What this opportunity is
The Department of Defense is seeking information related to electrical projects utilizing Progressive Design Build (PDB) under Other Transaction Authority (OTA) in New Mexico. This opportunity is open to all business types as there is no set-aside for small businesses. As a Sources Sought notice, this is primarily for market research, so interested firms should track the opportunity rather than submit bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Demo Sub 3, Rebuild Sub 10
Kirtland Air Force Base, New Mexico
MHMV080002
Specifications
100% Submittal
31 August 2023
GCAG/SCG JV Project # 18063
Prepared For:
Prepared By:
-- 1 of 944 --
THIS PAGE INTENTIONALLY LEFT BLANK
-- 2 of 944 --
DEMO SUB 3, REBUILD SUB 10 MHMV080002
KIRTLAND AFB, NEW MEXICO
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 10 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTARATIVE REQUIREMENTS
01 32 16.00 20 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
01 33 10 TIME EXTENSION - WEATHER DELAYS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 45 35 SPECIAL INSPECTIONS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 72 80 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH PERFORMANCE COATINGS
-- 3 of 944 --
DEMO SUB 3, REBUILD SUB 10 MHMV080002
KIRTLAND AFB, NEW MEXICO
PROJECT TABLE OF CONTENTS Page 2
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
DIVISION 26 - ELECTRICAL
26 05 13.00 40 MEDIUM-VOLTAGE CABLES
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 70.00 40 HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 11 14.00 10 MAIN ELECTRIC SUPPLY STATION AND SUBSTATION
26 12 19.00 40 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 13 13 METAL-CLAD SWITCHGEAR
26 13 14 SWTICHGEAR HOUSE
26 18 23.00 40 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 35 33.00 40 POWER FACTOR CORRECTION EQUIPMENT
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
31 32 19.13 GEOGRID SOIL STABILIZATION
31 32 19.16 GEOTEXTILE SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE FOR FLEXIBLE PAVING
32 11 26 HOT-MIX BITUMINOUS BASE COUSE FOR ROADS AND STREETS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 40 00 STORMWATER UTILITIES
33 46 13 FOUNDATION DRAINAGE
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- 4 of 944 --
DEMO SUB 3, REBUILD SUB 10 MHMV080002
KIRTLAND AFB, NEW MEXICO
PROJECT TABLE OF CONTENTS Page 3
33 73 00.00 40 UTILITY TRANSFORMERS
33 77 36.00 40 MEDIUM-VOLTAGE UTILITY FUSES
ATTACHMENTS
1 - DoD UCNI HANDLING GUIDANCE
2 - 01 14 00 BASE PASSES MASTER LOG
3 - 01 14 00 SFMIS AND BACKGROUND CHECK FORMS
4 - 01 35 40.00 20 APPENDIX A
5 - 01 35 40.00 20 APPENDIX B CHECKLIST OF ENVIRONMENTAL REQUIREMENTS
6 - 01 35 40.00 20 APPENDIX C
7 - 01 35 40.00 20 APPENDIX D WITH HAZARDOUS MATERIAL REQUIREMENTS FOR
SHORT-TERM CONSTRUCTION CONTRACTORS
8 - 01 72 80 DD FORM 1354
9 - 01 74 19 APPENDIX A WASTE SUMMARY
-- End of Project Table of Contents --
-- 5 of 944 --
THIS PAGE INTENTIONALLY LEFT BLANK
-- 6 of 944 --
DEMO SUB 3, REBUILD SUB 10 MHMV080002
KIRTLAND AFB, NEW MEXICO
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/11
PART 1 GENERAL
1.1 REFERENCES
No references identified in this section.
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E
2114, Section 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect
on the environment in comparison to conventional products and services.
This comparison may consider raw materials acquisition, production,
manufacturing, packaging, distribution, reuse, operation, maintenance,
or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the
building interior that impact occupants, including air quality,
illumination, acoustics, occupant control, thermal comfort,
daylighting, and views.
c. "Operational performance" is the functional behavior of the building as
a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and
societal considerations.
1.3 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor
shall submit records in accordance with paragraph entitled,
"Government F…
Source: SAM.gov, as posted. Verify the current solicitation before responding.