Federal Contractor Profile
Northrop Grumman Corporation
Federal contracting record: $158B obligated across 36,226 awards from 23 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
NKVZLJL93QT6
CAGE Code
6MKG6
Registered Entities (UEIs)
168 under this organization
Address
1865 INDUSTRIAL BLVD, HARVEY, LA, 700582313
First Federal Award
Oct 1, 2015
Most Recent Award
Sep 18, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$138B
87.4% of total obligations
- National Aeronautics and Space Administration$14B
8.9% of total obligations
- Social Security Administration$1.2B
0.8% of total obligations
- General Services Administration$1.2B
0.8% of total obligations
- Department of Health and Human Services$1.2B
0.7% of total obligations
- Department of Homeland Security$1.0B
0.6% of total obligations
- Department of the Treasury$468M
0.3% of total obligations
- Department of Transportation$264M
0.2% of total obligations
- Department of State$186M
0.1% of total obligations
- Department of Justice$66M
0.0% of total obligations
Top NAICS Activity
- $28B
- $22B
- $20B
- 334511$17B
SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING
2650 awards
- 541715$9.8B
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)
323 awards
- $9.8B
- $5.9B
- 541712$5.6B
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
754 awards
- $5.2B
- $4.5B
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Sep 10, 2026 | Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL | 541990 | USGS LANDSAT 9 OBSERVATORY ENGINEERING SUPPORT SERVICES | $48K → |
| Sep 9, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | $3.0M → |
| Sep 3, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT. | $1.3M → |
| Sep 2, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS | $3.0M → |
| Sep 2, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC) | $6.3M → |
| Aug 31, 2026 | Department of JusticeFBI-JEH | 541611 | FAMS IGATE SOFTWARE AND SERVICE | $826K → |
| Aug 24, 2026 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 541715 | HELIOSWARM PROGRAM SUPPORT | $2.9M → |
| Aug 21, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC) | $24M → |
| Aug 20, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 541712 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | $33M → |
| Aug 19, 2026 | Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS | 517919 | IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS). | $35K → |
| Aug 19, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 811121 | THE OBJECTIVE OF THIS EFFORT IS TO ENHANCE, BUILD UPON, AND MAINTAIN THE ATMOSPHERIC MODELING AND SIMULATION CAPABILITIES DEVELOPED IN PREVIOUS CONTRACT ITERATIONS. | $300K → |
| Aug 12, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC) | $5.5M → |
| Aug 11, 2026 | National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR | 488190 | PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT. | $3.0M → |
| Aug 6, 2026 | General Services AdministrationGSA FAS AAS REGION 5 | 541611 | STRATEGIC PLANNING BUSINESS ANALYSIS PROGRAM MANAGEMENT SUPPORT TITLE III LOGICAL FOLLOW ON IGF::OT::IGF FOR OTHER FUNCTIONS | $17M → |
| Aug 6, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC) | $88M → |
| Aug 5, 2026 | Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS | 517919 | IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS). | $99K → |
| Aug 4, 2026 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541715 | DAMASCUS - CD | $1000K → |
| Jul 28, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 336414 | THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES. | $1.0M → |
| Jul 17, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 541712 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | $20M → |
| Jul 15, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 481212 | IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2 | $60M → |
| Jul 14, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 336415 | SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC) | $42M → |
| Jul 9, 2026 | Department of Homeland SecurityC5I DIVISION 3 PORTSMOUTH | 513210 | ADAPTIVE MAINTENANCE SUPPORT SERVICES ON A TIME AND MATERIALS BASIS FOR THE VEGA ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM SOFTWARE. | $328K → |
| Jul 9, 2026 | Department of Health and Human ServicesCDC OFFICE OF ACQUISITION SERVICES | 541512 | MICROBENET IT SUPPORT | $27K → |
| Jul 6, 2026 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 336413 | (50) SPOOLS OF HI-NICALON(TM) HIGH-PERFORMANCE, CONTINUOUS SILICON CARBIDE FIBER (EQUIVALENT TO 5.5 KG OF FIBER). MANUFACTURER PART # IS NLH107. | $49K → |
| Jun 29, 2026 | Department of Transportation693KA8 SYSTEM OPERATIONS CONTRACTS | 517919 | IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS). | $120K → |
Top Compensated Officers
From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.
- $159M
WESLEY G BUSH
Rank 1 · Reported Dec 12, 2024
- $20M
KATHY J WARDEN
Rank 2 · Reported Dec 12, 2024
- $16M
WESLEY BUSH
Rank 3 · Reported Jul 6, 2018
- $12M
GLORIA A FLACH
Rank 4 · Reported Dec 12, 2024
- $9.2M
LINDA A MILLS
Rank 5 · Reported Feb 23, 2018
Want to win work like Northrop Grumman Corporation?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.