The Department of Defense is soliciting a Total Small Business Set-Aside for the installation of a supplemental cooling and humidity control system in the Optics Lab at the USACE Mission Support Battalion in Alexandria, VA. The project requires the installation of a new split system with hot gas reheat, refrigerant piping, ductwork, and air distribution systems, and must adhere to industry standards and Unified Facilities Guide Specifications. The notice type is a Combined Synopsis/Solicitation, indicating that the government will track responses rather than issue a formal bid, and the period of performance shall not exceed 150 days from the date of award.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Work (SOW)
Install Supplemental Cooling
USACE Mission Support Battalion
Alexandria, VA 22315
PR&C # W802Y961567766
A. General Overview
This Statement of Work (SOW) details the requirements to install a new supplemental cooling
and humidity control system in the Optics Lab, ensuring precise environmental conditions in
Bldg.2592 CUDE Room 500B located on USACE Mission Support Battalion. The project is to
be executed in a professional manner, adhering to the highest industry standards, with a focus on
environmental responsibility and compliance with Unified Facilities Guide Specifications
(UFGS).
A.1 All work shall be performed during normal working hours while allowing the personnel in
the facility the flexibility to maintain operations during project.
A.2 See below for required work actions. Technical point of contact for questions or project visit
(recommended) is Rodney Roberts, 703-428-6644, room G3 in building 2593. The period of
performance shall not exceed 150 days from date of award. A site visit is available for pricing of
work to be performed.Final Bid Proposal Must be in this format to be Acceptable Bid
1.0 SCOPE OF WORK
The Contractor shall provide all labor, materials, equipment, and supervision necessary to install
one (1) new split system with hot gas reheat in the Optics Lab. The installation must ensure
precise temperature and humidity control in accordance with the manufacturer's specifications
and Federal Acquisition Regulation guidelines for commercial mechanical retrofits.
2.0 SPECIFIC TASKS
The Contractor shall execute the following mechanical and electrical tasks:
2.1 Equipment Installation
• Provide and install one (1) new split air conditioning system equipped with a hot gas
reheat coil for dedicated humidity control.
• Secure and mount the indoor air handler and outdoor condensing unit in coordination
with the Government representative.
2.2 Refrigerant Piping
• Provide and install new refrigerant piping between the indoor and outdoor units.
• Size the refrigerant lines strictly per the equipment manufacturer's specifications to maintain
optimal system pressure and oil return.
2.3 Ductwork and Air Distribution
• Provide and install new supply and return ductwork routed above the existing ceiling
grid.
• Provide and install new duct insulation over all newly installed ductwork to prevent
condensation and energy loss.
-- 1 of 8 --
• Provide and install all new air diffusers in a matte black finish to match the existing
facility aesthetics.
2.4 Electrical Work
• Provide and install new dedicated electrical circuitry for the new split system.
• Run power and control wiring from the existing electrical panel located on the exterior
wall inside the Optics Lab, ensuring compliance with local building codes.
B. General Security Requirements
C.1. All contractor and all associated sub-contractors employees shall comply with
applicable installation, facility and area commander installation/facility access and local
security policies and procedures (provided by government representative). The contractor
shall also provide all information required for background checks or background
investigation and to meet installation/facility access requirements to be accomplished by the
HECSA Security Office. Contractor workforce must comply with all personal identity
verification requirements as directed by DOD, HQDA, and local policy. In addition to the
changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at this facility change, the Government may require changes
in contractor security matters or processes.
C.2. All contract employees, including subcontractor employees who are not in possession of
the appropriate security clearance or access privileges, will be escorted in areas where they
may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
C.3. The Contractor must pre‐screen Candidates using the E‐verify Program
(http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility
requirements. The Vendor must ensure that the employee candidate has two valid forms of
government issued identification prior to enrollment to ensure the correct information is
entered into the E‐verify system. An initial list of verified/eligible employee candidates must
be provided to the COR no later than 3 business days after the initial contract award.
C.4 Contractor and all associated sub-contractors employees shall comply with adjudication
standards and procedures using the National Crime Information Center Interstate
Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive
2014-05 / AR 190-13), applicable installation, facility and area commander
installation/facility access and local security policies and procedures (provided by
government representative, as NCIC and TSDB are available), or, at OCONUS locations, in
accordance with status of forces agreements and other theater regulations.
D. Security Requirements:
D.1 All contractor and all associated sub-contractors employees shall comply with applicable
installation, facility and area commander installation/facility access and local security
policies and procedures (provided by government representative). The contractor shall also
provide all information required for background checks to meet installation/facility access
requirements to be accomplished by installation Provost Marshal Office, Director of
-- 2 of 8 --
Emergency Services or Security Office. Contractor workforce must comply with all personal
identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of
Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the
changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any installation or facility change, the Government may
require changes in contra…