Skip to content
Home/Contractors/Fort Myer Construction Corp

Federal Contractor Profile

Fort Myer Construction Corp

Federal contracting record: $259M obligated across 12 awards from 4 agencies, FY 2016–2026.

$259M
Total Obligated
12
Award Records
4
Agencies Served
3
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

WMADX6Z5RPJ9

CAGE Code

0LSD8

Address

2237 33RD ST NE, WASHINGTON, DC, 200181505

First Federal Award

Oct 28, 2015

Most Recent Award

Sep 17, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    8 awards

    $256M
  • 324121

    ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING

    1 awards

    $256K
  • 238210

    ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS

    2 awards

    $92K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Sep 17, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$2.0M
Jun 1, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON$1.4M
Sep 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON$44M
Sep 9, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$8.2M
Aug 11, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$461K
Jun 2, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$1.3M
Aug 26, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$67K
Aug 8, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$150K
Apr 4, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$81K
Jan 18, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$752K
Jul 18, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$155K
Mar 7, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$270K
Sep 15, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$221K
Sep 14, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT VA ST TFHRC 50(5): THE PROJECT INCLUDES EXCAVATING THE EXISTING TEST LANES, CONSTRUCTING UNDERGROUND CONCRETE WALLS, UNDERDRAIN AND STORM DRAIN SYSTEMS, SANITARY SEWER LINE, WATERLINE SYSTEM, ELECTRICAL CONDUIT SYSTEM, DRAINAGE IMPROVEMENT,$4.7M
May 16, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$65K
Dec 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$161M
Aug 19, 2020National Gallery of ArtNGA PROCUREMENT CONTRACTS324121ASPHALT REPAVING$256K
Sep 13, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$404K
Jun 13, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$56K
Sep 6, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$119K
Jul 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$71K
Jun 20, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-GWMP 500(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOUTH EXIT AND VA ROUTE 233 BRIDGES OVER THE GEORGE WASHINGTON MEMORIAL PARKWAY, AND IMPROVEMENTS TO THE MOUNT VERNON TRAIL NEAR RONALD REAGAN WASHINGTON NATIONAL AIRPORT. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS FOR THE PIERS, SIDEWALK, AND UNDERSIDE OF THE SUPERSTRUCTURE; EPOXY INJECTION CRACK REPAIRS; BARRIER AND BRIDGE RAIL REPLACEMENT, REPAIRS, AND PAINTING; LATEX MODIFIED CONCRETE OVERLAY OF THE BRIDGE DECK; AND OTHER MISCELLANEOUS WORK. THE TRAIL AND ROADWAY WORK INCLUDES EARTHWORK, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY GUARDWALL CONSTRUCTION, UTILITY REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$66K
Apr 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$205K
Aug 31, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$360K
Aug 24, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISION237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$78K

Want to win work like Fort Myer Construction Corp?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.