Federal Contractor Profile
Kovilic Construction CO INC
$117M obligated·77 awards·5 agencies·8 NAICS
Federal Contracts
Showing award actions 51–100 of 113 funded award actions, most recent first.
- Contracts with positive obligations
- 77
- Funded award actions shown
- 113
- Obligations shown
- $117M
- Awarding agencies
- 5
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 23, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 9, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000022 | 237310 | PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE | $4.1M |
| Aug 5, 2021 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $20K |
| Jul 29, 2021 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $179K |
| Jun 25, 2021 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $56K |
| Jun 25, 2021 | Department of DefenseW072 ENDIST CHICAGO | W912P621P0004 | 237110 | INDIANA HARBOR CDF WATER LINE REPAIR | $12K |
| Jun 11, 2021 | Department of DefenseW07V ENDIST ST PAUL | W912ES21C0013 | 237990 | MARSHALL FLOOD CONTROL REHABILITATION. | $354K |
| May 10, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000060 | 237310 | PROJECT VA ERFO COE 2018-1(1) THE PROJECT CONSISTS OF PARKING LOT REPAIRS. THE WORK INCLUDES RIPRAP INSTALLATION, EMBANKMENT CONSTRUCTION, AGGREGATE BASE, SEPARATION-STABILIZATION GEOTEXTILE, ASPHALT CONCRETE PAVEMENT, WHEELSTOP RESETTING, PAVEMENT | $242K |
| Apr 26, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000006 | 237310 | FW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, A | $240K |
| Mar 11, 2021 | Department of DefenseW072 ENDIST NASHVILLE | W912P521C0002 | 237990 | LOYALL CONSTRUCTION//LOYALL PHASE 1 | $1.4M |
| Feb 9, 2021 | Department of the InteriorSER WEST(52000) | 140P5220C0009 | 237990 | G:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSION | $76K |
| Jan 20, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000006 | 237310 | FW-CAVA 102(1), 905(1). THE PROJECT CONSISTS OF THE RECONSTRUCTION OF COUNTY ROUTE 32/18 CAMP 70 ROAD, PARKING LOT, RIVERS EDGE TRIAL. THE WORK INCLUDES AGGREGATE SURFACE COURSE, AGGREGATE BASE, CELLULAR CONFINEMENT SYSTEM, DRAINAGE IMPROVEMENTS, A | $580K |
| Jan 13, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000015 | 237310 | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | $136K |
| Dec 28, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000011 | 237310 | PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $239K |
| Dec 8, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320F000073 | 237310 | THIS REQUEST FOR PROPOSAL IS FOR PROJECT NO. VA ERFO BLRI 2020-1(1). | $5K |
| Sep 30, 2020 | Department of DefenseW072 ENDIST BUFFALO | W912P420C0017 | 237990 | BASE FY20 VERMILLION EAST PIER REPAIR | $1.8M |
| Sep 30, 2020 | Department of DefenseW072 ENDIST CHICAGO | W912P620C0015 | 237110 | WATER MAIN IN TRENCH, DUCTILE IRON 12" | $1.5M |
| Sep 17, 2020 | Department of the InteriorFWS MIDWEST REGIONAL OFFICE | 140F0320P0167 | 237990 | WI-GENOA NFH-POND 2 EMBANKMENT STABILIZATION | $149K |
| Sep 14, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000011 | 237310 | PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $149K |
| Sep 11, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320F000073 | 237310 | THIS REQUEST FOR PROPOSAL IS FOR PROJECT NO. VA ERFO BLRI 2020-1(1). | $140K |
| Sep 10, 2020 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ20C1106 | 237990 | SPILLWAY SPALL REPAIR | $243K |
| Sep 9, 2020 | Department of Transportation6982AF CENTRAL FEDERAL LANDS DIVISI | 6982AF20P000059 | 237310 | NE FTFW FTNI TRAIL(1) FORT FALLS TRAIL | $240K |
| May 1, 2020 | Department of the InteriorSER WEST(52000) | 140P5220C0009 | 237990 | G:EPREF CONSTRUCTION, CONSTRUCT CANOE LAUNCH&TRAIL EXTENSION | $2.2M |
| Apr 14, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000015 | 237310 | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | $189K |
| Apr 1, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00027 | 237310 | IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK. | $189K |
