Federal Contractor Profile
Dynetics, INC.
$3.02B obligated·386 awards·4 agencies·24 NAICS
Federal Contracts
Showing contracts 1–50 of 1,164 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Apr 22, 2026 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $510K |
| Mar 19, 2026 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $508K |
| Feb 25, 2026 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $1.5M |
| Feb 12, 2026 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $1.0M |
| Jan 30, 2026 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $333K |
| Jan 30, 2026 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $190K |
| Jan 13, 2026 | Department of DefenseFA8651 AFRL RWK | FA865124FB014 | 541715 | ARTIFICIAL INTELLIGENCE, DEEP LEARNING, AND MACHINE LEARNING FOR MUNITIONS AUTONOMOUS TARGET ACQUISITION | $125K |
| Jan 12, 2026 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $2.0M |
| Dec 23, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0222 | 336414 | FY25 BUY | $6.4M |
| Dec 22, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0074 | 336414 | USFK DO | $11.6M |
| Dec 19, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0115 | 334511 | THIS ACTION WILL SUPPORT THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) PROGRAM. | $2.7M |
| Dec 18, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $3.0M |
| Dec 17, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $8.8M |
| Dec 16, 2025 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $500K |
| Dec 16, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $522K |
| Dec 8, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $19K |
| Dec 4, 2025 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ085926FE485 | 541715 | SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | $500 |
| Dec 2, 2025 | Department of DefenseFA8651 AFRL RWK | FA865124FB014 | 541715 | ARTIFICIAL INTELLIGENCE, DEEP LEARNING, AND MACHINE LEARNING FOR MUNITIONS AUTONOMOUS TARGET ACQUISITION | $312K |
| Nov 25, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0074 | 336414 | USFK DO | $7.0M |
| Nov 25, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0222 | 336414 | FY25 BUY | $177.4M |
| Nov 25, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0021 | 336414 | UCO - GUAM DEFENSE SYSTEMS | $51.0M |
| Nov 25, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA239125CB015 | 541715 | COMBAT REFUELING AND OPERATIONS NETWORKED UNIVERSAL SYSTEMS (CRONUS) - AUTOMATED AIR-TO-AIR REFUELING (A3R) - BOOM AUTOMATION | $700K |
| Nov 7, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $1.6M |
| Oct 23, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $200K |
| Sep 29, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $97K |
| Sep 24, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $173K |
| Sep 22, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA239125CB015 | 541715 | COMBAT REFUELING AND OPERATIONS NETWORKED UNIVERSAL SYSTEMS (CRONUS) - AUTOMATED AIR-TO-AIR REFUELING (A3R) - BOOM AUTOMATION | $52K |
| Sep 20, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $676K |
| Sep 19, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC025F7062 | 336419 | TASK ORDER 018 ADDITIONAL LOADS AND REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM (SLS) UNIVERSAL STAGE ADAPTER (USA) | $424K |
| Sep 19, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0222 | 336414 | FY25 BUY | $45.2M |
| Sep 16, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $257K |
| Sep 15, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB067 | 541330 | THIS WORK EFFORT PROVIDES FOR REVIEW OF LVC TEST ASSET IDENTIFIED DEFICIENCIES AND/OR ISSUES AND UPDATE OF THREAT MODELS AND ANY OTHER ASSOCIATED EQUIPMENT REQUIRED TO ACCOMPLISH SUSTAINMENT OF THE LVC PROJECT. | $1.3M |
| Sep 12, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25C0003 | 336419 | CHGB TPS NTE AWARD | $569K |
| Sep 12, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25C0003 | 336419 | CHGB TPS NTE AWARD | $129.2M |
| Sep 12, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0115 | 334511 | THIS ACTION WILL SUPPORT THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) PROGRAM. | $5.5M |
| Sep 5, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $14.0M |
| Aug 27, 2025 | Department of DefenseFA2384 USAF AFMC AFRL PZL AFRL RAKH | FA238425PB010 | 541715 | JADPACT GENERATING BATTLE COURSES OF ACTION (GBC) DASH EVENT | $10K |
| Aug 26, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB045 | 541330 | RAPID THREAT DEPLOYMENT (RTD) ADVANCED TECHNOLOGY MODEL | $1.6M |
| Aug 21, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $7K |
| Aug 19, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $95K |
| Aug 13, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB040 | 541330 | LIVE 3-1 AND 1-1 MULTI SUT DIS DEPLOYMENT | $4.6M |
| Aug 12, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0063 | 332993 | CONTINUATION ORDER FOR THE TRANSFER OF SMALL GLIDE MUNITIONS SUPPORT SERVICES. U.S. SPECIAL OPERATIONS COMMAND (USSOCOM) PROGRAM EXECUTIVE OFFICE, (PEO-FW) STRIKE DIVISION TO ARMY CONTRACTING COMMAND. | $800K |
| Aug 5, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB038 | 541330 | PROGRAM AND TECHNICAL MANAGEMENT OF SYSTEMS ENGINEERING DESIGN, DEVELOPMENT, FABRICATION, TEST, AND DELIVERY OF NASIC AIR-1 RAPID THREAT DEPLOYMENT (RTD) MODEL(S), TO BE INTEGRATED INTO THE NASIC EWAISF CHIMERA TEST ASSET RADIO FREQUENCY TEST SYSTEM. | $1.5M |
| Jul 31, 2025 | Department of DefenseFA2377 USAF AFMC AFRL PZL AFRL RYKS | FA237725CB023 | 541715 | AERIAL REFUELING BATTLE MANAGEMENT (ARBM) | $1.6M |
| Jul 31, 2025 | Department of DefenseFA8656 AFLCMC EBX | FA865625FB006 | 332993 | HACM MCE PCS - THIS EFFORT REQUIRES PROCUREMENT, INSTALLATION, TEST, AND CHECKOUT OF EQUIPMENT AND TOOLING TO INCREASE CURRENT MANUFACTURING CAPACITY OF THE HACM PCS TO INCREASE THE MANUFACTURING CAPACITY OF THE EXISTING PCS DESIGN. | $7.9M |
| Jul 30, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0222 | 336414 | FY25 BUY | $127.9M |
| Jul 26, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $2.5M |
| Jul 22, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0074 | 336414 | USFK DO | $19.3M |
| Jul 17, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $471K |
| Jul 11, 2025 | Department of DefenseFA2384 USAF AFMC AFRL PZL AFRL RAKH | FA238425PB003 | 541715 | JADPACT DASH MEF | $10K |
Get Alerted Before Dynetics, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free