Home/Contractors/Northrop Grumman Corporation

Federal Contractor Profile

Northrop Grumman Corporation

Federal contracting record: $158B obligated across 36,226 awards from 23 agencies, FY 2016–2026.

$158B
Total Obligated
36,226
Award Records
23
Agencies Served
229
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

NKVZLJL93QT6

CAGE Code

6MKG6

Registered Entities (UEIs)

168 under this organization

Address

1865 INDUSTRIAL BLVD, HARVEY, LA, 700582313

First Federal Award

Oct 1, 2015

Most Recent Award

Sep 18, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 336411

    AIRCRAFT MANUFACTURING

    646 awards

    $28B
  • 336414

    GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING

    222 awards

    $22B
  • 541330

    ENGINEERING SERVICES

    2383 awards

    $20B
  • 334511

    SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING

    2650 awards

    $17B
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    323 awards

    $9.8B
  • 336413

    OTHER AIRCRAFT PARTS AND AUXILIARY EQUIPMENT MANUFACTURING

    15859 awards

    $9.8B
  • 332993

    AMMUNITION (EXCEPT SMALL ARMS) MANUFACTURING

    262 awards

    $5.9B
  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    754 awards

    $5.6B
  • 481212

    NONSCHEDULED CHARTERED FREIGHT AIR TRANSPORTATION

    28 awards

    $5.2B
  • 488190

    OTHER SUPPORT ACTIVITIES FOR AIR TRANSPORTATION

    199 awards

    $4.5B

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Sep 10, 2026Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL541990USGS LANDSAT 9 OBSERVATORY ENGINEERING SUPPORT SERVICES$48K →
Sep 9, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES$3.0M →
Sep 3, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.$1.3M →
Sep 2, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS$3.0M →
Sep 2, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)$6.3M →
Aug 31, 2026Department of JusticeFBI-JEH541611FAMS IGATE SOFTWARE AND SERVICE$826K →
Aug 24, 2026National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER541715HELIOSWARM PROGRAM SUPPORT$2.9M →
Aug 21, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)$24M →
Aug 20, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER541712IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS$33M →
Aug 19, 2026Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS517919IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS).$35K →
Aug 19, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER811121THE OBJECTIVE OF THIS EFFORT IS TO ENHANCE, BUILD UPON, AND MAINTAIN THE ATMOSPHERIC MODELING AND SIMULATION CAPABILITIES DEVELOPED IN PREVIOUS CONTRACT ITERATIONS.$300K →
Aug 12, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)$5.5M →
Aug 11, 2026National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR488190PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.$3.0M →
Aug 6, 2026General Services AdministrationGSA FAS AAS REGION 5541611STRATEGIC PLANNING BUSINESS ANALYSIS PROGRAM MANAGEMENT SUPPORT TITLE III LOGICAL FOLLOW ON IGF::OT::IGF FOR OTHER FUNCTIONS$17M →
Aug 6, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)$88M →
Aug 5, 2026Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS517919IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS).$99K →
Aug 4, 2026National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541715DAMASCUS - CD$1000K →
Jul 28, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER336414THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.$1.0M →
Jul 17, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER541712IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS$20M →
Jul 15, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER481212IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2$60M →
Jul 14, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER336415SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)$42M →
Jul 9, 2026Department of Homeland SecurityC5I DIVISION 3 PORTSMOUTH513210ADAPTIVE MAINTENANCE SUPPORT SERVICES ON A TIME AND MATERIALS BASIS FOR THE VEGA ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM SOFTWARE.$328K →
Jul 9, 2026Department of Health and Human ServicesCDC OFFICE OF ACQUISITION SERVICES541512MICROBENET IT SUPPORT$27K →
Jul 6, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER336413(50) SPOOLS OF HI-NICALON(TM) HIGH-PERFORMANCE, CONTINUOUS SILICON CARBIDE FIBER (EQUIVALENT TO 5.5 KG OF FIBER). MANUFACTURER PART # IS NLH107.$49K →
Jun 29, 2026Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS517919IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS).$120K →

Top Compensated Officers

From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.

  • WESLEY G BUSH

    Rank 1 · Reported Dec 12, 2024

    $159M
  • KATHY J WARDEN

    Rank 2 · Reported Dec 12, 2024

    $20M
  • WESLEY BUSH

    Rank 3 · Reported Jul 6, 2018

    $16M
  • GLORIA A FLACH

    Rank 4 · Reported Dec 12, 2024

    $12M
  • LINDA A MILLS

    Rank 5 · Reported Feb 23, 2018

    $9.2M

Want to win work like Northrop Grumman Corporation?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.