Federal Contractor Profile
Dynetics, INC.
$3.2B obligated·420 awards·4 agencies·28 NAICS
Federal Contracts
Showing award actions 101–150 of 1,171 funded award actions, most recent first.
- Contracts with positive obligations
- 420
- Funded award actions shown
- 1,171
- Obligations shown
- $3.2B
- Awarding agencies
- 4
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 26, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 1, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $1.1M |
| Oct 22, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $5.8M |
| Sep 26, 2024 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0070 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT - CHIMERA | $2.3M |
| Sep 25, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $468K |
| Sep 17, 2024 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0059 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT | $4.1M |
| Sep 17, 2024 | Department of DefenseFA8523 AFLCMC ESKA | FA852324F0064 | 541330 | LABORATORY INTELLIGENCE VALIDATED EMULATOR (LIVE) VIRTUAL CONSTRUCTIVE (LVC) PRODUCTION AND SUSTAINMENT | $4.9M |
| Sep 16, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0202 | 334511 | THIS TASK ORDER FUNDS ADDITIONAL EFFORT ON TASK INSTRUCTION 0002 FOR ORDERING PERIOD 1 UNDER BASE IDIQ W31P4Q-23-D-0023 | $9.2M |
| Sep 11, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $625K |
| Sep 11, 2024 | Department of DefenseW6QK ACC-RSA | W9126018FD501 | 541712 | THIS IS A RESEARCH AND DEVELOPMENT EFFORT TO PROCURE HIGH ALTITUDE/SPACE CAPABLE TACTICAL SPACE SUPPORT PAYLOADS WHICH MEET THE CLASSIFIED PERFORMANCE REQUIREMENTS, INTEGRATE THOSE PAYLOADS INTO COMMERCIALLY AVAILABLE SPACE QUALIFIED SMALL SATELLITE PLATFORMS AND SUPPORT A ONE-YEAR ON-ORBIT DEMONSTRATION. | $3K |
| Sep 5, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $2.1M |
| Aug 29, 2024 | Department of DefenseFA8656 AFLCMC EBX | FA865624FB013 | 332993 | DELIVERY ORDER UNDER THE EGLIN WIDE AGILE ACQUISITION CONTRACT (EWAAC) INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) TO PERFORM THE TASKS NECESSARY TO PRODUCE ALL REQUIRED AURS, TM KITS, AND WDL KITS. | $53M |
| Aug 29, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $19K |
| Aug 28, 2024 | Department of DefenseFA2385 USAF AFMC AFRL PZL AFRL RSKD | FA238524CB036 | 541715 | SMALL HYBRID AERIAL REFUELING KIT | $543K |
| Aug 27, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248624FB016 | 541715 | THE PURPOSE OF THIS DELIVERY ORDER IS TO PROVIDE PCBS, FOR INTEGRATION INTO THE HITL. | $12M |
| Aug 27, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q23F0300 | 334511 | DELIVERY OF HARDWARE AND TECHNICAL SUPPORT FOR SUSTAINMENT AND ENGINEERING SERVICES (ES) ACTIVITIES FOR THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) SYSTEM. | $145K |
| Aug 15, 2024 | General Services AdministrationGSA FAS AAS REGION 7 | 47QFWA24F0006 | 541712 | CCM BRIDGE | $145K |
| Aug 9, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $2.5M |
| Aug 8, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $601K |
| Aug 7, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $2.5M |
| Aug 6, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $190K |
| Jul 31, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0179 | 334511 | THIS TASK ORDER IS FOR EFFORT ON TASK INSTRUCTIONS 0006 AND 0007 UNDER THE BASE IDIQ W31P4Q-23-D-0023. | $7.5M |
| Jul 12, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $9.0M |
| Jul 2, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q23F0300 | 334511 | DELIVERY OF HARDWARE AND TECHNICAL SUPPORT FOR SUSTAINMENT AND ENGINEERING SERVICES (ES) ACTIVITIES FOR THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) SYSTEM. | $478K |
| Jun 27, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $410K |
| Jun 20, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $33K |
| Jun 13, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $57K |
| Jun 6, 2024 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC24PB170 | 334515 | EDS GLASS COVER | $19K |
| May 30, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $279K |
| May 29, 2024 | General Services AdministrationGSA FAS AAS REGION 7 | 47QFWA24F0006 | 541712 | CCM BRIDGE | $483K |
| May 24, 2024 | Department of DefenseFA8656 AFLCMC EBX | FA865624FB004 | 332993 | SMALL GLIDE MUNITIONS SUPPORT SERVICES | $5.5M |
