Skip to content

Open for responses

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

ENERGY, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
RFP-383167-CD
NAICS
237130
PSC
Z2MZ
Set-aside
No Set aside used
Posted
November 2, 2026
Response due
December 18, 2026
Place of performance
Batavia, IL

What this opportunity is

The Department of Energy is soliciting a general contractor for the reconstruction and renovation of the Kautz Road Substation in Illinois, part of the Utilities Infrastructure Project. This opportunity is open to all businesses, as there is no set-aside. Contractors should note the critical timeline, with construction needing to align with Fermilab's accelerator shutdown from January 1, 2028, to January 1, 2030, making it essential to track the project milestones closely to ensure compliance with the schedule.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Utilities Infrastructure Project TO5 KRS - 100% Final Design Fermilab Project No. PO 718592 November 13, 2025 SPECIFICATIONS TABLE OF CONTENTS 000000 - 1 SECTION 00000 SPECIFICATIONS TABLE OF CONTENTS DIVISION 01 – GENERAL REQUIREMENTS 010010 - GENERAL REQUIREMENTS 012300 - ALTERNATES 012500 - SUBSTITUTION PROCEDURES 012600 - CONTRACT MODIFICATION PROCEDURES 012900 - INVOICING PROCEDURES 013000 - PROJECT MANAGEMENT AND COORDINATION 013100 - ESH REQUIREMENTS 013200 - CONSTRUCTION PROGRESS DOCUMENTATION 013233 - PHOTOGRAPHIC DOCUMENTATION 013300 - SUBMITTALS 014100 - QUALITY REQUIREMENTS 015000 - TEMPORARY FACILITIES AND CONTROLS 015639 - TEMPORARY TREE AND PLANT PROTECTION 016000 - PRODUCT REQUIREMENTS 017300 - EXECUTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017700 - CLOSEOUT PROCEDURES 017823 - OPERATION AND MAINTENANCE DATA 017839 - PROJECT RECORD DOCUMENTS 017900 - DEMONSTRATION AND TRAINING DIVISION 02 – EXISTING CONDITIONS 024119 - SELECTIVE DEMOLITION DIVISION 03 - CONCRETE 033000 - CAST-IN-PLACE CONCRETE -- 1 of 560 -- Utilities Infrastructure Project TO5 KRS - 100% Final Design Fermilab Project No. PO 718592 November 13, 2025 SPECIFICATIONS TABLE OF CONTENTS 000000 - 2 DIVISION 05 - METALS 051200 - STRUCTURAL STEEL FRAMING DIVISION 07 – ROOFING, WATERPROOFING & INSULATION 078413 - PENETRATION FIRESTOPPING DIVISION 09 - FINISHES 099123 - INTERIOR PAINTING DIVISION 26 - ELECTRICAL Technical Specifications 260513 - MEDIUM-VOLTAGE CABLES 260513.1 - MEDIUM VOLTAGE CABLE BUS 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING 260544.1 - DUCT SEALING SYSTEM 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS 260573.13 - SHORT-CIRCUIT STUDIES 260573.16 - COORDINATION STUDIES 260573.19 - ARC-FLASH HAZARD ANALYSIS 261216 - DRY-TYPE, MEDIUM-VOLTAGE TRANSFORMERS 262726 - WIRING DEVICES 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS 263213.14 - DIESEL ENGINE GENERATORS 263526.1 - HARMONIC FILTER - REACTORS 263526.2 - HARMONIC FILTER - RESISTORS 263526.3 - HARMONIC FILTER - CAPACITORS 265000 - LUMINAIRES HV Specifications -- 2 of 560 -- Utilities Infrastructure Project TO5 KRS - 100% Final Design Fermilab Project No. PO 718592 November 13, 2025 SPECIFICATIONS TABLE OF CONTENTS 000000 - 3 345kV CCVT 345kV DISCONNECT SWITCH LV Specifications TELECOM BUILDING DIVISION 28 - FIRE ALARM 283111 - DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM DIVISION 31 - EARTHWORK 311000 - SITE CLEARING 312000 - EARTH MOVING 312500 - EROSION AND SEDIMENTATION CONTROL 316329 - DRILLED CONCRETE PIERS AND SHAFTS DIVISION 32 – EXTERIOR IMPROVEMENTS 321216 - ASPHALT PAVING 323113.53 - HIGH-SECURITY CHAIN LINK FENCES AND GATES DIVISION 33 - SITE UTILITIES 334200 - STORMWATER CONVEYANCE END OF SECTION 000000 -- 3 of 560 -- Utilities Infrastructure Project TO5 KRS - 100% Final Design Fermilab Project No. 3-5-207 November 13, 2025 GENERAL REQUIREMENTS 010010 - 1 SECTION 010010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 PURPOSE A. The following specification provides the project-specific requirements that are supplementary to the requirements of the Fermi Forward Discovery Group, LLC (FermiForward) Subcontract General Provisions and the FermiForward General Terms and Conditions for Construction. B. The Contractor is required to plan, control, and deliver the final project according to the Specifications. The project must possess complete functional systems and be assembled safely and in quality fashion following industry standards, regulatory requirements, and best practices. 1.2 SUMMARY A. The Contractor shall provide in the performance of the work under this subcontract all labor, materials, equipment, transportation, services, occupational exposure monitoring and supervision required to maintain work sites that meet the Environmental, Safety and Health Division (ES&H) requirements found in Section 01 31 00. B. All major elements of the work are believed to be adequately described herein. The General contractor (GC) shall utilize his or her knowledge and experience to anticipate, and include in the cost of the work, any incidentals of work which may be required, but are not specifically expressed herein, in order to provide a complete and fully functional facility and/or system. C. Definitions and roles and responsibilities can be found in Section 01 31 00. D. The General Contractor shall hold and save FermiForward and the Government, its officers and agents, free and harmless from liability of any nature occasioned by the General contractor’s performance. E. Where drawings, Division 1 specifications and technical specifications mention Contractor or General Contractor, these are used interchangeably and are both deemed to mean the company subcontracted to FermiForward to construct and manage construction. FermiForward responsibilities are described as Fermilab, FermiForward and/or The Owner. F. FermiForward Construction Management Office: 1. Construction Coordinator: Tim Scholz (tscholz@fnal.gov), 630.524.8495 2. Procurement Officer: Chris Daley (cdaley@fnal.gov), 630.840.4256 G. Working Days. Where drawings and specifications may refer to “days”, this is expected to mean “working days”. -- 4 of 560 -- Utilities Infrastructure Project TO5 KRS - 100% Final Design Fermilab Project No. 3-5-207 November 13, 2025 GENERAL REQUIREMENTS 010010 - 2 1.3 SITE LOCATION A. The General contractor shall confine all operations (including storage of materials) on Fermilab premises to areas authorized or approved by FermiForward. B. Any excavation work performed to be coordinated with FermiForward Joint Utility Locating Information for Excavators (JULIE). as follows: 1. Locates for non-FermiForward owned utilit…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 237130