What this opportunity is
The Department of Energy is seeking an integrated manufacturing system for the Oak Ridge National Laboratory, specifically a Mazak FUSE system that includes subtractive machining, wire arc additive manufacturing, and various machine stations and modules. This opportunity is suitable for small businesses under NAICS 333517, particularly those with capabilities in advanced manufacturing technologies. As this is a Combined Synopsis/Solicitation, interested vendors should track the notice for further details and prepare to submit bids accordingly.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Work
Mazak FUSE System
Date: November 4, 2026
Purpose
This document sets forth the Statement of Work (SOW) for services to be provided to UT-Battelle, LLC
(Company), the managing and operating contractor for The Oak Ridge National Laboratory (ORNL),
pursuant to a contract with the U.S. Department of Energy (DOE) on a project known as Research and
Development on New Manufacturing Methods for Defense Castings and Forgings.
Background
ORNL is DOE’s largest science and energy laboratory, located in Oak Ridge, Tennessee, and conducts
research supporting energy, environmental, and national security missions. This procurement supports
ORNL’s Manufacturing Demonstration Facility (MDF) in Knoxville, Tennessee. The project requires an
integrated manufacturing system consisting of subtractive machining, wire arc additive manufacturing
(WAAM), blank machine stations, pallet changer modules, and a two-level PALLETECH system with
associated engineering and interfaces. The heat treatment module interface is included in this scope;
however, the heat treatment module itself is outside this scope
Objectives
The objectives of this subcontract are to:
1. Furnish a fully integrated Mazak FUSE manufacturing system for ORNL MDF.
2. Provide one subtractive machining station, one WAAM station, two blank machine stations, five
pallet changer modules, and one two-level PALLETECH system with 32 pallets and associated
connections and engineering.
3. Complete system engineering and configuration review sufficient to define layout, interfaces,
installation prerequisites, utility requirements, and acceptance criteria.
4. Conduct pre-shipment runoff testing to verify the supplied equipment and integrated functions
against the approved configuration.
5. Deliver, install, and support final acceptance of the system at ORNL MDF in Knoxville, Tennessee.
6. All provided items shall meet published performance specifications as stated by Mazak.
Scope
The Seller shall furnish, configure, integrate, deliver, and install the Mazak FUSE system for ORNL MDF in
Knoxville, Tennessee. The scope includes all equipment, engineering, configuration documentation,
customized system layout, PMC-to-machine connection engineering, pallet handling integration, and the
interface connection to the heat treatment module. The scope also includes runoff testing before
shipment and installation support through final acceptance. The heat treatment module itself is not
included in this subcontract. Scope defines the boundaries of the work; specific performance
requirements are identified in the task sections below.
-- 1 of 6 --
Statement of Work
Mazak FUSE System
Date: November 4, 2026
Tasks
Task 1 – Furnish and Configure Machine Stations
The Seller shall provide the machine stations and associated option packages and pallet changer
specifications identified below:
1.1 Subtractive Machining Station
The Seller shall furnish:
• One (1) Mazak VC-EZ20X subtractive machine
• One (1) VC-EZ20X option package for the VC-EZ20X configuration
• One (1) pallet changer specification for the subtractive machine
1.2 WAAM Station
The Seller shall furnish:
• One (1) base machine for the WAAM station
• One (1) option package for the WAAM machine
• One (1) pallet changer specification for the WAAM machine
• One (1) WAAM configuration package for the additive manufacturing station 1.3 Blank
Machine Stations
The Seller shall furnish:
• Two (2) blank machine configurations
• Two (2) option packages for the blank machines, one per machine
• Two (2) pallet changer specifications for the blank machines, one per machine
The Seller shall ensure all furnished machine stations are compatible with the integrated pallet
handling and PALLETECH system described in this SOW.
Task 2 – Furnish and Integrate Pallet Handling and PALLETECH System
The Seller shall furnish and integrate the pallet handling and PALLETECH system components
identified below.
2.1 Pallet Changer Assemblies
The Seller shall furnish:
• Five (5) pallet changer modules
-- 2 of 6 --
Statement of Work
Mazak FUSE System
Date: November 4, 2026
• Five (5) connection modules linking the machines with the pallet management
controller (PMC)
2.2 Two-Level PALLETECH System
The Seller shall furnish:
• One (1) base unit for the two-level PALLETECH system
• One (1) PALLETECH system option package
• One (1) PMC-to-machine connection package, including the engineering associated
with that connection
• One (1) customized system layout for the integrated system
• One (1) interface connection to the heat treatment module
• One (1) pallet package containing a total of 32 pallets
• One (1) system engineering services package for the integrated equipment and pallet
handling configuration
Task 3 – Perform Engineering and Configuration Review
The Seller shall complete the engineering required for the system configuration and shall
coordinate the machine stations, pallet changer assemblies, PMC connections, PALLETECH system,
and heat treatment interface. System engineering under this task is in addition to the engineering
associated with the PMC-to-machine connection package.
Before design approval, the Seller shall provide ORNL with:
• Proposed layout
• Machine and module configuration
• Interface requirements
• Itemized description of each option package
• Itemized description of each pallet changer specification
• Descriptions of included components and functions sufficient to establish the
configuration to be supplied
The design review shall establish:
• Installation prerequisites
• Utility and facility requirements
• Heat treatment interface boundary
• Runoff acceptance criteria
• Installation acceptance criteria
Task 4 – Provide Deliverable Documentation
-- 3 of 6 --
Statement of Work
Mazak FUSE System
Date: November 4, 2026
The Seller shall provide the complete equipment quantities and configuration packages identified
in Tasks 1 and 2, together with the engineering and customized…
Source: SAM.gov, as posted. Verify the current solicitation before responding.