| May 16, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q24F0018 | 334511 | THIS TASK ORDER FUNDS TASK INSTRUCTIONS 0004 AND 0005 UNDER THE BASE IDIQ CONTRACT W31P4Q-23--D-0023. | $101K |
| May 15, 2024 | Department of DefenseFA2487 AFTC PZZD (EGLIN) | FA248720F4913 | 336419 | TEST&EVALUATION TECHNOLOGIES FOR RANGES, ARMAMENTS AND SPECTRUM (TETRAS) MID-PRESSURE ARC HEATER (MPAH) POWER SUPPLY | $13M |
| May 2, 2024 | General Services AdministrationGSA FAS AAS REGION 7 | 47QFWA24F0006 | 541712 | CCM BRIDGE | $193K |
| Apr 30, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $1.3M |
| Apr 30, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $3.2M |
| Apr 26, 2024 | Department of DefenseFA8656 AFLCMC EBX | FA865624FB004 | 332993 | SMALL GLIDE MUNITIONS SUPPORT SERVICES | $500K |
| Apr 12, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021C0009 | 336419 | LETTER CONTRACT FOR LASER AIR MONITORING SYSTEM | $194K |
| Apr 12, 2024 | Department of DefenseFA8651 AFRL RWK | FA865124FB014 | 541715 | ARTIFICIAL INTELLIGENCE, DEEP LEARNING, AND MACHINE LEARNING FOR MUNITIONS AUTONOMOUS TARGET ACQUISITION | $227K |
| Apr 4, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $1.4M |
| Mar 26, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $99K |
| Mar 25, 2024 | General Services AdministrationGSA FAS AAS REGION 7 | 47QFWA24F0006 | 541712 | CCM BRIDGE | $145K |
| Mar 20, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q23F0300 | 334511 | DELIVERY OF HARDWARE AND TECHNICAL SUPPORT FOR SUSTAINMENT AND ENGINEERING SERVICES (ES) ACTIVITIES FOR THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) SYSTEM. | $204K |
| Mar 7, 2024 | General Services AdministrationGSA FAS AAS REGION 3 | 47QFMA23F0009 | 541330 | TECHNOLOGY VULNERABILITY ANALYSIS II | $354K |
| Mar 6, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $2.5M |
| Feb 28, 2024 | Department of DefenseFA2486 AFTC PZZC (EGLIN) | FA248720F0072 | 541715 | GUIDED WEAPONS EVALUATION FACILITY RADIO FREQUENCY MODERNIZATION | $3.9M |
| Feb 23, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC017C0008 | 336419 | IGF::OT::IGF NASA HAS A REQUIREMENT FOR THE SPACE LAUNCH SYSTEM UNIVERSAL STAGE ADAPTER THAT WILL STRUCTURALLY CONNECT THE EXPLORATION UPPER STAGE TO THE ORION SPACECRAFT. SLS IS BEING DEVELOPED TO PROVIDE HEAVY LIFT LAUNCH AND IN SPACE PROPULSION CAPABILITY TO ENABLE BOTH EXPLORATION AND EXTENSION OF HUMAN PRESENCE THROUGHOUT THE SOLAR SYSTEM. THE USA MEETS THAT NEED, AND ALSO PROVIDES THE CAPABILITY TO ENCAPSULATE LARGE CO MANIFESTED AND SECONDARY PAYLOADS. SLS WILL MEET THESE OBJECTIVES THROUGH AN EVOLUTIONARY BLOCK UPGRADE STRATEGY. THE BLOCK 1 SLS CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE EXPLORATION MISSION 1 FLIGHT TEST, WHILE THE BLOCK 1B CONFIGURATION IS BEING DEVELOPED TO LAUNCH THE CREWED EM 2 FLIGHT TEST AND FUTURE CREWED AND CARGO MISSIONS. THE PURPOSE OF THE USA CONTRACT IS FOR THE PRIME CONTRACTOR TO PRODUCE THE USA STRUCTURE FOR THE SLS PROGRAM. THE CONTRACT WILL BE COMPRISED OF ONE BASE PERIOD AND SIX SEPARATE OPTION PERIODS. DURING THE BASE PERIOD, THE CONTRACTOR WILL DESIGN, DEVELOP, TEST, EVALUATE, PRODUCE, AND DELIVER A USA FOR EM 2, AS WELL AS PROVIDE POST DELIVERY VEHICLE INTEGRATION AND SUPPORT. DURING THE CONTRACTS SIX SEPARATE OPTION PERIODS, THE CONTRACTOR WILL PRODUCE AND DELIVER THE USAS FOR EM 3 THROUGH EM 8. FOR BOTH THE BASE AND OPTION PERIODS, THE CONTRACT PROVIDES THAT NASA MAY REQUEST THAT THE CONTRACTOR PERFORM INDEFINITE DELIVERY INDEFINITE QUANTITY TASKS WHEREBY STUDIES, ANALYSES, AND OR INTEGRATION SUPPORT MAY BE ORDERED. | $3.8M |
| Feb 16, 2024 | Department of DefenseW6QK ACC-RSA | W31P4Q23F0300 | 334511 | DELIVERY OF HARDWARE AND TECHNICAL SUPPORT FOR SUSTAINMENT AND ENGINEERING SERVICES (ES) ACTIVITIES FOR THE ARMY LONG-RANGE PERSISTENT SURVEILLANCE (ALPS) SYSTEM. | $212K |
| Feb 15, 2024 | Department of DefenseFA2487 AFTC PZZD (EGLIN) | FA248720F4913 | 336419 | TEST&EVALUATION TECHNOLOGIES FOR RANGES, ARMAMENTS AND SPECTRUM (TETRAS) MID-PRESSURE ARC HEATER (MPAH) POWER SUPPLY | $4.8M |
| Feb 1, 2024 | Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV | N6833524P0115 | 334515 | DETECTOR STANDARD | $38K |
| Jan 30, 2024 | Department of DefenseW6QK ACC CCDC STTC | W912CG23C0013 | 541715 | BAA - SECURE ADVANCE FRAMEWORK FOR SIMULATION AND MODELING (SAFE-SIM) CONSTRUCTOR | $225K |
Get Alerted Before Dynetics, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free