09/15/2026 STATEMENT of WORK 1
UNCLASSIFIED
MAINTENANCE & REPAIR STATEMENT of WORK
Frankfurt, Germany
Gutter and Downspout Cleaning and Minor Repair Services
Carl Schurz Siedlung
CONTENTS:
PART ONE GENERAL
PART TWO PRODUCTS
PART THREE EXECUTION
PART FOUR SCHEDULE
U.S. CONSULATE GERNERAL FRANKFURT, GERMANY
FACILITY MANAGEMENT
-- 1 of 6 --
09/15/2026 STATEMENT of WORK 2
UNCLASSIFIED
PART ONE – GENERAL
C.1.1 SUMMARY:
A. The U.S. Consulate General Frankfurt requires cleaning, inspecting, minor repair, and
maintenance of the rain gutters and downspouts of 32 residential buildings at the Carl
Schurz Siedlung to ensure proper stormwater drainage and prevent water damage to the
facility. The Contractor shall provide all necessary labor, materials, supervision, and
equipment to complete the project. Work includes, but is not limited to:
1. Remove all debris (leaves, dirt, twigs, nests, sediment, and other obstructions)
from all gutters, valleys, and downspouts
2. Inspect gutters, downspouts, hangers, brackets, seams, and joints for damage,
leaks, rust, sagging, or separation from the structure
3. Perform minor repairs identified during cleaning and inspection
a. Minor repairs shall be billed on a time-and-materials basis
C.1.2 SUBMITTALS:
A. Contractor’s crew individual identification information for visitor access requests.
B. Submit list of all subcontractors with evidence of subcontractor's insurance coverage.
C. Project schedule showing work phasing and proposed daily progress.
C.1.3 CONTRACT ADMINISTRTION
A. The Contractor shall not perform any work outside this Statement of Work unless
authorized in writing by the Contracting Officer (CO).
B. The CO will issue a Notice to Proceed (NTP).
C. The Contracting Officer’s Representative (COR) will oversee daily execution and ensure
compliance.
D. Any proposed changes must be submitted in writing and approved before work proceeds.
E. The Contractor shall identify a Project Site Manager who shall be responsible for the
overall management of the project and shall represent the Contractor on the site during
construction. The Project Site Manager is required to be German and English-speaking
and shall be approved by the COR.
C.1.4 QUALITY CONTROL:
A. The Contractor shall be responsible for the professional quality, technical accuracy, and
the coordination of all construction and other services furnished under this contract. The
Contractor shall, without additional compensation, correct or revise any errors or
deficiencies in its construction and other services.
B. The Work shall be governed by the U.S. Consulate General Frankfurt, Germany. All work
is to be in compliance with International Codes and standards, which includes the most
recent published edition of the OBO Building code, National Fire Prevention Association
(NFPA), International Fire Code (IFC), International Building Code (IBC) , International
Mechanical Code (IMC), International Plumbing Code (IPC), National Electrical
Installation Standards (NEiS), National Electrical Safety Code (NESC), Standard for
Electrical Safety in the Workplace (NFPA-70E) and National Electric Code (NFPA-70) as
amended by OBO, also are applicable. Should there be a discrepancy between the US
Government Specifications and the applicable Building Code, the more stringent of the
two shall govern.
C.1.5 STORAGE OF MATERIALS:
A. The Contractor is responsible for safe and secure storage of materials.
B. On-site staging must be coordinated with the COR.
C. Temporary utilities must be connected and disconnected in coordination with Facility
Management.
-- 2 of 6 --
09/15/2026 STATEMENT of WORK 3
UNCLASSIFIED
C.1.6 PROJECT SAFTEY:
A. Contractor is responsible for safety and shall comply with US Consulate General
requirements, US Army Corp of Engineers (USACE) Safety Manual (EM 385-1-1), U.S.
OSHA Regulations and all local labor laws, regulations, customs and practices pertaining
to labor, safety and similar matters. Contractor shall prepare a Project Safety Plan to cover
total project safety to be reviewed and approved by the Contracting Officer Representative
(COR), and U.S. Consulate Post Occupational Safety and Health Officer (POSHO).
B. Contractor shall furnish Personal Protective Equipment (PPE) for each employee as
required for the specific job type and in accordance with (IAW) relevant OSHA
regulations.
C. All external personnel assigned to a project are required to participate in a mandatory online
safety briefing conducted by the POSHO Safety Office. This safety training must be
completed prior to the project start date and the commencement of any work activities.
1. Personnel joining the team after the project has commenced must also complete
this training before undertaking any tasks.
2. Work conducted without prior safety training is strictly prohibited and will be
immediately suspended upon discovery.
3. The safety briefing may be found at the following link;
https://forms.office.com/g/shZ4sLh5Kn
D. Electrical Safety: All electrical work must always be conducted in a "de-energized" state
whenever possible and secured using the Lockout/Tagout (LOTO) system/procedure.
Energized work must be handled with special precautions as outlined below.
1. Locks and tags must be applied to the equipment's energy isolation points or
control panels. The tags must prominently display a warning message, along with
the company name and the technician’s name. LOTO devices may only be
removed by the individual who applied them.
2. Energized Work can only be performed if the supervisor requests an Energized
Work Permit (EWP) at the Post Occupational Safety and Health Officer (POSHO)
at least 24 hours prior to the scheduled start of work. The COR must assist the
contractor in obtaining the necessary documents.
E. Hot Work: A hot work permit must be requested from the contractor at least 24 hours
prior to the start of the work. The COR must assist the contractor in obtaining the
necessary documents.
F. Confined Space: To enter c…