Join The Lazy Contractor's Blueprint live on Nov 28 — show up and get 1,000 free Mindy creditsJoin The Lazy Contractor's Blueprint, free and live on Nov 28
The Department of Transportation is soliciting sealed bids for pavement rehabilitation along the Natchez Trace Parkway in Mississippi, specifically between mileposts 121 and 204. This project, suitable for various business concerns, includes full depth reclamation, asphalt overlay, and other related work, with an estimated total cost between $60 million and $70 million. Bidders must be aware that a Project Labor Agreement is required prior to contract award, and bid documents will be available around November 20, 2026. Interested vendors should register on SAM.gov to receive updates and access solicitation documents.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PLANS FOR PROPOSED PROJECT
NATIONAL
PARK
SERVICE
Project Manager Lead Designer Highway Design Manager
INDEX TO SHEETS
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OCTOBER, 2026
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E
N
O
R
A
I
N
N
S
T
F
R
I
D
D
E
P
A
T
N
T
O
F
T
A
S
P
T
T
O
U
T
E
A
T
E
S
O
A
M
E
R
I
C
A
M
N/A
Natchez Trace Parkway
894
1329
e(max) 8%
C/A None
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 87.51 Miles
ADT (2024)
ADT (2044)
DHV
%Truck
D
V (MPH)
159
50/50
<1%
60
SPECIFICATIONS:
DESIGN DESIGNATION:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
BRIDGE:
ROAD: WIDTH
22'
SURFACE BASE SUBGRADE
5"-15" ACP 8" N/A
Title Sheet
Symbols And Abbreviations
Location Map
Typical Section
Summaries and Schedules
Construction Plan (Mainline Parkway)
Standards And Details
DESCRIPTION
SHEET
NO
A01
A02-A03
A05
B01-B04
C02-C13
D01-D53
S01-S32
M01 Erosion and Sediment Control Narrative
C01 Tabulation of Quantities
MS NP NATR 3N19 3H28 ETC
A06-A08 Survey Information
MISSISSIPPI
ATTALA, CHOCTAW, LEAKE, MADISON, AND WEBSTER COUNTIES
PAVEMENT REHABILITATION BETWEEN MP 121 AND MP 204 (PHASE 3)
Jamal Ghazi Alam Chris Burnell Ramnik Satasiya
other miscellaneous work.
pavement patching, pavement marking, signing, and
includes roadway asphalt milling, asphalt overlay,
access roads, and parking/pull-off areas. The work
resurfacing of the Parkway, including ramps, various
The project consists of full depth reclamation,
N
SCALE IN MILES
0 60 120
KEY MAP
STATE OF MISSISSIPPI
HOLLY
SPRINGS
TUPELO
P
ARK
W
AY
T
R
A
C
E
DELTA
NA
T
C
H
EZ
NATCHEZ
J
A
C
K
S
ON
MERIDIAN
GULFPORT
10
VICKSBURG
59
84
55
61
20
82
78
49
55
61
45
3H28 ETC
PROJECT MS NP NATR 3N19
N
SCALE IN MILES
0 40 80
MP 121
MP 204
PROJECT MS NP NATR 3N19 3H28 ETC
Know what'sbelow.
before you dig. Call
R
177.77 Miles
E01-E33 Construction Plan (Ramps and Parking)
A09 Alignment Data
N01-N23 Temporary Traffic Control Plans
LANE MILES:
A04 Roadway Inventory Data
P01-P42 Pavement Markings and Signing Plan
NATCHEZ TRACE PARKWAY
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
https://www.ms811.org/
811 or 800-227-6477
10:17 AM
3 September 2026
]
Title Sheet NPS [
\\fhfl15fileserve.flhd.fhwa.dot.gov\data\PROJECTS\natr\3n19 3h28 Etc\HWY_DES\CADD\A01_NP NATR 3N19 3H28 ETC_ttl.dgn
PROJECT NUMBER
SHEET
A01
NPS Drwg No. 604/176533 NPS PMIS No. 254233
MS NP NATR 3N19 3H28 ETC
-- 1 of 210 --
0.00 EL.
BH TP
mon.
min.
max.
MP
MOD
ML
monument
minimum
maximum
mile post
modification
main line
No.
NMSA
NC
N
number
nominal maximum size aggregate
normal crown
north
OG
OD
o. to o.
ohwm
o. c.
original ground
outside diameter
out to out
ordinary high water mark
on center
pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement
point of tangent
point of spiral to tangent
point of spiral to curve
point of tangent to spiral
proposed
point on tangent
point on spiral
point of ending
point on curve
point of beginning
plate
point of intersection
profile grade line
point of curve to spiral
point of compound curve
point of curve
rte.
rt. or RT
reqd.
reinf.
RECP
rdwy.
R/W
R.
R
route
right
required
reinforcement
rolled erosion control product
roadway
right-of-way
range
radius
spa.
shldr.
sec.
SC
SADT
S
spacing, spaces or spaced
shoulder
section
point of spiral to curve
seasonal average daily traffic
south
sidewalk
symmetrical
solid white
point of spiral to tangent spiral
structural
stiffener
stringer
standard
station
point of spiral to tangent
stopping sight distance
point of spiral to spiral (no curve)
point of spiral to reverse spiral
square yard
square foot
S/W
sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd
sqft
typ.
Ts
TS
traf.
thd.
TBM
T.
T
typical
tangent distance (spiraled curve)
point of tangent to spiral
traffic
thread
temporary bench mark
township
tangent distance
VPI
vph
var.
VC
V
vertical point of intersection
vehicles per hour
varies
vertical curve
design speed
W west
structural
stiffener
stringer
standard
station
point of spiral to tangent
stopping sight distance
point of spiral to spiral (no curve)
point of spiral to reverse spiral
square yard
square foot
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd
sqft
1 6
31 36
1 6
31 36
15
22
15
22
SEC.
16
1
16
1
SEC.
E 1
N 0
00000
JH
3000
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
flg.
fin.
flange
finish
θs
Ø
∆c
∆
DY or DTY
DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle
diameter
curve central angle
total central angle
dotted yellow
dotted white
double solid yellow
drawing(s)
distance
diaphragm
diagonal
diameter
design hourly volume
directional distribution factor
centers
curve to spiral
continuous
construction joint
connection
concrete
column
corrugated metal pipe
centerline
center to center
broken white
bearing
bridge
balance point
bench mark
building
baseline
back
asphalt
aggregate surface course
approach
amendment
ahead
aggregate
average daily traffic
asphalt concrete pavement
abutment
expansion joint
excavation
existing
edge of water
equivalent single axle load
edge of road
equation
edge of travel way
edge of shoulder
edge of pavement
embankment
elevation
electric
superelevation rate
east
exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e
E
HW
HLSD
hex.
hdwl.
inv.
INF
ID
K
jt.
high water
headlight sight distance
hexagon
headwall
invert
infinite
inside diameter
K-Value
joint
lat.
lam.
L
latitude
lamination
length of curve
LW
lt. or LT
Ls
LPSM
long.
LOD
low water
left
length of spiral
lump sum
longitudinal
Limits of Disturbance
ftg.
gnd or grnd
galv.
GAB
ga.
HW
HLSD
hex.
hdwl.
footing
ground
galvanized
graded aggregate base
gage (gauge)
high water
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.