Federal Contractor Profile
Kovilic Construction CO INC
$117M obligated·77 awards·5 agencies·8 NAICS
Federal Contracts
Showing award actions 1–50 of 113 funded award actions, most recent first.
- Contracts with positive obligations
- 77
- Funded award actions shown
- 113
- Obligations shown
- $117M
- Awarding agencies
- 5
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 23, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 23, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00122N | 237310 | PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP | $142K |
| Sep 8, 2026 | Department of AgricultureUSDA-FS, CSA EAST 12 | 12445226C0013 | 237310 | COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT | $1.2M |
| Aug 28, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00122N | 237310 | PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP | $140K |
| Jul 20, 2026 | Department of DefenseW072 ENDIST HUNTINGTON | W9123725C0003 | 237990 | FRL MACHINERY PLATFORM CONCRETE REHABILITATION | $367K |
| Jun 30, 2026 | Department of the InteriorFWS, CONSTRUCTION A/E TEAM 2 | 140FC226C0001 | 237110 | CONSTRUCT NEW WATER CONTROL STRUCTURE (HARRISON LAKE NFH) | $295K |
| Mar 2, 2026 | Department of AgricultureUSDA-FS, CSA EAST 13 | 12445526C0010 | 237310 | HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT | $2.8M |
| Oct 24, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00002N | 237310 | PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO | $1.6M |
| Sep 22, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00122N | 237310 | PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP | $3.8M |
| Sep 16, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00015N | 237310 | PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE | $138K |
| Aug 26, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25PA097 | 237990 | SNAKE CREEK GATEWELL COVERS, GARRISON DAM | $215K |
| Jul 17, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000016 | 237310 | PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC | $1.3M |
| Jul 14, 2025 | Department of the InteriorFWS, CONSTRUCTION A/E TEAM 1 | 140FC124C0024 | 237310 | CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002 | $138K |
| Jun 18, 2025 | Department of DefenseW072 ENDIST HUNTINGTON | W9123725C0003 | 237990 | FRL MACHINERY PLATFORM CONCRETE REHABILITATION | $905K |
| Jan 7, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000016 | 237310 | PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC | $1.3M |
| Dec 6, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F25C0007 | 237310 | GARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRS | $727K |
| Sep 19, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0015 | 237990 | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | $298K |
| Aug 28, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324C000017 | 237310 | WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION, | $10M |
| Jun 27, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0015 | 237990 | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | $13K |
| Jun 18, 2024 | Department of the InteriorFWS, CONSTRUCTION A/E TEAM 1 | 140FC124C0024 | 237310 | CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002 | $394K |
| May 28, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0015 | 237990 | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | $327K |
| Mar 5, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0015 | 237990 | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | $58K |
| Jan 22, 2024 | Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI | 6982AF24C000006 | 237310 | ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS | $1.3M |
| Dec 26, 2023 | Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI | 6982AF24C000006 | 237310 | ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS | $3.6M |
| Dec 8, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00015N | 237310 | PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE | $1.2M |
| Aug 31, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000016 | 237310 | PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC | $11M |
| Aug 23, 2023 | Department of the InteriorFWS, CONSTRUCTION A/E TEAM 2 | 140F0222C0016 | 237990 | ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM | $166K |
| Aug 17, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00094N | 237310 | PROJECT DC ERFO NPS CHOH 2019-1(1) THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVEMENT RESURFACING; GRAVEL OVERLAY; BRIDGE SCOUR REPAIR; CULVERT REPLACEMENT AND REMOVAL; RIPRAP; MINOR REINFORCED CONCRETE PAVEMENT PATCHING; TEMPORARY DIVERSION BERM; FI | $575K |
| Nov 30, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00004N | 237310 | PROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK. | $954K |
| Nov 15, 2022 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2023C0015 | 237990 | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | $11M |
| Sep 25, 2022 | Department of DefenseW072 ENDIST HUNTINGTON | W9123722C0007 | 237310 | EAST LYNN BRIDGE BEARING REPLACEMENT | $358K |
| Sep 22, 2022 | Department of DefenseW072 ENDIST HUNTINGTON | W9123722C0006 | 237310 | JWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VA | $3.4M |
| Sep 20, 2022 | Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE | 140F0222C0016 | 237990 | ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM | $1.3M |
| Jun 14, 2022 | Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI | 6982AF22C000027 | 237310 | ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES | $1.3M |
| May 17, 2022 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056722C000015 | 237310 | MT FS ERFO 2018(1)-73(1), HELENA-LEWIS & CLARK 2018 REPAIRS, PHASE 1 INCLUDES EARTHWORK, SUBGRADE AND ROAD BASE CONSTRUCTION, SLOPE CONSTRUCTION, BITUMINOUS SURFACE TREATMENT, AND DRAINAGE INFRASTRUCTURE IN THE LEWIS AND CLARK NATIONAL FOREST | $597K |
| Apr 5, 2022 | Department of DefenseW072 ENDIST NASHVILLE | W912P521C0013 | 237990 | JPP GREENWAY MULTI-USE PAVED TRAIL | $8K |
| Apr 4, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F000047 | 237310 | PROJECT NP-NACE TRL(1): THE PROJECT CONSISTS OF THE INSTALLATION OF MILE MARKER AND PAVEMENT MARKING SIGNS ON THE ANACOSTIA RIVER TRAIL. | $157K |
| Mar 18, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000022 | 237310 | PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE | $531K |
| Mar 2, 2022 | Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI | 6982AF22C000016 | 237310 | SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE | $3.8M |
| Dec 21, 2021 | Department of DefenseW072 ENDIST CHICAGO | W912P620C0015 | 237110 | WATER MAIN IN TRENCH, DUCTILE IRON 12" | $13K |
| Dec 15, 2021 | Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE | 140F0221C0031 | 238910 | MO-NEOSHO NFH-DRAIN DITCH REHAB | $24K |
| Nov 19, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000015 | 237310 | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | $88K |
| Nov 8, 2021 | Department of DefenseW072 ENDIST CHICAGO | W912P620C0015 | 237110 | WATER MAIN IN TRENCH, DUCTILE IRON 12" | $390K |
| Sep 28, 2021 | Department of the InteriorFWS PACIFIC SOUTHWEST REGIONAL OFFI | 140F0821C0008 | 237310 | MULTI-BRIDGE REPAIR AT SENEY NWR | $3.4M |
| Sep 28, 2021 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $68K |
| Sep 20, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000015 | 237310 | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | $159K |
| Sep 17, 2021 | Department of DefenseW072 ENDIST NASHVILLE | W912P521C0013 | 237990 | JPP GREENWAY MULTI-USE PAVED TRAIL | $1.6M |
| Sep 14, 2021 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $41K |
| Sep 13, 2021 | Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE | 140F0221C0031 | 238910 | MO-NEOSHO NFH-DRAIN DITCH REHAB | $837K |
| Sep 9, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000106 | 237310 | PROJECT VA ST TFHRC 50(6): THE PROJECT CONSISTS OF THE CONSTRUCTION OF APPROXIMATELY 830 FEET NEW CONCRETE SIDEWALK (4-FOOT WIDE) WITH CONCRETE CURB (16-INCH DEPTH), HIGH-QUALITY DETECTABLE WARNING TILES OR PANELS THAT COMPLY WITH THE STANDARDS OF T | $245K |
| Aug 13, 2021 | Department of DefenseW072 ENDIST CHICAGO | W912P620C0015 | 237110 | WATER MAIN IN TRENCH, DUCTILE IRON 12" | $88K |