What this opportunity is

The Department of Energy is seeking an integrated manufacturing system for the Oak Ridge National Laboratory, specifically a Mazak FUSE system that includes subtractive machining, wire arc additive manufacturing, and various machine stations and modules. This opportunity is suitable for small businesses under NAICS 333517, particularly those with capabilities in advanced manufacturing technologies. As this is a Combined Synopsis/Solicitation, interested vendors should track the notice for further details and prepare to submit bids accordingly.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Statement of Work Mazak FUSE System Date: November 4, 2026 Purpose This document sets forth the Statement of Work (SOW) for services to be provided to UT-Battelle, LLC (Company), the managing and operating contractor for The Oak Ridge National Laboratory (ORNL), pursuant to a contract with the U.S. Department of Energy (DOE) on a project known as Research and Development on New Manufacturing Methods for Defense Castings and Forgings. Background ORNL is DOE’s largest science and energy laboratory, located in Oak Ridge, Tennessee, and conducts research supporting energy, environmental, and national security missions. This procurement supports ORNL’s Manufacturing Demonstration Facility (MDF) in Knoxville, Tennessee. The project requires an integrated manufacturing system consisting of subtractive machining, wire arc additive manufacturing (WAAM), blank machine stations, pallet changer modules, and a two-level PALLETECH system with associated engineering and interfaces. The heat treatment module interface is included in this scope; however, the heat treatment module itself is outside this scope Objectives The objectives of this subcontract are to: 1. Furnish a fully integrated Mazak FUSE manufacturing system for ORNL MDF. 2. Provide one subtractive machining station, one WAAM station, two blank machine stations, five pallet changer modules, and one two-level PALLETECH system with 32 pallets and associated connections and engineering. 3. Complete system engineering and configuration review sufficient to define layout, interfaces, installation prerequisites, utility requirements, and acceptance criteria. 4. Conduct pre-shipment runoff testing to verify the supplied equipment and integrated functions against the approved configuration. 5. Deliver, install, and support final acceptance of the system at ORNL MDF in Knoxville, Tennessee. 6. All provided items shall meet published performance specifications as stated by Mazak. Scope The Seller shall furnish, configure, integrate, deliver, and install the Mazak FUSE system for ORNL MDF in Knoxville, Tennessee. The scope includes all equipment, engineering, configuration documentation, customized system layout, PMC-to-machine connection engineering, pallet handling integration, and the interface connection to the heat treatment module. The scope also includes runoff testing before shipment and installation support through final acceptance. The heat treatment module itself is not included in this subcontract. Scope defines the boundaries of the work; specific performance requirements are identified in the task sections below. -- 1 of 6 -- Statement of Work Mazak FUSE System Date: November 4, 2026 Tasks Task 1 – Furnish and Configure Machine Stations The Seller shall provide the machine stations and associated option packages and pallet changer specifications identified below: 1.1 Subtractive Machining Station The Seller shall furnish: • One (1) Mazak VC-EZ20X subtractive machine • One (1) VC-EZ20X option package for the VC-EZ20X configuration • One (1) pallet changer specification for the subtractive machine 1.2 WAAM Station The Seller shall furnish: • One (1) base machine for the WAAM station • One (1) option package for the WAAM machine • One (1) pallet changer specification for the WAAM machine • One (1) WAAM configuration package for the additive manufacturing station 1.3 Blank Machine Stations The Seller shall furnish: • Two (2) blank machine configurations • Two (2) option packages for the blank machines, one per machine • Two (2) pallet changer specifications for the blank machines, one per machine The Seller shall ensure all furnished machine stations are compatible with the integrated pallet handling and PALLETECH system described in this SOW. Task 2 – Furnish and Integrate Pallet Handling and PALLETECH System The Seller shall furnish and integrate the pallet handling and PALLETECH system components identified below. 2.1 Pallet Changer Assemblies The Seller shall furnish: • Five (5) pallet changer modules -- 2 of 6 -- Statement of Work Mazak FUSE System Date: November 4, 2026 • Five (5) connection modules linking the machines with the pallet management controller (PMC) 2.2 Two-Level PALLETECH System The Seller shall furnish: • One (1) base unit for the two-level PALLETECH system • One (1) PALLETECH system option package • One (1) PMC-to-machine connection package, including the engineering associated with that connection • One (1) customized system layout for the integrated system • One (1) interface connection to the heat treatment module • One (1) pallet package containing a total of 32 pallets • One (1) system engineering services package for the integrated equipment and pallet handling configuration Task 3 – Perform Engineering and Configuration Review The Seller shall complete the engineering required for the system configuration and shall coordinate the machine stations, pallet changer assemblies, PMC connections, PALLETECH system, and heat treatment interface. System engineering under this task is in addition to the engineering associated with the PMC-to-machine connection package. Before design approval, the Seller shall provide ORNL with: • Proposed layout • Machine and module configuration • Interface requirements • Itemized description of each option package • Itemized description of each pallet changer specification • Descriptions of included components and functions sufficient to establish the configuration to be supplied The design review shall establish: • Installation prerequisites • Utility and facility requirements • Heat treatment interface boundary • Runoff acceptance criteria • Installation acceptance criteria Task 4 – Provide Deliverable Documentation -- 3 of 6 -- Statement of Work Mazak FUSE System Date: November 4, 2026 The Seller shall provide the complete equipment quantities and configuration packages identified in Tasks 1 and 2, together with the engineering and customized…

Source: SAM.gov, as posted. Verify the current solicitation before responding.