Skip to content

Federal Contractor Profile

Kovilic Construction CO INC

$117M obligated·77 awards·5 agencies·8 NAICS

Federal Contracts

Showing award actions 1–50 of 113 funded award actions, most recent first.

Contracts with positive obligations
77
Funded award actions shown
113
Obligations shown
$117M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 23, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 23, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00122N237310PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP$142K
Sep 8, 2026Department of AgricultureUSDA-FS, CSA EAST 1212445226C0013237310COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT$1.2M
Aug 28, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00122N237310PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP$140K
Jul 20, 2026Department of DefenseW072 ENDIST HUNTINGTONW9123725C0003237990FRL MACHINERY PLATFORM CONCRETE REHABILITATION$367K
Jun 30, 2026Department of the InteriorFWS, CONSTRUCTION A/E TEAM 2140FC226C0001237110CONSTRUCT NEW WATER CONTROL STRUCTURE (HARRISON LAKE NFH)$295K
Mar 2, 2026Department of AgricultureUSDA-FS, CSA EAST 1312445526C0010237310HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT$2.8M
Oct 24, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00002N237310PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO$1.6M
Sep 22, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00122N237310PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP$3.8M
Sep 16, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00015N237310PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE$138K
Aug 26, 2025Department of DefenseW071 ENDIST OMAHAW9128F25PA097237990SNAKE CREEK GATEWELL COVERS, GARRISON DAM$215K
Jul 17, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000016237310PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC$1.3M
Jul 14, 2025Department of the InteriorFWS, CONSTRUCTION A/E TEAM 1140FC124C0024237310CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002$138K
Jun 18, 2025Department of DefenseW072 ENDIST HUNTINGTONW9123725C0003237990FRL MACHINERY PLATFORM CONCRETE REHABILITATION$905K
Jan 7, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000016237310PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC$1.3M
Dec 6, 2024Department of DefenseW071 ENDIST OMAHAW9128F25C0007237310GARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRS$727K
Sep 19, 2024Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2023C0015237990GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL$298K
Aug 28, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324C000017237310WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,$10M
Jun 27, 2024Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2023C0015237990GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL$13K
Jun 18, 2024Department of the InteriorFWS, CONSTRUCTION A/E TEAM 1140FC124C0024237310CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002$394K
May 28, 2024Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2023C0015237990GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL$327K
Mar 5, 2024Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2023C0015237990GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL$58K
Jan 22, 2024Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI6982AF24C000006237310ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS$1.3M
Dec 26, 2023Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI6982AF24C000006237310ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS$3.6M
Dec 8, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00015N237310PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE$1.2M
Aug 31, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000016237310PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC$11M
Aug 23, 2023Department of the InteriorFWS, CONSTRUCTION A/E TEAM 2140F0222C0016237990ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM$166K
Aug 17, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00094N237310PROJECT DC ERFO NPS CHOH 2019-1(1) THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVEMENT RESURFACING; GRAVEL OVERLAY; BRIDGE SCOUR REPAIR; CULVERT REPLACEMENT AND REMOVAL; RIPRAP; MINOR REINFORCED CONCRETE PAVEMENT PATCHING; TEMPORARY DIVERSION BERM; FI$575K
Nov 30, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00004N237310PROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.$954K
Nov 15, 2022Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2023C0015237990GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL$11M
Sep 25, 2022Department of DefenseW072 ENDIST HUNTINGTONW9123722C0007237310EAST LYNN BRIDGE BEARING REPLACEMENT$358K
Sep 22, 2022Department of DefenseW072 ENDIST HUNTINGTONW9123722C0006237310JWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VA$3.4M
Sep 20, 2022Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE140F0222C0016237990ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM$1.3M
Jun 14, 2022Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI6982AF22C000027237310ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES$1.3M
May 17, 2022Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056722C000015237310MT FS ERFO 2018(1)-73(1), HELENA-LEWIS & CLARK 2018 REPAIRS, PHASE 1 INCLUDES EARTHWORK, SUBGRADE AND ROAD BASE CONSTRUCTION, SLOPE CONSTRUCTION, BITUMINOUS SURFACE TREATMENT, AND DRAINAGE INFRASTRUCTURE IN THE LEWIS AND CLARK NATIONAL FOREST$597K
Apr 5, 2022Department of DefenseW072 ENDIST NASHVILLEW912P521C0013237990JPP GREENWAY MULTI-USE PAVED TRAIL$8K
Apr 4, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F000047237310PROJECT NP-NACE TRL(1): THE PROJECT CONSISTS OF THE INSTALLATION OF MILE MARKER AND PAVEMENT MARKING SIGNS ON THE ANACOSTIA RIVER TRAIL.$157K
Mar 18, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000022237310PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE$531K
Mar 2, 2022Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI6982AF22C000016237310SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE$3.8M
Dec 21, 2021Department of DefenseW072 ENDIST CHICAGOW912P620C0015237110WATER MAIN IN TRENCH, DUCTILE IRON 12"$13K
Dec 15, 2021Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE140F0221C0031238910MO-NEOSHO NFH-DRAIN DITCH REHAB$24K
Nov 19, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000015237310MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.$88K
Nov 8, 2021Department of DefenseW072 ENDIST CHICAGOW912P620C0015237110WATER MAIN IN TRENCH, DUCTILE IRON 12"$390K
Sep 28, 2021Department of the InteriorFWS PACIFIC SOUTHWEST REGIONAL OFFI140F0821C0008237310MULTI-BRIDGE REPAIR AT SENEY NWR$3.4M
Sep 28, 2021Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$68K
Sep 20, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000015237310MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.$159K
Sep 17, 2021Department of DefenseW072 ENDIST NASHVILLEW912P521C0013237990JPP GREENWAY MULTI-USE PAVED TRAIL$1.6M
Sep 14, 2021Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$41K
Sep 13, 2021Department of the InteriorFWS SOUTHWEST REGIONAL OFFICE140F0221C0031238910MO-NEOSHO NFH-DRAIN DITCH REHAB$837K
Sep 9, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000106237310PROJECT VA ST TFHRC 50(6): THE PROJECT CONSISTS OF THE CONSTRUCTION OF APPROXIMATELY 830 FEET NEW CONCRETE SIDEWALK (4-FOOT WIDE) WITH CONCRETE CURB (16-INCH DEPTH), HIGH-QUALITY DETECTABLE WARNING TILES OR PANELS THAT COMPLY WITH THE STANDARDS OF T$245K
Aug 13, 2021Department of DefenseW072 ENDIST CHICAGOW912P620C0015237110WATER MAIN IN TRENCH, DUCTILE IRON 12"$88K

Get Alerted Before Kovilic Construction CO INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free