Skip to content

Open for responses

Robins RAPID Construction OTA Progressive Design Build Fiber Replacement

DEPT OF DEFENSE

Notice type
Special Notice
Solicitation #
FA8501-27-RAPID-CIRCUIT-F1-170129-OTA
NAICS
236220
PSC
Z2JZ
Set-aside
No Set aside used
Posted
November 6, 2026
Response due
November 20, 2026
Place of performance
Warner Robins, GA

What this opportunity is

The Department of Defense is seeking contractors for a progressive design-build project focused on fiber replacement under the NAICS code 236220. This opportunity is not set aside for small businesses, meaning any business can compete. The notice type is a Special Notice, indicating that interested parties should track the opportunity closely for updates rather than submit formal bids at this stage. The work will take place in Georgia.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

UHHZ170129 STATEMENT OF OBJECTIVE 01005 PDB via Other Transactional Authority STATEMENT OF OBJECTIVE 01005 - 1 of 6 14 OCTOBER 2026 1. PURPOSE AND BACKGROUND 1.1. The objective of this OTA is to execute a Progressive Design-Build (PDB) project to provide all design, engineering, labor, material, plant, equipment, supplies, and coordination required to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. All A&E, engineering, plumbing, HVAC, and electrical work required must be accomplished by personnel and/or businesses with active licenses in the State of Georgia. 1.2. Background: Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces escalating operational risk, mission delays, and compounding economic costs due to infrastructure failure and emergency repair premiums. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. The Design-Builder must have a minimum of five (5) years of experience working on related construction projects. 1.3. OTA & RAPID Framework Approach: This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design Build execution approach under the standalone statutory authority of 10 U.S.C. § 2808a. This effort utilizes a two-phased PDB approach to foster collaboration, innovation, and efficiency: • Phase 1 (Preconstruction & Collaborative Design): Collaborative design development, site surveys, risk mitigation planning, and establishment of an open-book Guaranteed Maximum Price (GMP). • Phase 2 (Final Design & Construction Execution): Completion of final design and full construction execution (exercised upon agreement). 2. EVALUATION AND SELECTION CRITERIA 2.1. Overview The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based strictly on qualifications, experience, and collaborative capabilities: • Step 1 (RAPID Phase 1 Equivalent): Evaluation of written Statements of Qualifications (SOQs) / White Papers. • Step 2 (RAPID Phases 2 Equivalent): Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. 2.2. Step 1: Statement of Qualifications (SOQ) Evaluation Factors The Government will evaluate the written SOQs based on the following factors to select a short-list of the most highly qualified firms to advance to Step 2: • Factor 1: Past Relevant Experience -- 1 of 6 -- UHHZ170129 STATEMENT OF OBJECTIVE 01005 PDB via Other Transactional Authority STATEMENT OF OBJECTIVE 01005 - 2 of 6 14 OCTOBER 2026 o Minimum Requirement: The Design-Builder (and/or key teaming partners) must demonstrate a minimum of five (5) years of experience successfully executing design-build or similar size, scope, and complexity. o Focus: The Government will assess the firm's historical performance, focusing on projects involving occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force standards). Note that while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. • Factor 2: Team Composition and Organization o Focus: The Government will evaluate the proposed organizational structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project manager's ability to oversee operations and coordinate with the Government daily. • Factor 3: Project Approach and Understanding o Focus: The Government will assess the firm's understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design & Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm's strategy for open-book estimating, schedule development, and managing site-specific constraints at Robins AFB (e.g., restricted area access, flightline requirements, and utility outage coordination). 2.3. Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. • Factor 1: Collaborative Capability and Cultural Fit o Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. • Factor 2: Real-Time Problem-Solving and Risk Management o Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. • Factor 3: Innovative Design-Build Solutions o Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives.. • Factor 4: Financial Capacity and Bonding o Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. o …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220