Federal Contractor Profile
Dynetics, INC.
$3.2B obligated·420 awards·4 agencies·28 NAICS
Federal Contracts
Showing award actions 51–100 of 1,171 funded award actions, most recent first.
- Contracts with positive obligations
- 420
- Funded award actions shown
- 1,171
- Obligations shown
- $3.2B
- Awarding agencies
- 4
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 26, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jul 31, 2025 | Department of DefenseFA2377 USAF AFMC AFRL PZL AFRL RYKS | FA237725CB023 | 541715 | AERIAL REFUELING BATTLE MANAGEMENT (ARBM) | $1.6M |
| Jul 31, 2025 | Department of DefenseFA8656 AFLCMC EBX | FA865625FB006 | 332993 | HACM MCE PCS - THIS EFFORT REQUIRES PROCUREMENT, INSTALLATION, TEST, AND CHECKOUT OF EQUIPMENT AND TOOLING TO INCREASE CURRENT MANUFACTURING CAPACITY OF THE HACM PCS TO INCREASE THE MANUFACTURING CAPACITY OF THE EXISTING PCS DESIGN. | $7.9M |
| Jul 30, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0222 | 336414 | FY25 BUY | $128M |
| Jul 26, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $2.5M |
| Jul 22, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0074 | 336414 | USFK DO | $19M |
| Jul 17, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $471K |
| Jul 11, 2025 | Department of DefenseFA2384 USAF AFMC AFRL PZL AFRL RAKH | FA238425PB003 | 541715 | JADPACT DASH MEF | $10K |
| Jul 10, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $3.6M |
| Jul 3, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA238524CB036 | 541715 | SMALL HYBRID AERIAL REFUELING KIT | $183K |
| Jul 2, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA239125CB015 | 541715 | COMBAT REFUELING AND OPERATIONS NETWORKED UNIVERSAL SYSTEMS (CRONUS) - AUTOMATED AIR-TO-AIR REFUELING (A3R) - BOOM AUTOMATION | $1000K |
| Jul 1, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0021 | 336414 | UCO - GUAM DEFENSE SYSTEMS | $53M |
| Jun 26, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB032 | 541330 | THE WORK EFFORT INCLUDES SUSTAINMENT OF LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) RAPID THREAT DEPLOYMENT (RTD) TEST SYSTEMS IN EWAISF, ROBINS AFB, GA, AND OTHER DEPARTMENT OF DEFENSE (DOD) AGENCIES. | $4.2M |
| Jun 25, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $84K |
| Jun 25, 2025 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $3.0M |
| Jun 10, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0179 | 334511 | THIS TASK ORDER IS FOR EFFORT ON TASK INSTRUCTIONS 0006 AND 0007 UNDER THE BASE IDIQ W31P4Q-23-D-0023. | $311K |
| Jun 2, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $384K |
| Jun 2, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0179 | 334511 | THIS TASK ORDER IS FOR EFFORT ON TASK INSTRUCTIONS 0006 AND 0007 UNDER THE BASE IDIQ W31P4Q-23-D-0023. | $11K |
| May 30, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0063 | 332993 | CONTINUATION ORDER FOR THE TRANSFER OF SMALL GLIDE MUNITIONS SUPPORT SERVICES. U.S. SPECIAL OPERATIONS COMMAND (USSOCOM) PROGRAM EXECUTIVE OFFICE, (PEO-FW) STRIKE DIVISION TO ARMY CONTRACTING COMMAND. | $5.0M |
| May 20, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB020 | 541330 | MANAGE, INTEGRATE, VERIFY, VALIDATE, TEST, AND DELIVER MSIC STIMS-3 MODELS INTEGRATED INTO THE SCALABLE ELECTROMAGNETIC WARFARE AVIONICS INTEGRATION FACILITY (EWAISF) RADAR COMPLEX EMULATOR PLUS (SERCE+) FOR TESTING OF EW SYSTEMS AT RF. | $1.3M |
| May 6, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $2.6M |
| May 1, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $1.1M |
| Apr 25, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0074 | 336414 | USFK DO | $36M |
| Apr 8, 2025 | Department of DefenseFA8651 AFRL RWK | FA865124FB014 | 541715 | ARTIFICIAL INTELLIGENCE, DEEP LEARNING, AND MACHINE LEARNING FOR MUNITIONS AUTONOMOUS TARGET ACQUISITION | $500K |
| Apr 7, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $909K |
| Apr 3, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $500K |
| Mar 26, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0070 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT - CHIMERA | $1.0M |
| Mar 14, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $66K |
| Mar 14, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0070 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT - CHIMERA | $5.2M |
| Mar 14, 2025 | Department of DefenseFA8523 AFLCMC ESKA | FA852325FB009 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT | $1.8M |
| Mar 13, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $198K |
| Mar 10, 2025 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248721F0075 | 541715 | TEST SYSTEMS AND EQUIPMENT CAPABILITIES | $45K |
| Mar 3, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $110K |
| Mar 3, 2025 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC25PA661 | 332999 | EDS COATING | $38K |
| Feb 28, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA238524CB036 | 541715 | SMALL HYBRID AERIAL REFUELING KIT | $288K |
| Feb 26, 2025 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA238524CB036 | 541715 | SMALL HYBRID AERIAL REFUELING KIT | $1.1M |
| Feb 14, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $6.0M |
| Feb 12, 2025 | Department of DefenseFA8651 AFRL RWK | FA865124FB014 | 541715 | ARTIFICIAL INTELLIGENCE, DEEP LEARNING, AND MACHINE LEARNING FOR MUNITIONS AUTONOMOUS TARGET ACQUISITION | $176K |
| Feb 5, 2025 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0202 | 334511 | THIS TASK ORDER FUNDS ADDITIONAL EFFORT ON TASK INSTRUCTION 0002 FOR ORDERING PERIOD 1 UNDER BASE IDIQ W31P4Q-23-D-0023 | $1.5M |
| Jan 24, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $4.8M |
| Jan 6, 2025 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $370K |
| Jan 3, 2025 | Department of DefenseFA2391 USAF AFMC AFRL PZL AFRL RQKP | FA239125CB015 | 541715 | COMBAT REFUELING AND OPERATIONS NETWORKED UNIVERSAL SYSTEMS (CRONUS) - AUTOMATED AIR-TO-AIR REFUELING (A3R) - BOOM AUTOMATION | $938K |
| Jan 3, 2025 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $2.4M |
| Dec 19, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $1.9M |
| Nov 25, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $1.4M |
| Nov 25, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $775K |
| Nov 25, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $654K |
| Nov 21, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q25C0003 | 336419 | CHGB TPS NTE AWARD | $66M |
| Nov 14, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $1.6M |
| Nov 14, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q25F0021 | 336414 | UCO - GUAM DEFENSE SYSTEMS | $100M |
| Nov 8, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC025F7007 | 336419 | RISK REDUCTION TESTING FOR ADDITIONAL RESPONSE INSTRUMENTATION TO BE MOUNTED TO THE RESONATOR DURING ITS QUALIFICATION VIBRATION TEST | $210K |
Get Alerted Before Dynetics, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free