| Sep 30, 2019 | Department of DefenseW072 ENDIST CHICAGO | W912P619C0021 | 237110 | BASE AWARD CAR FOR VILLAGE OF HAZEL CREST WATER MAIN IMPROVEMENTS | $1.0M |
| Sep 7, 2019 | Department of DefenseW072 ENDIST CHICAGO | W912P619C0011 | 237110 | VILLAGE OF GLEVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENT SECTION 219 | $1.2M |
| Sep 6, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000043 | 237310 | PROJECT: FELSENTHAL WILDLIFE NATIONAL REFUGE PROJECT FW FELS-11(1) THE PROJECT CONSISTS OF THE RESURFACING PINE ISLAND ROAD AND SANDY PRAIRIE ROAD WITHIN THE FELSENTHAL NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES RESURFACING WITH AGGREGATE SURFAC | $1.7M |
| Jun 3, 2019 | Department of Homeland SecurityCEU PROVIDENCE(000G1) | 70Z0G118CPRV19900 | 237990 | 7233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER | $87K |
| May 22, 2019 | Department of Homeland SecurityCEU PROVIDENCE(000G1) | 70Z0G118CPRV19900 | 237990 | 7233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER | $31K |
| May 3, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000015 | 237310 | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | $1.7M |
| Mar 28, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000011 | 237310 | PROJECT WI ERFO FS 2016-1(5) THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS, BRIDGES AND PEDESTRIAN TRAILS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT PAVING, DITCH RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $5.7M |
| Sep 7, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000054 | 237310 | PRINCE WILLIAM FOREST PARK PROJECT 11(3), 406(1) - THE PROJECT CONSISTS OF THE REHABILITATION OF THE SOUTH FORK TIMBER BRIDGE AND PYRITE MINE BRIDGE. THE SOUTH FORK TIMBER BRIDGE WORK INCLUDES REPAIR OF CONCRETE ABUTMENT WALLS AND WINGWALLS, REPLACEMENT OF TIMBER DECK AND CURBS, REPLACEMENT OF ASPHALT WEARING SURFACE, AND OTHER MISCELLANEOUS WORK. THE PYRITE MINE BRIDGE WORK INCLUDES REPAIR OF STONE MASONRY ABUTMENT WALLS, REPLACEMENT OF TIMBER DECK AND CURBS, SHOP REPAIR OF STEEL MEMBERS, AND MISCELLANEOUS WORK. THE ROAD WORK ON SCENIC DRIVE INCLUDES ASPHALT PAVEMENT RESURFACING ON THE BRIDGE APPROACHES, AND OTHER MISCELLANEOUS WORK. | $579K |
| Sep 6, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00027 | 237310 | IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK. | $9K |
| Aug 30, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000052 | 237310 | THE PROJECT CONSISTS OF THE RELOCATION OF A SECTION OF LOST VALLEY ROAD, EXISTING PARKING AREA AND THE TRAILHEAD OUTSIDE THE CLARK CREEK FLOODPLAIN, AND THE RESTORATION OF A SECTION OF THE EXISTING LOST VALLEY TRAIL WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES ROADWAY OBLITERATION, ROADWAY AND TRAIL RECONDITIONING, AGGREGATE SURFACE COURSE, CULVERT INSTALLATION, SIGNING, AND OTHER MISCELLANEOUS WORK. | $1.1M |
| Aug 22, 2018 | Department of Homeland SecurityCEU PROVIDENCE(000G1) | 70Z0G118CPRV19900 | 237990 | 7233416 (PFA$1,761,283.00)WATERFRONT REPAIRS AT STATION GLOUCESTER | $1.7M |
| Jul 17, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000045 | 237310 | PROJECT: NP BUFF 0107(1) THE PROJECT CONSISTS OF REPAIRS TO THE PONCA LOW WATER BRIDGE WITHIN THE BUFFALO NATIONAL RIVER. THE WORK INCLUDES THE RESURFACING OF THE CONCRETE BRIDGE DECK AND APPROACHES BY MICRO MILLING AND OVERLAY WITH POLYESTER POLYMER CONCRETE, REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, INSTALLING STEEL ANGLE EXTENSIONS, CLEANING AND RESEALING BRIDGE JOINTS, RECONSTRUCTION OF EXISTING CONCRETE SLABS WITH ARTICULATED CONCRETE BLOCK REVETMENT MATTRESSES, AND OTHER MISCELLANEOUS WORK. | $379K |
| Mar 21, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00027 | 237310 | IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK. | $118K |
| Jan 12, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00027 | 237310 | IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK. | $78K |
| Oct 20, 2017 | Department of DefenseW072 ENDIST CHICAGO | W912P616C0016 | 237990 | IGF::OT::IGF CHICAGO HARBOR LOCK UTILITY RELOCATION | $17K |
