Showing award actions 51–100 of 113 funded award actions, most recent first.

Contracts with positive obligations
77
Funded award actions shown
113
Obligations shown
$117M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 23, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 9, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000022237310PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE$4.1M
Aug 5, 2021Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$20K
Jul 29, 2021Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$179K
Jun 25, 2021Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$56K
Jun 25, 2021Department of DefenseW072 ENDIST CHICAGOW912P621P0004237110INDIANA HARBOR CDF WATER LINE REPAIR$12K
Jun 11, 2021Department of DefenseW07V ENDIST ST PAULW912ES21C0013237990MARSHALL FLOOD CONTROL REHABILITATION.$354K
May 10, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000060237310PROJECT VA ERFO COE 2018-1(1) THE PROJECT CONSISTS OF PARKING LOT REPAIRS. THE WORK INCLUDES RIPRAP INSTALLATION, EMBANKMENT CONSTRUCTION, AGGREGATE BASE, SEPARATION-STABILIZATION GEOTEXTILE, ASPHALT CONCRETE PAVEMENT, WHEELSTOP RESETTING, PAVEMENT$242K
Apr 26, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000006237310FW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, A$240K
Mar 11, 2021Department of DefenseW072 ENDIST NASHVILLEW912P521C0002237990LOYALL CONSTRUCTION//LOYALL PHASE 1$1.4M
Feb 9, 2021Department of the InteriorSER WEST(52000)140P5220C0009237990G:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSION$76K
Jan 20, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000006237310FW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, A$580K
Jan 13, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000015237310MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.$136K
Dec 28, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000011237310PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$239K
Dec 8, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320F000073237310THIS REQUEST FOR PROPOSAL IS FOR PROJECT NO. VA ERFO BLRI 2020-1(1).$5K
Sep 30, 2020Department of DefenseW072 ENDIST BUFFALOW912P420C0017237990BASE FY20 VERMILLION EAST PIER REPAIR$1.8M
Sep 30, 2020Department of DefenseW072 ENDIST CHICAGOW912P620C0015237110WATER MAIN IN TRENCH, DUCTILE IRON 12"$1.5M
Sep 17, 2020Department of the InteriorFWS MIDWEST REGIONAL OFFICE140F0320P0167237990WI-GENOA NFH-POND 2 EMBANKMENT STABILIZATION$149K
Sep 14, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000011237310PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$149K
Sep 11, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320F000073237310THIS REQUEST FOR PROPOSAL IS FOR PROJECT NO. VA ERFO BLRI 2020-1(1).$140K
Sep 10, 2020Department of DefenseW071 ENDIST KANSAS CITYW912DQ20C1106237990SPILLWAY SPALL REPAIR$243K
Sep 9, 2020Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI6982AF20P000059237310NE FTFW FTNI TRAIL(1) FORT FALLS TRAIL$240K
May 1, 2020Department of the InteriorSER WEST(52000)140P5220C0009237990G:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSION$2.2M
Apr 14, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000015237310MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.$189K
Apr 1, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00027237310IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.$189K
Sep 30, 2019Department of DefenseW072 ENDIST CHICAGOW912P619C0021237110BASE AWARD CAR FOR VILLAGE OF HAZEL CREST WATER MAIN IMPROVEMENTS$1.0M
Sep 7, 2019Department of DefenseW072 ENDIST CHICAGOW912P619C0011237110VILLAGE OF GLEVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENT SECTION 219$1.2M
Sep 6, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000043237310PROJECT: FELSENTHAL WILDLIFE NATIONAL REFUGE PROJECT FW FELS-11(1) THE PROJECT CONSISTS OF THE RESURFACING PINE ISLAND ROAD AND SANDY PRAIRIE ROAD WITHIN THE FELSENTHAL NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES RESURFACING WITH AGGREGATE SURFAC$1.7M
Jun 3, 2019Department of Homeland SecurityCEU PROVIDENCE(000G1)70Z0G118CPRV199002379907233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER$87K
May 22, 2019Department of Homeland SecurityCEU PROVIDENCE(000G1)70Z0G118CPRV199002379907233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER$31K
May 3, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000015237310MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK.$1.7M
Mar 28, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000011237310PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$5.7M
Sep 7, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000054237310PRINCE WILLIAM FOREST PARK PROJECT 11(3), 406(1) - THE PROJECT CONSISTS OF THE REHABILITATION OF THE SOUTH FORK TIMBER BRIDGE AND PYRITE MINE BRIDGE. THE SOUTH FORK TIMBER BRIDGE WORK INCLUDES REPAIR OF CONCRETE ABUTMENT WALLS AND WINGWALLS, REPLACEMENT OF TIMBER DECK AND CURBS, REPLACEMENT OF ASPHALT WEARING SURFACE, AND OTHER MISCELLANEOUS WORK. THE PYRITE MINE BRIDGE WORK INCLUDES REPAIR OF STONE MASONRY ABUTMENT WALLS, REPLACEMENT OF TIMBER DECK AND CURBS, SHOP REPAIR OF STEEL MEMBERS, AND MISCELLANEOUS WORK. THE ROAD WORK ON SCENIC DRIVE INCLUDES ASPHALT PAVEMENT RESURFACING ON THE BRIDGE APPROACHES, AND OTHER MISCELLANEOUS WORK.$579K
