Home/Contractors/Fort Myer Construction CORP/contracts

Federal Contractor Profile

Fort Myer Construction CORP

$256.6M obligated·12 awards·4 agencies·3 NAICS

Federal Contracts

Showing contracts 134 of 34 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Sep 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325C000018237310THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON$44.4M
Sep 9, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$8.2M
Aug 11, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$461K
Jun 2, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$1.3M
Aug 26, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$67K
Aug 8, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$150K
Apr 4, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$81K
Jan 18, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$752K
Jul 18, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$155K
Mar 7, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$270K
Sep 15, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$221K
Sep 14, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000018237310PROJECT VA ST TFHRC 50(5): THE PROJECT INCLUDES EXCAVATING THE EXISTING TEST LANES, CONSTRUCTING UNDERGROUND CONCRETE WALLS, UNDERDRAIN AND STORM DRAIN SYSTEMS, SANITARY SEWER LINE, WATERLINE SYSTEM, ELECTRICAL CONDUIT SYSTEM, DRAINAGE IMPROVEMENT,$4.7M
May 16, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$65K
Dec 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000001237310NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL$161.3M
Aug 19, 2020National Gallery of ArtNGA PROCUREMENT CONTRACTS33301120PFP0009324121ASPHALT REPAVING$256K
Sep 13, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$404K
Jun 13, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$56K
Sep 6, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$119K
Jul 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$71K
Jun 20, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00023237310IGF::OT::IGF PROJECT: PRA-GWMP 500(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOUTH EXIT AND VA ROUTE 233 BRIDGES OVER THE GEORGE WASHINGTON MEMORIAL PARKWAY, AND IMPROVEMENTS TO THE MOUNT VERNON TRAIL NEAR RONALD REAGAN WASHINGTON NATIONAL AIRPORT. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS FOR THE PIERS, SIDEWALK, AND UNDERSIDE OF THE SUPERSTRUCTURE; EPOXY INJECTION CRACK REPAIRS; BARRIER AND BRIDGE RAIL REPLACEMENT, REPAIRS, AND PAINTING; LATEX MODIFIED CONCRETE OVERLAY OF THE BRIDGE DECK; AND OTHER MISCELLANEOUS WORK. THE TRAIL AND ROADWAY WORK INCLUDES EARTHWORK, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY GUARDWALL CONSTRUCTION, UTILITY REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$66K
Apr 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$205K
Aug 31, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$360K
Aug 24, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$78K
Jul 6, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$137K
Apr 12, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$74K
Feb 17, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$154K
Jan 13, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$4K
Sep 12, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$2.3M
Aug 30, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00023237310IGF::OT::IGF PROJECT: PRA-GWMP 500(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOUTH EXIT AND VA ROUTE 233 BRIDGES OVER THE GEORGE WASHINGTON MEMORIAL PARKWAY, AND IMPROVEMENTS TO THE MOUNT VERNON TRAIL NEAR RONALD REAGAN WASHINGTON NATIONAL AIRPORT. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS FOR THE PIERS, SIDEWALK, AND UNDERSIDE OF THE SUPERSTRUCTURE; EPOXY INJECTION CRACK REPAIRS; BARRIER AND BRIDGE RAIL REPLACEMENT, REPAIRS, AND PAINTING; LATEX MODIFIED CONCRETE OVERLAY OF THE BRIDGE DECK; AND OTHER MISCELLANEOUS WORK. THE TRAIL AND ROADWAY WORK INCLUDES EARTHWORK, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY GUARDWALL CONSTRUCTION, UTILITY REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$183K
Jul 27, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00017237310IGF::OT::IGF PROJECT: FTNP-GWMP 1A109 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.6 MILES OF THE GWMP FROM THE INTERSTATE 395 INTERCHANGE TO THE NORTHERN ENTRANCE OF RONALD REAGAN NATIONAL AIRPORT, INCLUDING EXIT/ENTRANCE RAMPS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT RECONSTRUCTION, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$20K
Jun 20, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00029237310IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK.$33.2M
Feb 11, 2016Department of TransportationEASTERN FEDERAL LANDS HIGHWAY DIVISIONDTFH7115C00023237310IGF::OT::IGF PROJECT: PRA-GWMP 500(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOUTH EXIT AND VA ROUTE 233 BRIDGES OVER THE GEORGE WASHINGTON MEMORIAL PARKWAY, AND IMPROVEMENTS TO THE MOUNT VERNON TRAIL NEAR RONALD REAGAN WASHINGTON NATIONAL AIRPORT. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS FOR THE PIERS, SIDEWALK, AND UNDERSIDE OF THE SUPERSTRUCTURE; EPOXY INJECTION CRACK REPAIRS; BARRIER AND BRIDGE RAIL REPLACEMENT, REPAIRS, AND PAINTING; LATEX MODIFIED CONCRETE OVERLAY OF THE BRIDGE DECK; AND OTHER MISCELLANEOUS WORK. THE TRAIL AND ROADWAY WORK INCLUDES EARTHWORK, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY GUARDWALL CONSTRUCTION, UTILITY REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$53K
Jan 7, 2016General Services AdministrationWPHBB - AGGREGATED REPAIR&ALTERATIONS CONTRACTS BRANCHGS11P15MKC0014238210IGF::CL::IGF PEPCO DUCT BANK AWARD$65K
Nov 3, 2015General Services AdministrationWPHBB - AGGREGATED REPAIR&ALTERATIONS CONTRACTS BRANCHGS11P15MKC0014238210IGF::CL::IGF PEPCO DUCT BANK AWARD$27K

Get Alerted Before Fort Myer Construction CORP's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free