Description
UHHZ170129 STATEMENT OF OBJECTIVE 01005
PDB via Other Transactional Authority
STATEMENT OF OBJECTIVE
01005 - 1 of 6
14 OCTOBER 2026
1. PURPOSE AND BACKGROUND
1.1. The objective of this OTA is to execute a Progressive Design-Build (PDB) project to provide all design,
engineering, labor, material, plant, equipment, supplies, and coordination required to Replace Circuit F-01 from
Fowler Substation at Robins AFB, GA. All A&E, engineering, plumbing, HVAC, and electrical work required
must be accomplished by personnel and/or businesses with active licenses in the State of Georgia.
1.2. Background: Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for
catastrophic failure. If the remaining aged portion is not replaced, the installation faces escalating
operational risk, mission delays, and compounding economic costs due to infrastructure failure and
emergency repair premiums. The work area is slightly congested and impacted by various airfield operations.
The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back
feeding with circuit ties. The Design-Builder must have a minimum of five (5) years of experience working on
related construction projects.
1.3. OTA & RAPID Framework Approach: This project is being executed as an Area of Interest (AOI) under the
overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In
accordance with the RAPID framework, this project utilizes a Progressive Design Build execution approach
under the standalone statutory authority of 10 U.S.C. § 2808a.
This effort utilizes a two-phased PDB approach to foster collaboration, innovation, and efficiency:
• Phase 1 (Preconstruction & Collaborative Design): Collaborative design development, site surveys,
risk mitigation planning, and establishment of an open-book Guaranteed Maximum Price (GMP).
• Phase 2 (Final Design & Construction Execution): Completion of final design and full construction
execution (exercised upon agreement).
2. EVALUATION AND SELECTION CRITERIA
2.1. Overview
The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID
framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated
during the initial selection process. Selection is based strictly on qualifications, experience, and collaborative
capabilities:
• Step 1 (RAPID Phase 1 Equivalent): Evaluation of written Statements of Qualifications (SOQs) /
White Papers.
• Step 2 (RAPID Phases 2 Equivalent): Interactive Pitch Presentations/Interviews and evaluation of the
Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection.
2.2. Step 1: Statement of Qualifications (SOQ) Evaluation Factors
The Government will evaluate the written SOQs based on the following factors to select a short-list of the most
highly qualified firms to advance to Step 2:
• Factor 1: Past Relevant Experience
-- 1 of 6 --
UHHZ170129 STATEMENT OF OBJECTIVE 01005
PDB via Other Transactional Authority
STATEMENT OF OBJECTIVE
01005 - 2 of 6
14 OCTOBER 2026
o Minimum Requirement: The Design-Builder (and/or key teaming partners) must demonstrate a
minimum of five (5) years of experience successfully executing design-build or similar size,
scope, and complexity.
o Focus: The Government will assess the firm's historical performance, focusing on projects
involving occupied facilities, congested site logistics, complex mechanical/electrical system
integrations, and adherence to stringent environmental and safety standards (e.g., hazardous
materials abatement, and experience with Department of War/Air Force standards). Note that
while DoW experience is considered, it will not be a deciding factor in determining a firm more
qualified.
• Factor 2: Team Composition and Organization
o Focus: The Government will evaluate the proposed organizational structure, the integration of
design and construction personnel from project inception, and the qualifications of Key
Personnel. This includes assessing the proposed site superintendent/project manager's ability to
oversee operations and coordinate with the Government daily.
• Factor 3: Project Approach and Understanding
o Focus: The Government will assess the firm's understanding of the PDB OTA process and their
proposed approach to executing Phase 1 (Design & Preconstruction) and Phase 2 (Final Design
& Construction). This includes the firm's strategy for open-book estimating, schedule
development, and managing site-specific constraints at Robins AFB (e.g., restricted area access,
flightline requirements, and utility outage coordination).
2.3. Step 2: Pitch Presentation and Price Evaluation (Final Down-Select)
The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may
assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site
logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule
approach. Specific instructions will be provided with invitation to the pitch day.
• Factor 1: Collaborative Capability and Cultural Fit
o Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project
Delivery Team (PDT) and Base stakeholders.
• Factor 2: Real-Time Problem-Solving and Risk Management
o Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on
response to real-time scenarios presented during the Q&A.
• Factor 3: Innovative Design-Build Solutions
o Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet
the Government’s mission objectives..
• Factor 4: Financial Capacity and Bonding
o Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if
required by the final OTA, sufficient bonding capacity.
o …
Source: SAM.gov, as posted. Verify the current solicitation before responding.