Skip to content

Open for responses

F-FAC-SVC-Clean Residential Rain Gutters & Downpouts-GO-CSS

STATE, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
PR16287207
NAICS
5617
PSC
R499
Posted
November 17, 2026
Response due
November 22, 2026
Place of performance
Frankfurt, DE-HE

What this opportunity is

The U.S. Consulate General Frankfurt is seeking contractors for gutter and downspout cleaning and minor repair services at 32 residential buildings in the Carl Schurz Siedlung. This solicitation falls under NAICS 5617 and is suitable for small businesses experienced in maintenance and repair services. Interested vendors should note that this is a solicitation notice, indicating the need to prepare a bid rather than simply tracking the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

09/15/2026 STATEMENT of WORK 1 UNCLASSIFIED MAINTENANCE & REPAIR STATEMENT of WORK Frankfurt, Germany Gutter and Downspout Cleaning and Minor Repair Services Carl Schurz Siedlung CONTENTS: PART ONE GENERAL PART TWO PRODUCTS PART THREE EXECUTION PART FOUR SCHEDULE U.S. CONSULATE GERNERAL FRANKFURT, GERMANY FACILITY MANAGEMENT -- 1 of 6 -- 09/15/2026 STATEMENT of WORK 2 UNCLASSIFIED PART ONE – GENERAL C.1.1 SUMMARY: A. The U.S. Consulate General Frankfurt requires cleaning, inspecting, minor repair, and maintenance of the rain gutters and downspouts of 32 residential buildings at the Carl Schurz Siedlung to ensure proper stormwater drainage and prevent water damage to the facility. The Contractor shall provide all necessary labor, materials, supervision, and equipment to complete the project. Work includes, but is not limited to: 1. Remove all debris (leaves, dirt, twigs, nests, sediment, and other obstructions) from all gutters, valleys, and downspouts 2. Inspect gutters, downspouts, hangers, brackets, seams, and joints for damage, leaks, rust, sagging, or separation from the structure 3. Perform minor repairs identified during cleaning and inspection a. Minor repairs shall be billed on a time-and-materials basis C.1.2 SUBMITTALS: A. Contractor’s crew individual identification information for visitor access requests. B. Submit list of all subcontractors with evidence of subcontractor's insurance coverage. C. Project schedule showing work phasing and proposed daily progress. C.1.3 CONTRACT ADMINISTRTION A. The Contractor shall not perform any work outside this Statement of Work unless authorized in writing by the Contracting Officer (CO). B. The CO will issue a Notice to Proceed (NTP). C. The Contracting Officer’s Representative (COR) will oversee daily execution and ensure compliance. D. Any proposed changes must be submitted in writing and approved before work proceeds. E. The Contractor shall identify a Project Site Manager who shall be responsible for the overall management of the project and shall represent the Contractor on the site during construction. The Project Site Manager is required to be German and English-speaking and shall be approved by the COR. C.1.4 QUALITY CONTROL: A. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services. B. The Work shall be governed by the U.S. Consulate General Frankfurt, Germany. All work is to be in compliance with International Codes and standards, which includes the most recent published edition of the OBO Building code, National Fire Prevention Association (NFPA), International Fire Code (IFC), International Building Code (IBC) , International Mechanical Code (IMC), International Plumbing Code (IPC), National Electrical Installation Standards (NEiS), National Electrical Safety Code (NESC), Standard for Electrical Safety in the Workplace (NFPA-70E) and National Electric Code (NFPA-70) as amended by OBO, also are applicable. Should there be a discrepancy between the US Government Specifications and the applicable Building Code, the more stringent of the two shall govern. C.1.5 STORAGE OF MATERIALS: A. The Contractor is responsible for safe and secure storage of materials. B. On-site staging must be coordinated with the COR. C. Temporary utilities must be connected and disconnected in coordination with Facility Management. -- 2 of 6 -- 09/15/2026 STATEMENT of WORK 3 UNCLASSIFIED C.1.6 PROJECT SAFTEY: A. Contractor is responsible for safety and shall comply with US Consulate General requirements, US Army Corp of Engineers (USACE) Safety Manual (EM 385-1-1), U.S. OSHA Regulations and all local labor laws, regulations, customs and practices pertaining to labor, safety and similar matters. Contractor shall prepare a Project Safety Plan to cover total project safety to be reviewed and approved by the Contracting Officer Representative (COR), and U.S. Consulate Post Occupational Safety and Health Officer (POSHO). B. Contractor shall furnish Personal Protective Equipment (PPE) for each employee as required for the specific job type and in accordance with (IAW) relevant OSHA regulations. C. All external personnel assigned to a project are required to participate in a mandatory online safety briefing conducted by the POSHO Safety Office. This safety training must be completed prior to the project start date and the commencement of any work activities. 1. Personnel joining the team after the project has commenced must also complete this training before undertaking any tasks. 2. Work conducted without prior safety training is strictly prohibited and will be immediately suspended upon discovery. 3. The safety briefing may be found at the following link; https://forms.office.com/g/shZ4sLh5Kn D. Electrical Safety: All electrical work must always be conducted in a "de-energized" state whenever possible and secured using the Lockout/Tagout (LOTO) system/procedure. Energized work must be handled with special precautions as outlined below. 1. Locks and tags must be applied to the equipment's energy isolation points or control panels. The tags must prominently display a warning message, along with the company name and the technician’s name. LOTO devices may only be removed by the individual who applied them. 2. Energized Work can only be performed if the supervisor requests an Energized Work Permit (EWP) at the Post Occupational Safety and Health Officer (POSHO) at least 24 hours prior to the scheduled start of work. The COR must assist the contractor in obtaining the necessary documents. E. Hot Work: A hot work permit must be requested from the contractor at least 24 hours prior to the start of the work. The COR must assist the contractor in obtaining the necessary documents. F. Confined Space: To enter c…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities from STATE, DEPARTMENT OF