Skip to content

Open for responses

B--NV AIM TERRESTRIAL DATA COLLECTION PERMITTING

INTERIOR, DEPARTMENT OF THE

Notice type
Sources Sought
Solicitation #
140LL027Q0027
NAICS
541620
PSC
B525
Posted
November 12, 2026
Response due
November 30, 2026

What this opportunity is

The Department of the Interior is conducting a Sources Sought notice for environmental consulting services related to terrestrial monitoring surveys in Nevada, utilizing the Bureau of Land Management's Assessment, Inventory and Monitoring protocols. This opportunity is suited for small businesses under NAICS 541620, with a size standard of $19 million. Interested vendors should be aware that this is an RFI for market research purposes only, and does not constitute a solicitation for proposals or quotes; thus, responses are voluntary and at the vendor's expense.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

BUREAU OF LAND MANAGEMENT Nevada Statewide Terrestrial Assessment, Inventory, and Monitoring Data Collection for Permitting and Habitat Assessments Performance Work Statement (PWS) INTRODUCTION The Bureau of Land Management (BLM) in the state of Nevada is collecting Terrestrial Assessment, Inventory and Monitoring (AIM) data to evaluate grazing and other permitted uses, conduct habitat evaluations for greater sage-grouse and other special status species, and other high-priority Field Office needs to support Administration Priorities. The Assessment, Inventory and Monitoring (AIM) strategy is an approved and widely accepted monitoring strategy to evaluate the condition of natural resources on BLM lands. This scope of work is for Terrestrial AIM data collection. The requisite scope of work includes 300 points in the 2027 field season, as reflected in Table 1. Data points sampled as part of this project may be randomly located or targeted and will include multiple monitoring designs. BACKROUND 2.1 Period of Performance The period of performance for this project is 04/01/2027 through 11/30/2027. 2.2 Regulatory Guidance The contractor shall be responsible for collecting data at targeted and randomly distributed points on BLM administered lands throughout individual BLM Districts within Nevada as depicted in Table 1. Data collection occurs in accordance with the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems found on the https://www.blm.gov/aim website. At all plots, core methods as described in the Monitoring Manual will be completed. Required supplemental protocols include forb frequency at all plots, sagebrush shape at all plots, and Joshua tree demographics on 26 plots that contain Western and/or Eastern Joshua trees (See Table 1). Section 3.2.2 contains details on supplemental data collection methods, and protocols for these methods are included as appendices. Data collection shall be implemented at appropriate time windows for vegetation expression as detailed in Table 1. Plots that have been visited during the previous cycle will not require the completion of a soil pit or the plot characterization form. The subset of plots that will require a soil pit and the completion of the plot characterization form including determination of soil component and ecological site are described in Table 1 under the “Subset of Plots with Plot Characterization” column. Table 1. Workload of plots per District and Project District Office or Project Total Number of Plots Subset of Plots with Plot Characterization (includes soil pit) Dates for Data Collection Methods including supplemental methods Battle Mountain District permitting and habitat assessments 50 10 MLRA 30 plots April 15 through July 15, other plots May 1 through September 30 Core methods plus sagebrush shape and forb frequency. Joshua tree demographics on 2 plots. Carson City District permitting and habitat assessments 50 10 May 1 through September 30, 2027 Core methods plus sagebrush shape and forb frequency. Elko District permitting and habitat assessments 50 10 May 1 through September 30, 2027 Core methods plus sagebrush shape and forb frequency. Ely District permitting and habitat assessments 50 40 MLRA 30 plots April 15 through July 15, 2027. Other plots May 1 through September 30, 2027 Core methods plus sagebrush shape and forb frequency. Joshua tree demographics on 8 plots. Southern Nevada District permitting and habitat assessments 50 50 April 1 through July 15, 2027 Core methods plus sagebrush shape and forb frequency. Joshua tree demographics on 16 plots. Winnemucca District permitting and habitat assessments 50 10 May 1 through September 30 Core methods plus sagebrush shape and forb frequency. Totals 300 130     2.3 Project Timeline and Deadlines This project shall follow the timeline presented in Table 2. Table 2: Project Timeline and Deadlines Timeframe Description of Work April 2027 coordinate and conduct kick off meeting April 2027 All sample points will be provided to the contractor by the BLM no later than April 1, 2027 April 2027 Southern Nevada and MLRA 30 data collection begins April or May 2027 Data collectors and managers attend an official BLM Terrestrial Core Methods Training May 2027 Data collection outside of Southern Nevada and MLRA 30 begins July 15, 2027 Data collection halts for Southern Nevada and MLRA 30 September 30, 2027 Data collection outside of MLRA is complete. October 2027 Quality control and data edits for 2027 season data are completed by contractor no later than October 31, 2027. November 2027 BLM quality control and data review period. Data edits recommended by BLM are completed or justification provided by November 30, 2027. 2.4 Location Conditions Data collection often occurs in remote locations, where cellular connection is unavailable or inconsistent. The BLM recommends that field crews be prepared to camp in primitive conditions over several days and to collect data in multi-day “hitches” to minimize travel time. Data collection points may be up to 3 miles from a road (including 4WD or jeep roads) and may be on slopes as steep as 50%. Accessing sample point locations sometimes includes difficult off-trail route finding and planning ahead using a variety of tools such as topographic maps and aerial photos to locate the best and safest routes to sample locations. Weather conditions are variable and can include extreme heat and cold, monsoonal thunderstorms that can create flash-flooding, high wind speeds, and dust storms. Hazards created by wildlife and humans could be encountered. Under oversight of the contractor’s project/crew manager, field crews shall be responsible for safety and for appropriate coordination with local BLM field offices regarding rejection of sample points, possible hazardous conditions, and/or protection of local resource…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 541620