Skip to content

Open for responses

Parking Lots Repair, National Agricultural Library and Beltsville Agricultural Research Center West

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
124PCA27Q0005
NAICS
237310
PSC
Z2LZ
Set-aside
Small Business Set Aside - Total
Posted
November 19, 2026
Response due
December 17, 2026
Place of performance
Beltsville, MD

What this opportunity is

The Department of Agriculture is seeking quotations for parking lot repair services at the National Agricultural Library and Beltsville Agricultural Research Center West in Maryland, under solicitation number 124PCA27Q0005. This opportunity is set aside for small businesses, with a NAICS code of 237310 and a size standard of $45 million. As a combined synopsis/solicitation, interested vendors should submit their quotations directly, as no separate solicitation will be issued.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SPECIFICATIONS National Agricultural Library (NAL) & Beltsville Agricultural Research Center (BARC) West Parking Lot Repairs USDA-National Agricultural Library 10301 Baltimore Ave #115 Beltsville, MD 20705 USDA-BARC West 10300 Baltimore Ave. Beltsville, MD 20705 Prepared For: U.S. Department of Agriculture Agricultural Research Service (ARS) Contract No. TBD Prepared By: U.S. Department of Agriculture –ARS Beltsville, Maryland October 27, 2026 Note: Disregard sections of this specification that are not applicable to the execution of this project. -- 1 of 150 -- NAL & BARC (West) Parking Lot Repairs PROJECT TABLE OF CONTENTS Page 1 PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 02/24 SUMMARY OF WORK 01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS 01 33 00 08/18 SUBMITTAL PROCEDURES 01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 08/23 QUALITY CONTROL 01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS 01 78 00 05/19 CLOASEOUT SUBMITTALS 01 78 23 05/23 OPERATION AND MAINTENANCE DATA DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION DIVISION 32 – EXTERIOR IMPROVEMENTS 32 01 16.71 11/22, COLD MILLING ASPHALT PAVING 32 12 13 05/24 BITUMINOUS TACK & PRIME COATS 32 12 16 16 11/12 ROAD-MIX/ HOT-MIX ASPHALT PAVING 32 17 23.16 11/24 ROAD & LOT PAVEMENT MARKINGS -- End of Project Table of Contents -- -- 2 of 150 -- NAL & BARC (West) Parking Lot Repairs PROJECT TABLE OF CONTENTS Page 2 THIS PAGE INTENTIONALLY LEFT BLANK -- 3 of 150 -- NAL – BARC(West) Parking Lot Repairs SECTION 01 11 00 Page 4 SECTION 01 11 00 PART 1 GENERAL 1.1 DESCRIPTION OF WORK 1.1.1 Work To Be DoneThe work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for repairing the Parking Lots for the National Agricultural Library (NAL) and Beltsville Agricultural Research Center (BARC) West. 1.1.2 Location. There are two work sites: 1) National Agricultural Library (NAL) 10301 Baltimore Ave #115 Beltsville, MD 20705. 2) Beltsville Agricultural Research Center (BARC)West 10300 Baltimore Ave. Beltsville, MD 20705 1.1.3 Principal Features of Work The Base Bid shall be milling, patching, numbering, and re-striping of the NAL and BARC parking lots. CLIN1 – NAL, Mill/ Repave/ Restripe Parking lot West. CLIN2 – NAL, Mill/ Repave/ Restripe Parking Lot East. CLIN3 – NAL, Mill/ Repave/ Restripe “Front” parking lot and driveways. CLIN4 – BARC West, Clean/ Restripe Parking Lots: CLIN5 (Option) – BARC West, Mill (4 Inches)/ repave road (160 Feet). See drawings. 1.2 SITE VISIT A site visit and inspection tour will be held at the National Agricultural Library & BARC west, in Beltsville, MD. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time. Contact: U.S. Department of Agriculture, ARS Attn: Stan Koseki/ Jermaine Winstead National Agricultural Library (NAL) 10301 Baltimore, Beltsville, MD 20705. 1.3 COORDINATION OF WORK 1. Workspace and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and equipment in other than assigned areas. 2. Execute work so as to minimize the normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by subcontractors. No work shall be done during the adverse weather. -- 4 of 150 -- NAL – BARC(West) Parking Lot Repairs SECTION 01 11 00 Page 4 3. Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation. 4. Building will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area. 5. Before work starts, arrange with the Contracting Officer a sequence of procedures, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. Contractor shall not mobilize and demolish the existing chiller until 1-2 weeks prior to the delivery of the new chiller. 6. The Contractor shall complete all work within 120 consecutive calendar days after Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 20 days in advance of starting work. A planned work schedule shall be submitted to the Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the Contracting Officer for approval. 7. The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris. 8. Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's facilities. Water sources will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is comple…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 237310