
to the project subcontract documents. The project must possess complete
functional systems and be assembled safely and in quality fashion following
industry standards, regulatory requirements, and best practices. The
Subcontractor is required to complete the project within the specified time.
1.2 SUMMARY
A. The Subcontractor shall provide in the performance of the work under this
subcontract all labor, materials, equipment, transportation, services, occupational
exposure monitoring and supervision required to maintain work sites that meet
the ES&H requirements found in Section 013100.
B. All major elements of the work are believed to be adequately described herein. The
Subcontractor is expected, as a requirement of the Subcontractor’s qualifications,
to utilize his or her knowledge and experience to anticipate, and include in the
cost of the work any incidentals of work which may be required, but are not
specifically expressed herein, in order to provide a complete and fully functional
facility and/or system.
C. Definitions and roles and responsibilities can be found in Section 013100.
1.3 REFERENCES
A. The publications listed below form a part of this subcontract to the extent referenced.
1. Subcontract Agreement
2. PPPL General Provisions for …
Source: SAM.gov, as posted. Verify the current solicitation before responding.