Federal Contractor Profile
Fort Myer Construction Corp
Federal contracting record: $259M obligated across 12 awards from 4 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
WMADX6Z5RPJ9
CAGE Code
0LSD8
Address
2237 33RD ST NE, WASHINGTON, DC, 200181505
First Federal Award
Oct 28, 2015
Most Recent Award
Sep 17, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Transportation$256M
99.9% of total obligations
- $256K
National Gallery of Art
0.1% of total obligations
- General Services Administration$92K
0.0% of total obligations
- Department of the Interior$0
0.0% of total obligations
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Sep 17, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $2.0M |
| Jun 1, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON | $1.4M |
| Sep 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON | $44M |
| Sep 9, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $8.2M |
| Aug 11, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $461K |
| Jun 2, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $1.3M |
| Aug 26, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $67K |
| Aug 8, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $150K |
| Apr 4, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $81K |
| Jan 18, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $752K |
| Jul 18, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $155K |
| Mar 7, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $270K |
| Sep 15, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $221K |
| Sep 14, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA ST TFHRC 50(5): THE PROJECT INCLUDES EXCAVATING THE EXISTING TEST LANES, CONSTRUCTING UNDERGROUND CONCRETE WALLS, UNDERDRAIN AND STORM DRAIN SYSTEMS, SANITARY SEWER LINE, WATERLINE SYSTEM, ELECTRICAL CONDUIT SYSTEM, DRAINAGE IMPROVEMENT, | $4.7M |
| May 16, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $65K |
| Dec 7, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | $161M |
| Aug 19, 2020 | National Gallery of ArtNGA PROCUREMENT CONTRACTS | 324121 | ASPHALT REPAVING | $256K |
| Sep 13, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $404K |
| Jun 13, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $56K |
| Sep 6, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $119K |
| Jul 30, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $71K |
| Jun 20, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-GWMP 500(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOUTH EXIT AND VA ROUTE 233 BRIDGES OVER THE GEORGE WASHINGTON MEMORIAL PARKWAY, AND IMPROVEMENTS TO THE MOUNT VERNON TRAIL NEAR RONALD REAGAN WASHINGTON NATIONAL AIRPORT. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS FOR THE PIERS, SIDEWALK, AND UNDERSIDE OF THE SUPERSTRUCTURE; EPOXY INJECTION CRACK REPAIRS; BARRIER AND BRIDGE RAIL REPLACEMENT, REPAIRS, AND PAINTING; LATEX MODIFIED CONCRETE OVERLAY OF THE BRIDGE DECK; AND OTHER MISCELLANEOUS WORK. THE TRAIL AND ROADWAY WORK INCLUDES EARTHWORK, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY GUARDWALL CONSTRUCTION, UTILITY REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | $66K |
| Apr 30, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $205K |
| Aug 31, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $360K |
| Aug 24, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | $78K |
Want to win work like Fort Myer Construction Corp?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.