Join The Lazy Contractor's Blueprint live on Nov 28 — show up and get 1,000 free Mindy creditsJoin The Lazy Contractor's Blueprint, free and live on Nov 28
Awarded to FAIRBANKS MORSE, LLC on November 3, 2026
This is an award notice, not an open solicitation. Related open opportunities are listed below.
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
DEPT OF DEFENSE
Notice type
Award Notice
Solicitation #
N5523626R0009
NAICS
333618
PSC
2815
Posted
November 4, 2026
Response due
—
What this opportunity is
The Department of Defense is procuring long lead time material for the USS BOXER (LHD-4) from Fairbanks Morse Defense, as indicated in the sole source Request for Proposal (RFP) N5523626R009. This opportunity falls under NAICS code 333618, which pertains to Other Engine Equipment Manufacturing, and is specifically suited for businesses capable of supplying the required engine components. Since this is a sole source procurement, small businesses should note that there will be no competitive bidding process, and tracking this opportunity may be more relevant than submitting proposals.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Get alerts when DEPT OF DEFENSE posts the next one
Mindy watches SAM.gov every day and emails you new notices that match what you sell — like NAICS 333618. Free daily alerts.