Join The Lazy Contractor's Blueprint live on Nov 28 — show up and get 1,000 free Mindy creditsJoin The Lazy Contractor's Blueprint, free and live on Nov 28
The Department of Defense is seeking sources for the remanufacture of the T-38 Accessory Drive Gearbox, specifically NSN 1680-01-440-5106RP, under NAICS 336413. This opportunity is suitable for small businesses with capabilities in aerospace component overhaul and maintenance. As a Sources Sought notice, it primarily serves to gauge interest and capabilities rather than solicit formal bids, making it essential for interested parties to track the opportunity for future developments rather than prepare immediate proposals.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CUI
CUI
DEPARTMENT OF THE AIR FORCE
Ogden Air Logistics Complex (OO-ALC) AFMC
Hill AFB, UT 84056-5609
Statement of Work (SOW)
ESSENTIAL OVERHAUL FOR:
Dated: 27 May 2026
T-38 Gearbox
NSN: 1680-01-440-5106RP, PN: 14-51100-501/-503
DRAFT DRAFT
DRAFT DRAFT
-- 1 of 20 --
SOW for the Essential Overhaul of T-38 Gearbox
2
CUI
CUI
1.0 Introduction ........................................................................................................................................... 4
2.0 Definitions And Acronyms ................................................................................................................... 4
3.0 Data ........................................................................................................................................................ 7
3.1 Commercial Asset Visibility Air Force (CAV AF) Asset Report .............................................................7
3.2 Contract Depot Maintenance (CDM) Production Report ........................................................................7
3.3 Annual Government Property Physical Inventory Report .......................................................................7
3.4 Teardown Deficiency Report .......................................................................................................................8
3.5 IUID Marking Plan ......................................................................................................................................8
3.6 AFTO Form 95 .............................................................................................................................................8
3.7 Request for Deviation (RFD) .......................................................................................................................8
3.8 Overhaul Data ..............................................................................................................................................8
3.9 Functional Test Data ....................................................................................................................................8
3.10 Quality Deficiency Report .........................................................................................................................8
3.11 IPE report ...................................................................................................................................................8
3.12 Full Support Equipment Report ...............................................................................................................8
3.13 TDP ..............................................................................................................................................................8
3.14 Contract Data Requirements List (CDRL) ..............................................................................................8
4.0 Security .................................................................................................................................................. 9
4.1 Per Export Control Limitations. .................................................................................................................9
5.0 Government Furnished Property (GFP)............................................................................................. 9
5.1 Handling: .................................................................................................................................................... 10
6.0 Supply Chain Requirements .............................................................................................................. 10
7.0 Quality system requirements ............................................................................................................. 10
7.1 Quality Deficiency Reports (QDRs): ........................................................................................................ 10
7.2 PQDR Process: ........................................................................................................................................... 10
8.0 Condemnation ..................................................................................................................................... 10
8.1 Contractor’s Scrap Procedures: ............................................................................................................... 10
8.2 Disposition of Scrap Items: ........................................................................................................................ 11
9.0 Handling............................................................................................................................................... 11
10.0 Teardown Deficiency Inspection...................................................................................................... 11
11.0 Test Equipment Standup .................................................................................................................. 11
12.0 Initial Production Evaluation Requirements ................................................................................. 12
13.0 General Overhaul Requirements..................................................................................................... 13
13.1 Non-Destructive Inspection (NDI) .......................................................................................................... 13
13.2 Mis-Identified Material ............................................................................................................................ 13
14.0 Specific Overhaul Requirements ..................................................................................................... 13
DRAFT DRAFT
DRAFT DRAFT
-- 2 of 20 --
SOW for the Essential Overhaul of T-38 Gearbox
3
CUI
CUI
14.1 Notable Required Capabilities (but not limited to): .............................................................................. 13
14.1.8 Notable High Exp…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.