Sep 6, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00027237310IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.$9K
Aug 30, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000052237310THE PROJECT CONSISTS OF THE RELOCATION OF A SECTION OF LOST VALLEY ROAD, EXISTING PARKING AREA AND THE TRAILHEAD OUTSIDE THE CLARK CREEK FLOODPLAIN, AND THE RESTORATION OF A SECTION OF THE EXISTING LOST VALLEY TRAIL WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES ROADWAY OBLITERATION, ROADWAY AND TRAIL RECONDITIONING, AGGREGATE SURFACE COURSE, CULVERT INSTALLATION, SIGNING, AND OTHER MISCELLANEOUS WORK.$1.1M
Aug 22, 2018Department of Homeland SecurityCEU PROVIDENCE(000G1)70Z0G118CPRV199002379907233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER$1.7M
Jul 17, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7318C000045237310PROJECT: NP BUFF 0107(1) THE PROJECT CONSISTS OF REPAIRS TO THE PONCA LOW WATER BRIDGE WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES THE RESURFACING OF THE CONCRETE BRIDGE DECK AND APPROACHES BY MICRO MILLING AND OVERLAY WITH POLYESTER POLYMER CONCRETE, REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, INSTALLING STEEL ANGLE EXTENSIONS, CLEANING AND RESEALING BRIDGE JOINTS, RECONSTRUCTION OF EXISTING CONCRETE SLABS WITH ARTICULATED CONCRETE BLOCK REVETMENT MATTRESSES, AND OTHER MISCELLANEOUS WORK.$379K
Mar 21, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00027237310IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.$118K
Jan 12, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00027237310IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.$78K
Oct 20, 2017Department of DefenseW072 ENDIST CHICAGOW912P616C0016237990IGF::OT::IGF CHICAGO HARBOR LOCK UTILITY RELOCATION$17K
Sep 29, 2017Department of DefenseW072 ENDIST NASHVILLEW912P517C0008237110IGF::OT::IGF MELTON HILL LOCK RAW WATER SYSTEM REHAB$987K
Sep 22, 2017Department of the InteriorFWS NORTHEAST REGIONAL OFFICEINF17PC00174237990IGF::OT::IGF BICYCLE TRAIL IMPROVEMENTS AT E. SHORE OF VA NWR$1.1M
Sep 7, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00029237310IGF::OT::IGF PROJECT: WV ERFO FS 2016-1(8) THE PROJECT CONSISTS OF RECONSTRUCTION OF WILLIAMS RIVER ROAD (FOREST SERVICE ROUTE 86) AT MILEPOST 16.0 WITHIN THE MONONGAHELA NATIONAL FOREST. THE WORK INCLUDES ROADWAY EXCAVATION, CONSTRUCTION OF MECHANICALLY STABILIZED EARTH RETAINING WALLS WITH GEOGRID REINFORCEMENT AND WELDED WIRE FACE, ROADWAY RESURFACING WITH AGGREGATE BASE, RIPRAP PLACEMENT, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$375K
Aug 24, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00006237310IGF::OT::IGF PROJECT: NP-VAMA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THREE BRIDGES WITHIN THE VANDERBILT MANSION NATIONAL HISTORIC SITE. THE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING AND REPOINTING STONE MASONRY, AND OTHER MISCELLANEOUS WORK.$25K
Aug 17, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00027237310IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK.$818K
Aug 17, 2017Department of DefenseW07V ENDIST ST PAULW912ES17C0006238990IGF::OT::IGF PUMPING OF LOW DENSITY CONCRETE TO STABILIZE THE GUIDEWALLS AT LOCK AND DAMS 5&6.$6.0M
Jul 26, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00025237310IGF::OT::IGF PROJECT: IL ERFO COE 2016-1(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF STORM DAMAGED ROADWAYS AND PARKING AREAS WITHIN THE KASKASKIA RIVER, LAKE SHELBYVILLE, AND CARLYLE LAKE UNITS OF THE USACE ST. LOUIS DISTRICT. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, SEPARATION-STABILIZATION GEOTEXTILE, AGGREGATE RESURFACING, ASPHALT CONCRETE PAVEMENT REMOVAL AND REPLACEMENT, ASPHALT CRACK CLEANING AND SEALING, CONCRETE CURB AND SIDEWALK REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$622K
Apr 27, 2017Department of DefenseW07V ENDIST VICKSBURGW912EE16C0024237990IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL$2K
Apr 19, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00012237310IGF::OT::IGF PROJECT: NP-MACA 001T(1) - MAMMOTH CAVE NP - VISITOR CENTER BRIDGE THE PROJECT CONSISTS OF THE REPLACEMENT OF THE MAMMOTH CAVE VISITOR CENTER PEDESTRIAN BRIDGE BETWEEN THE VISITOR CENTER AND THE MAMMOTH CAVE HOTEL. THE WORK INCLUDES REPLACING THE 176-FOOT, THREE-SPAN, CONCRETE BOX GIRDER BRIDGE WITH A 176-FOOT, THREE-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON CAST-IN-PLACE CONCRETE FOOTINGS AND PRECAST CONCRETE ABUTMENTS WITH A CAST-IN-PLACE CONCRETE DECK. THE WORK ALSO INCLUDES MILLING AND OVERLAY OF ASPHALT PAVEMENT TRIAL/SIDEWALK, REPLACEMENT OF EXPOSED AGGREGATE CONCRETE TRIAL/SIDEWALK, AND OTHER MISCELLANEOUS WORK.$878K
Mar 23, 2017Department of DefenseW07V ENDIST VICKSBURGW912EE16C0024237990IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL$12K
Mar 10, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00006237310IGF::OT::IGF PROJECT: NP-VAMA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THREE BRIDGES WITHIN THE VANDERBILT MANSION NATIONAL HISTORIC SITE. THE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING AND REPOINTING STONE MASONRY, AND OTHER MISCELLANEOUS WORK.$335K