What this opportunity is
The Department of Energy is soliciting a general contractor for the reconstruction and renovation of the Kautz Road Substation in Illinois, part of the Utilities Infrastructure Project. This opportunity is open to all businesses, as there is no set-aside. Contractors should note the critical timeline, with construction needing to align with Fermilab's accelerator shutdown from January 1, 2028, to January 1, 2030, making it essential to track the project milestones closely to ensure compliance with the schedule.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Utilities Infrastructure Project TO5 KRS - 100% Final Design
Fermilab Project No. PO 718592 November 13, 2025
SPECIFICATIONS TABLE OF CONTENTS 000000 - 1
SECTION 00000
SPECIFICATIONS TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
010010 - GENERAL REQUIREMENTS
012300 - ALTERNATES
012500 - SUBSTITUTION PROCEDURES
012600 - CONTRACT MODIFICATION PROCEDURES
012900 - INVOICING PROCEDURES
013000 - PROJECT MANAGEMENT AND COORDINATION
013100 - ESH REQUIREMENTS
013200 - CONSTRUCTION PROGRESS DOCUMENTATION
013233 - PHOTOGRAPHIC DOCUMENTATION
013300 - SUBMITTALS
014100 - QUALITY REQUIREMENTS
015000 - TEMPORARY FACILITIES AND CONTROLS
015639 - TEMPORARY TREE AND PLANT PROTECTION
016000 - PRODUCT REQUIREMENTS
017300 - EXECUTION
017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017700 - CLOSEOUT PROCEDURES
017823 - OPERATION AND MAINTENANCE DATA
017839 - PROJECT RECORD DOCUMENTS
017900 - DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
024119 - SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
033000 - CAST-IN-PLACE CONCRETE
-- 1 of 560 --
Utilities Infrastructure Project TO5 KRS - 100% Final Design
Fermilab Project No. PO 718592 November 13, 2025
SPECIFICATIONS TABLE OF CONTENTS 000000 - 2
DIVISION 05 - METALS
051200 - STRUCTURAL STEEL FRAMING
DIVISION 07 – ROOFING, WATERPROOFING & INSULATION
078413 - PENETRATION FIRESTOPPING
DIVISION 09 - FINISHES
099123 - INTERIOR PAINTING
DIVISION 26 - ELECTRICAL
Technical Specifications
260513 - MEDIUM-VOLTAGE CABLES
260513.1 - MEDIUM VOLTAGE CABLE BUS
260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS
260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
260544.1 - DUCT SEALING SYSTEM
260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
260573.13 - SHORT-CIRCUIT STUDIES
260573.16 - COORDINATION STUDIES
260573.19 - ARC-FLASH HAZARD ANALYSIS
261216 - DRY-TYPE, MEDIUM-VOLTAGE TRANSFORMERS
262726 - WIRING DEVICES
262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
263213.14 - DIESEL ENGINE GENERATORS
263526.1 - HARMONIC FILTER - REACTORS
263526.2 - HARMONIC FILTER - RESISTORS
263526.3 - HARMONIC FILTER - CAPACITORS
265000 - LUMINAIRES
HV Specifications
-- 2 of 560 --
Utilities Infrastructure Project TO5 KRS - 100% Final Design
Fermilab Project No. PO 718592 November 13, 2025
SPECIFICATIONS TABLE OF CONTENTS 000000 - 3
345kV CCVT
345kV DISCONNECT SWITCH
LV Specifications
TELECOM BUILDING
DIVISION 28 - FIRE ALARM
283111 - DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM
DIVISION 31 - EARTHWORK
311000 - SITE CLEARING
312000 - EARTH MOVING
312500 - EROSION AND SEDIMENTATION CONTROL
316329 - DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 – EXTERIOR IMPROVEMENTS
321216 - ASPHALT PAVING
323113.53 - HIGH-SECURITY CHAIN LINK FENCES AND GATES
DIVISION 33 - SITE UTILITIES
334200 - STORMWATER CONVEYANCE
END OF SECTION 000000
-- 3 of 560 --
Utilities Infrastructure Project TO5 KRS - 100% Final Design
Fermilab Project No. 3-5-207 November 13, 2025
GENERAL REQUIREMENTS 010010 - 1
SECTION 010010
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 PURPOSE
A. The following specification provides the project-specific requirements that are supplementary to
the requirements of the Fermi Forward Discovery Group, LLC (FermiForward) Subcontract
General Provisions and the FermiForward General Terms and Conditions for Construction.
B. The Contractor is required to plan, control, and deliver the final project according to the
Specifications. The project must possess complete functional systems and be assembled safely
and in quality fashion following industry standards, regulatory requirements, and best practices.
1.2 SUMMARY
A. The Contractor shall provide in the performance of the work under this subcontract all labor,
materials, equipment, transportation, services, occupational exposure monitoring and supervision
required to maintain work sites that meet the Environmental, Safety and Health Division (ES&H)
requirements found in Section 01 31 00.
B. All major elements of the work are believed to be adequately described herein. The General
contractor (GC) shall utilize his or her knowledge and experience to anticipate, and include in the
cost of the work, any incidentals of work which may be required, but are not specifically
expressed herein, in order to provide a complete and fully functional facility and/or system.
C. Definitions and roles and responsibilities can be found in Section 01 31 00.
D. The General Contractor shall hold and save FermiForward and the Government, its officers and
agents, free and harmless from liability of any nature occasioned by the General contractor’s
performance.
E. Where drawings, Division 1 specifications and technical specifications mention Contractor or
General Contractor, these are used interchangeably and are both deemed to mean the company
subcontracted to FermiForward to construct and manage construction. FermiForward
responsibilities are described as Fermilab, FermiForward and/or The Owner.
F. FermiForward Construction Management Office:
1. Construction Coordinator: Tim Scholz (tscholz@fnal.gov), 630.524.8495
2. Procurement Officer: Chris Daley (cdaley@fnal.gov), 630.840.4256
G. Working Days. Where drawings and specifications may refer to “days”, this is expected to mean
“working days”.
-- 4 of 560 --
Utilities Infrastructure Project TO5 KRS - 100% Final Design
Fermilab Project No. 3-5-207 November 13, 2025
GENERAL REQUIREMENTS 010010 - 2
1.3 SITE LOCATION
A. The General contractor shall confine all operations (including storage of materials) on Fermilab
premises to areas authorized or approved by FermiForward.
B. Any excavation work performed to be coordinated with FermiForward
Joint Utility Locating Information for Excavators (JULIE). as follows:
1. Locates for non-FermiForward owned utilit…
Source: SAM.gov, as posted. Verify the current solicitation before responding.