Description
Consulate of the United States of America
Casablanca, Moracco
FACILITY MANAGEMENT OFFICE
SCOPE OF WORK
DATE: November 17, 2026
PROJECT: VILLA MIRADOR MAINTENACE AND REPAIR
The Consulate of the United States of America in Casablanca, requests a proposal for the project as described below.
Foreword: Strategic Significance, Asset Condition, and Professional Imperatives
The U.S. Consul General’s Residence (CGR), historically known as Villa Mirador, is located within the premier Anfa-Supérieur neighborhood of Casablanca, Morocco. Acquired by the United States government in 1947, this landmark property is officially registered in Washington, D.C., as a Culturally Significant Heritage Property. Beyond its architectural value, Villa Mirador stands as a vital piece of American diplomatic history and serves as an active, high-profile platform for U.S. diplomacy, bilateral engagement, and international outreach in North Africa.
Current Condition and Project Objective
Due to successive years of deferred maintenance and systemic repair backlogs, the residence has experienced significant material and structural degradation. Prolonged exposure to intense solar radiation and aggressive coastal marine atmospheric conditions have caused severe silvering in the historic wood windows. Additionally, the extensive decorative metal gratings protecting the first-floor windows suffer from deep rust and failing paint layers, while the upper masonry ramparts exhibit structural spalling.
The primary objective of this Scope of Work (SOW) is to arrest this environmental decline while returning the interior to its original luster. The selected contractor will completely rehabilitate the facility, returning it to an elite, institutional standard that ensures its long-term preservation and provides a safe, highly functional environment for the current and future Consul Generals.
Demanded Professionalism and Engineering Rigor
Because Villa Mirador is an active, registered diplomatic heritage asset, standard commercial construction tolerances and methods are entirely insufficient. Bidding companies must approach this project with a sophisticated hybrid discipline, blending civil and mechanical engineering controls with meticulous historical restoration techniques. Every phase of execution requires an absolute commitment to structural integrity, material longevity, and architectural authenticity.
Contractors must strictly adhere to the following professional and operational mandates:
Engineering Quality & Material Science: All structural mortars, wood stabilizers, and industrial coatings must be chemically compatible with the existing 1940s-era substrates. Material data sheets must be verified to withstand Casablanca's coastal climate before application.
Artisanal Restoration Standards: Technicians must possess proven, specialized experience in treating aged wood fibers, stabilizing historic concrete, and remediating heavily oxidized ironwork without altering original design profiles.
Security & Logistics Discipline: Ground-floor decorative gratings represent the site's primary physical security barrier. The logistical pipeline for removing, cataloging, transporting, sandblasting offsite, and reinstalling these heavy assemblies must be tightly controlled.
Finally: This project demands unparalleled operational discipline, strict scheduling, and clear technical communication. By submitting a bid, the contractor commits to delivering a restored diplomatic facility that reflects the prestige of the United States and honors the cultural heritage of Morocco.
CGR Interior maintenance & repair work.
Section X: CGR Interior/Exterior Maintenance and Repair Work
X.1 Scope of Work
The Contractor shall provide all labor, supervision, materials, tools, equipment, transport, and safety measures necessary to perform interior and exterior maintenance and surface restoration at the Consul General Residence (CGR) in Casablanca. All work shall progress through the systematic execution steps outlined below.
X.2 Technical Performance Specifications
Step 1: Mobilization, Site Protection, and Surface Repair
Pre-Work Protection: Prior to the commencement of any tradecraft, the Contractor shall install comprehensive surface protection across all affected areas. This includes protective coverings (e.g., PVC foil, heavy-duty drop cloths, and professional painter's tape) to secure flooring, fixtures, openings, cabinetry, millwork, and furnishings.
MEP Coordination: The Contractor shall coordinate continuously with concurrent Mechanical, Electrical, and Plumbing (MEP) trades to avoid operational conflicts.
Penetration & Opening Patching: Repair and patch all wall and ceiling penetrations, chases, and openings resulting from electrical or plumbing demolition.
Stone Rampart Restoration: The Contractor shall ensure all stone ramparts located on the second floor are structurally patched using hydraulic concrete and fully sealed against environmental degradation.
Structural Defects & Crack Repair: Repair all pre-existing cracks, holes, and surface irregularities. If structural supports were removed during prior renovations, the Contractor shall engineer and add necessary structural reinforcement to properly support the load.
Finish Sanding & Pre-Treatment: Sand and feather all patched surfaces to achieve a perfectly smooth, flush finish. Perform thorough wall and ceiling cleaning to remove dust, grit, and loose elements.
Spot-Priming: Apply a targeted spot-prime coat on all repaired wall and ceiling segments.
Step 2: Interior Primer Coating
Full-Surface Application: Apply one full-surface primer coat across all interior walls and ceilings using TOUPRET CB, STOPASTRAL (ASTRAL) (White), or a pre-approved equivalent product.
Step 3: Interior Impregnation Layer
Moisture/Base Binding: Apply a comprehensive interior impregnation laye…
Source: SAM.gov, as posted. Verify the current solicitation before responding.