Skip to content

Open for responses

Hydrostatic Testing

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
M6740027Q0001
NAICS
811310
PSC
H312
Set-aside
No Set aside used
Posted
November 5, 2026
Response due
November 29, 2026
Place of performance
Iwakuni, JP-35

What this opportunity is

The Department of Defense is seeking contractors to perform hydrostatic testing on 81 Amerex B674 wheeled Halotron I fire extinguishers to ensure their structural integrity and compliance with fire protection standards. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested contractors should note that the solicitation is for a specific service and requires a detailed administrative and logistical plan within 7 days of contract award, indicating a need for careful planning and resource management.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Performance Work Statement (PWS) Hydrostatic Testing of Amerex B674 Wheeled Halotron I Fire Extinguishers 1.0 General 1.1. Introduction and Background. Headquarters and Headquarters Squadron Marine Corps Air Station (MCAS) Iwakuni, maintains a fleet of Amerex Model B674 wheeled Halotron I fire extinguishers used for flight- line fire protection. These extinguishers require periodic 12-year hydrostatic testing in accordance with National Fire Protection Association (NFPA) 10 Standard for Portable Fire Extinguishers, applicable Compressed Gas Association (CGA) and Department of Transportation (DOT) standards to ensure continued safe service. 1.2. Scope of Work and Objective. The Contractor shall perform hydrostatic testing of eighty-one (81) Amerex B674 wheeled Halotron I fire extinguisher main cylinders and discharge hose assemblies. The objective is to verify the structural integrity of each cylinder and hose assembly through hydrostatic testing so that the Government can safely return the extinguishers to service. The requirement is necessary to maintain operational readiness and compliance with fire protection standards for flight-line safety. 1.3. Period of Performance. The period of performance of this contract begins on or before 15 January 2027. The Contractor shall provide their administrative and logistical plan to the Government Representative and/or Contracting Officer Representative within 7 calendar days of contract award. The plan must detail the Contractor’s course of action, estimation of completion timeline, and proof of sufficient resources and material to conduct the service on the Government facility. If testing is performed aboard MCAS Iwakuni, a suitable working area will be available. If testing is performed at another mutually agreed location, the Contractor shall provide all necessary resources and materials. 1.3.1. Federal Holidays. The contractor shall not be required to provide services on federal holidays unless the holiday is particularly specified otherwise in this PWS. Federal Holiday Occurrence New Year’s Day 1 January* Martin Luther King Jr.’s Birthday 3rd Monday of January President’s Day 3rd Monday of February Memorial Day last Monday of May Independence Day 4 July* Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11 November* Thanksgiving Day 4th Thursday of November Christmas Day 25 December* * When a federal holiday falls on Sunday, the following Monday will be observed as a holiday by the U.S. government. When a federal holiday falls on a Saturday, the preceding Friday will be observed as a holiday. In addition to these federal holidays, if the President of the United States issues an executive order closing the federal government, that date shall also be considered a recognized federal holiday (Reference Executive Order 11582 of February 11, 1971, and 5 U.S.C. 5546 and 6103(b) and other similar statutes insofar as they relate to the pay and leave of employees of the United States). 1.3.2. Typhoon Conditions. Japan-based military installations close when Tropical Cyclone Condition of Readiness 1C (TCCOR 1C or TC-1C) is declared by Military Weather Station authorities. The Contractor shall be required to depart military bases, remain indoors, and monitor radio/television to determine when the TCCOR changes to TCCOR SW (Storm Watch) or TCCOR AC (All Clear). When TCCOR SW is declared by Military Weather Station authorities, the Contractor shall restart the service within 2 hours. If that occurs after normal business hours, services shall begin the next normal workday at 7:30am. -- 1 of 8 -- 2.0 Place of Performance. Work under this contract may be performed on Marine Corps Air Station Iwakuni, Japan, or at the Contractor’s facility (or another mutually agreed upon location), subject to approval by the Government. 3.0 Technical Requirements (Description of Work / Tasks) 3.1 Scope Arrangement. The Government will prepare each fire extinguisher for hydrostatic testing by, reclaiming all Halotron agent, fully depressurize each extinguisher, and deliver the cylinder and discharge hose assembly disassembled. Contractor custody and testing responsibility will commence upon mutual verification that delivered components are empty, depressurized, and safe to handle. Upon completion of testing, the Contractor shall return the fire extinguishers in the same manner, and a mutual verification shall be conducted to finalize the return of the fire extinguishers. The Government will prepare the below: 3.1.1 Approximately 81 Amerex B674 main cylinders and discharge hose assemblies that have been fully discharged, depressurized, and confirmed safe to handle. 3.1.2 Accurate inventory and serial-number list for the units included in the award. 3.1.3 Suitable work/staging area, electrical power, potable water, approved drainage, and reasonable material- handling support. (When work will be perform on MCAS Iwakuni) 3.1.4 Required fire-protection coverage while extinguishers are out of service. 3.1.5 Available maintenance history and prior hydrostatic-test records when available. 3.2 Contractor Tasks. 3.2.1 Receive, verify, and track each submitted cylinder/hose set by serial number. 3.2.2 Perform external and internal visual examination of the main cylinder for corrosion, deformation, mechanical damage, thread damage, and other visible rejection conditions in accordance with CGA C-6. 3.2.3 Perform visual examination of the discharge hose assembly. 3.2.4 Ensure the cylinder can safely withstand its rated service pressure plus the required test pressure without rupture, excessive distortion, or failure. 3.2.5 Determine Total Expansion and Permanent Expansion using the Water Jacket or approved method. The cylinder must meet the expansion limits. (typically permanent expansion ≤ 10% of total expansion for low-pressure cylinders). 3.2.6 Perform hydrostatic testing of the main cylinder using the applicable water-jacket test procedure and verified…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 811310