Showing award actions 101–113 of 113 funded award actions, most recent first.

Contracts with positive obligations
77
Funded award actions shown
113
Obligations shown
$117M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 23, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Feb 23, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00025237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING NATCHEZ TRACE PARKWAY BRIDGE OVER LITTLE SWAN CREEK AT MILEPOST (MP) 386.89, AND THE REHABILITATION OF THE BIG SWAN CREEK BRIDGE AT MP 391.50. THE LITTLE SWAN CREEK BRIDGE WORK INCLUDES REPLACING THE EXISTING 200-FOOT, THREE-SPAN, CONCRETE GIRDER BRIDGE WITH A 241-FOOT, TWO-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON PRECAST CONCRETE PIERS AND ABUTMENTS, WITH PRECAST CONCRETE DECK PANELS, AND OTHER MISCELLANEOUS WORK. THE BIG SWAN CREEK BRIDGE WORK INCLUDES CONCRETE REPAIRS FOR THE DECK (SURFACE AND UNDERSIDE), SUBSTRUCTURE (PIER CAP), AND RAILING (INCLUDING CURBS); EXPANSION JOINT REPAIRS AND SEALING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY; AND OTHER MISCELLANEOUS WORK.$933K
Feb 2, 2017Department of DefenseW072 ENDIST LOUISVILLEW912QR16P0111238110IGF::OT::IGF SPILLWAY REPAIR AT BROOKVILLE LAKE$15K
Sep 29, 2016Department of DefenseW072 ENDIST LOUISVILLEW912QR16P0111238110IGF::OT::IGF SPILLWAY REPAIR AT BROOKVILLE LAKE$145K
Sep 29, 2016Department of DefenseW072 ENDIST CHICAGOW912P616C0016237990IGF::OT::IGF CHICAGO HARBOR LOCK UTILITY RELOCATION$460K
Sep 21, 2016Department of DefenseW072 ENDIST PITTSBURGHW911WN16C8007237990IGF::OT::IGF TYGART BULKHEAD HOIST REPAIRS$984K
Sep 16, 2016Department of DefenseW07V ENDIST VICKSBURGW912EE16C0024237990IGF::OT::IGF GRENADA ADA FISHING PIER OUTLET CHANNEL$1.2M
Sep 15, 2016Department of DefenseW072 ENDIST CHICAGOW912P615C0016237110IGF::OT::IGF RICHTON PARK WATER MAIN REPLACEMENT$17K
Aug 23, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00025237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING NATCHEZ TRACE PARKWAY BRIDGE OVER LITTLE SWAN CREEK AT MILEPOST (MP) 386.89, AND THE REHABILITATION OF THE BIG SWAN CREEK BRIDGE AT MP 391.50. THE LITTLE SWAN CREEK BRIDGE WORK INCLUDES REPLACING THE EXISTING 200-FOOT, THREE-SPAN, CONCRETE GIRDER BRIDGE WITH A 241-FOOT, TWO-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON PRECAST CONCRETE PIERS AND ABUTMENTS, WITH PRECAST CONCRETE DECK PANELS, AND OTHER MISCELLANEOUS WORK. THE BIG SWAN CREEK BRIDGE WORK INCLUDES CONCRETE REPAIRS FOR THE DECK (SURFACE AND UNDERSIDE), SUBSTRUCTURE (PIER CAP), AND RAILING (INCLUDING CURBS); EXPANSION JOINT REPAIRS AND SEALING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY; AND OTHER MISCELLANEOUS WORK.$200K
Aug 3, 2016Department of DefenseW071 ENDIST OMAHAW9128F16C0041237310IGF::OT::IGF - THE PURPOSE FOR THIS CONTRACT IS TO OBTAIN CEMENT COVERS$459K
Jul 18, 2016Department of the InteriorFWS HEADQUARTERSINF16PC00100238140IGF::OT::IGF MASONRY REPAIRS FOR 2016 AT THE NATIONAL CONSERVATION TRAINING CENTER, SHEPHERDSTOWN, WV.$483K
Jun 30, 2016Department of DefenseW072 ENDIST CHICAGOW912P615C0016237110IGF::OT::IGF RICHTON PARK WATER MAIN REPLACEMENT$274K
Jun 21, 2016Department of DefenseW072 ENDIST CHICAGOW912P615C0016237110IGF::OT::IGF RICHTON PARK WATER MAIN REPLACEMENT$6K
Jun 7, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00025237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING NATCHEZ TRACE PARKWAY BRIDGE OVER LITTLE SWAN CREEK AT MILEPOST (MP) 386.89, AND THE REHABILITATION OF THE BIG SWAN CREEK BRIDGE AT MP 391.50. THE LITTLE SWAN CREEK BRIDGE WORK INCLUDES REPLACING THE EXISTING 200-FOOT, THREE-SPAN, CONCRETE GIRDER BRIDGE WITH A 241-FOOT, TWO-SPAN, PRECAST, PRESTRESSED CONCRETE GIRDER BRIDGE ON PRECAST CONCRETE PIERS AND ABUTMENTS, WITH PRECAST CONCRETE DECK PANELS, AND OTHER MISCELLANEOUS WORK. THE BIG SWAN CREEK BRIDGE WORK INCLUDES CONCRETE REPAIRS FOR THE DECK (SURFACE AND UNDERSIDE), SUBSTRUCTURE (PIER CAP), AND RAILING (INCLUDING CURBS); EXPANSION JOINT REPAIRS AND SEALING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY; AND OTHER MISCELLANEOUS WORK.$640K