| Sep 29, 2017 | Department of DefenseW072 ENDIST NASHVILLE | W912P517C0008 | 237110 | IGF::OT::IGF MELTON HILL LOCK RAW WATER SYSTEM REHAB | $987K |
| Sep 22, 2017 | Department of the InteriorFWS NORTHEAST REGIONAL OFFICE | INF17PC00174 | 237990 | IGF::OT::IGF BICYCLE TRAIL IMPROVEMENTS AT E. SHORE OF VA NWR | $1.1M |
| Sep 7, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00029 | 237310 | IGF::OT::IGF PROJECT: WV ERFO FS 2016-1(8) THE PROJECT CONSISTS OF RECONSTRUCTION OF WILLIAMS RIVER ROAD (FOREST SERVICE ROUTE 86) AT MILEPOST 16.0 WITHIN THE MONONGAHELA NATIONAL FOREST. THE WORK INCLUDES ROADWAY EXCAVATION, CONSTRUCTION OF MECHANICALLY STABILIZED EARTH RETAINING WALLS WITH GEOGRID REINFORCEMENT AND WELDED WIRE FACE, ROADWAY RESURFACING WITH AGGREGATE BASE, RIPRAP PLACEMENT, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $375K |
| Aug 24, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00006 | 237310 | IGF::OT::IGF PROJECT: NP-VAMA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THREE BRIDGES WITHIN THE VANDERBILT MANSION NATIONAL HISTORIC SITE. THE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING AND REPOINTING STONE MASONRY, AND OTHER MISCELLANEOUS WORK. | $25K |
| Aug 17, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00027 | 237310 | IGF::OT::IGF PROJECT: MANA 001S(1) THE PROJECT CONSISTS OF THE REPAIR OF THE HISTORIC STONE BRIDGE WITHIN THE MANASSAS NATIONAL BATTLEFIELD PARK. THE BRIDGE SUBSTRUCTURE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS WITH SHOTCRETE, REPLACING AND REPOINTING STONE MASONRY, GROUTING VOIDS UNDER THE PIER AND ABUTMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. THE BRIDGE DECK WORK INCLUDES REMOVAL OF THE ASPHALT PAVEMENT, INSTALLATION OF A WATERPROOFING MEMBRANE, ASPHALT CONCRETE PAVEMENT OVERLAY, CHIP SEAL, AND OTHER MISCELLANEOUS WORK. | $818K |
| Aug 17, 2017 | Department of DefenseW07V ENDIST ST PAUL | W912ES17C0006 | 238990 | IGF::OT::IGF PUMPING OF LOW DENSITY CONCRETE TO STABILIZE THE GUIDEWALLS AT LOCK AND DAMS 5&6. | $6.0M |
| Jul 26, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00025 | 237310 | IGF::OT::IGF PROJECT: IL ERFO COE 2016-1(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF STORM DAMAGED ROADWAYS AND PARKING AREAS WITHIN THE KASKASKIA RIVER, LAKE SHELBYVILLE, AND CARLYLE LAKE UNITS OF THE USACE ST. LOUIS DISTRICT. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, SEPARATION-STABILIZATION GEOTEXTILE, AGGREGATE RESURFACING, ASPHALT CONCRETE PAVEMENT REMOVAL AND REPLACEMENT, ASPHALT CRACK CLEANING AND SEALING, CONCRETE CURB AND SIDEWALK REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | $622K |
| Apr 27, 2017 | Department of DefenseW07V ENDIST VICKSBURG | W912EE16C0024 | 237990 | IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL | $2K |
| Apr 19, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00012 | 237310 | IGF::OT::IGF PROJECT: NP-MACA 001T(1) - MAMMOTH CAVE NP - VISITOR CENTER BRIDGE THE PROJECT CONSISTS OF THE REPLACEMENT OF THE MAMMOTH CAVE VISITOR CENTER PEDESTRIAN BRIDGE BETWEEN THE VISITOR CENTER AND THE MAMMOTH CAVE HOTEL. THE WORK INCLUDES REPLACING THE 176-FOOT, THREE-SPAN, CONCRETE BOX GIRDER BRIDGE WITH A 176-FOOT, THREE-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON CAST-IN-PLACE CONCRETE FOOTINGS AND PRECAST CONCRETE ABUTMENTS WITH A CAST-IN-PLACE CONCRETE DECK. THE WORK ALSO INCLUDES MILLING AND OVERLAY OF ASPHALT PAVEMENT TRIAL/SIDEWALK, REPLACEMENT OF EXPOSED AGGREGATE CONCRETE TRIAL/SIDEWALK, AND OTHER MISCELLANEOUS WORK. | $878K |
| Mar 23, 2017 | Department of DefenseW07V ENDIST VICKSBURG | W912EE16C0024 | 237990 | IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL | $12K |
| Mar 10, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00006 | 237310 | IGF::OT::IGF PROJECT: NP-VAMA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THREE BRIDGES WITHIN THE VANDERBILT MANSION NATIONAL HISTORIC SITE. THE WORK INCLUDES REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING AND REPOINTING STONE MASONRY, AND OTHER MISCELLANEOUS WORK. | $335K |
Get Alerted Before Kovilic Construction CO INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free