What this opportunity is
The Department of Defense is seeking small businesses to provide testing, lab, and engineering services at Pine Bluff Arsenal in Arkansas. The contract includes surface water, sediment, and fish tissue sampling, toxicity testing, statistical analysis for groundwater assessments, and compliance assistance for various environmental permits. This total small business set-aside contract is a combined synopsis/solicitation, meaning interested vendors should track the opportunity closely and prepare to submit bids as the existing contract expires in December 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
PBA Testing, Lab Services and Engineering
I. TITLE: Testing, Lab Services and Engineering
II. BACKGROUND: Pine Bluff Arsenal (PBA) performs a variety of missions for the Department of
Defense, including the manufacture and demilitarization of ammunition and related components. To
accomplish this mission within the environmental protections established by the Clean Air Act
(CAA), Clean Water Act (CWA), Resource Conservation and Recovery Act (RCRA), the
Comprehensive Environmental Restoration and Compensation Liability Act (CERCLA), and the
Spill Prevention, Control, and Countermeasure (SPCC) regulations. In addition to the
aforementioned regulations, to accomplish the mission, PBA must comply within requirements
established by the Defense Environmental Restoration Program (DERP). PBA is seeking contract
services related to these requirements. This effort will augment on-going on-site laboratory
evaluations in several media. An existing contract that provides these services will expire in
December 2026. All references to “PBA” imply action, coordination and/or approval of the
Contracting Officer (KO).
This contract will task the contractor with:
Task 1 Ecological Surveys;
Task 2 Toxicity Testing Compliance required by permit;
Task 3 Groundwater Assessments;
Task 4 Geographic Information System (GIS) Support;
Task 5 Stormwater Compliance;
Task 6 Regulatory Compliance Assistance;
Task 7 Restoration Regulatory Support
Task 8 Domestic Water Supply Well Removal
Task 9 Travel reimbursement.
The contract will be for an initial base year with four renewable option years for a possible total of
five years. The contractor shall provide on-call assistance to answer technical questions concerning
the contract deliverables for the duration of the contract. Workdays for this contract are Monday
through Friday beginning at 7:00 AM and ending at 5:00 PM, Central Time zone. Five (5) day
advance notification of contractor site visits is required. All contractor personnel performing
activities at PBA must attend a Safety Briefing before any work is conducted. The safety Briefing is
held Monday-Thursday beginning at 7:30 AM at Building 17-130.
The local work covered by this contract is to be performed at PBA. Postal address is Pine Bluff
Arsenal, 10020 Kabrich Circle, Pine Bluff, Arkansas 71602-9500. The Arsenal is located off
Highway 530, Exit 32, about 12 miles northwest of Pine Bluff and 35 miles southeast of Little Rock.
Note: The contractor shall include the contract number, the COR’s name, and the COR’s phone
number on all items shipped to PBA.
To perform services in this Scope of Work certain accreditations and professional certification are
required. All laboratories analyzing water, sediment, soil and conducting toxicity testing for this
contract shall have a current Environmental Laboratory Accreditation from Arkansas Energy and
Environment. Additionally, professionals preparing and reviewing SPCC Plan, RCRA, and CWA
-- 1 of 13 --
permits shall have a professional engineering licensure in Arkansas. Professionals preparing and
reviewing groundwater reports shall have a professional geologist licensure in Arkansas.
Limited Emergency first aid, to prevent loss of life or limb, is available for contractor personnel at
the U.S. Army Health Clinic at PBA for injuries sustained in the performance of their duties. This
service is normally available from 0630 to 1630, Monday through Thursday. For any other injury,
contractor personnel should go to Jefferson Regional Medical Center or see their private physician.
The requirements of Department of Labor, Occupational Safety and Health Administration (OSHA)
Standard 29 CFR 1910 will be followed.
All contractor and sub-contractor personnel will adhere to all applicable PBA and Army regulations.
No fire or flame-producing device will be used on the Arsenal without prior approval of the
Contracting Officer. The contractor shall also be required to obtain a burn or hot work permit
from the Fire Department.
Smoking will not be permitted, except in designated areas.
Equipment will be maintained in a safe operating condition and a fire safe condition at all
times. It shall be stored in a designated area, approved by the Contracting Officer.
Hoists, cranes, derricks, or similar equipment shall not be operated where it is possible to
bring any part of the machine, suspended load, or lines closer than ten feet to power lines
unless the lines have been de-energized and grounded.
III. TASKS
Task Number 001: Ecological Surveys
Ecological Surveys:
Task 1.1 The contractor shall conduct Ecological Surveys as required by the Division of Environmental
Quality (DEQ) and in the RCRA and NPDES permits. These surveys will assess the current water,
sediment and biological status of the Arsenal’s surface waters. Additionally, these surveys will
determine the effectiveness of corrective measures, long-term pollution abatement measures and any
other required regulatory compliance measures. On an annual basis, the contractor shall conduct
ecological monitoring and assessment of the Arsenal’s Solid Waste Management Unit (SWMU) closure
sites following the 2008 Ecological Monitoring Plan1 (GLEC 2008). The monitoring will measure the
selected contaminants and toxicity from samples collected from surface waters, sediments and fish
tissues at the following four areas of the PBA site:
1. SWMU 75. To address surface water and sediment quality within Phillips Creek, in particular
both up- and down-stream of the former remnant DDT source area removal that was completed
during 2004. The following will be sampled in Phillips Creek: Five (5) surface water samples, 5
sediment samples, and fish tissue samples at 5 locations.
-- 2 of 13 --
2. SWMUs 23 and 24. To address sediment quality downstream of the soil removal at SWMU 24,
and soil removal and capping activities at SWMU 23 that were conducted during 2004.
Ecological monitoring will be conducted at up- and down-gradient l…
Source: SAM.gov, as posted. Verify the current solicitation before responding.