What this opportunity is
The Department of Agriculture is seeking quotations for parking lot repair services at the National Agricultural Library and Beltsville Agricultural Research Center West in Maryland, under solicitation number 124PCA27Q0005. This opportunity is set aside for small businesses, with a NAICS code of 237310 and a size standard of $45 million. As a combined synopsis/solicitation, interested vendors should submit their quotations directly, as no separate solicitation will be issued.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
National Agricultural Library (NAL) & Beltsville Agricultural Research
Center (BARC) West Parking Lot Repairs
USDA-National Agricultural Library
10301 Baltimore Ave #115
Beltsville, MD 20705
USDA-BARC West
10300 Baltimore Ave.
Beltsville, MD 20705
Prepared For:
U.S. Department of Agriculture
Agricultural Research Service (ARS)
Contract No.
TBD
Prepared By:
U.S. Department of Agriculture –ARS
Beltsville, Maryland
October 27, 2026
Note: Disregard sections of this specification that are not applicable to
the execution of this project.
-- 1 of 150 --
NAL & BARC (West) Parking Lot Repairs
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF
CONTENTS DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY
REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE
PUBLICATIONS
01 45 00 08/23 QUALITY CONTROL
01 50 00 11/20 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL
CONTROLS
01 78 00 05/19 CLOASEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 16.71 11/22, COLD MILLING ASPHALT PAVING
32 12 13 05/24 BITUMINOUS TACK & PRIME COATS
32 12 16 16 11/12 ROAD-MIX/ HOT-MIX ASPHALT PAVING
32 17 23.16 11/24 ROAD & LOT PAVEMENT MARKINGS
-- End of Project Table of Contents --
-- 2 of 150 --
NAL & BARC (West) Parking Lot Repairs
PROJECT TABLE OF CONTENTS Page 2
THIS PAGE INTENTIONALLY LEFT BLANK
-- 3 of 150 --
NAL – BARC(West) Parking Lot Repairs
SECTION 01 11 00 Page 4
SECTION 01 11 00
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be DoneThe work to be done consists of furnishing all labor, materials, and
equipment and performing all work in strict accordance with these specifications for
repairing the Parking Lots for the National Agricultural Library (NAL) and Beltsville
Agricultural Research Center (BARC) West.
1.1.2 Location. There are two work sites:
1) National Agricultural Library (NAL)
10301 Baltimore Ave #115
Beltsville, MD 20705.
2) Beltsville Agricultural Research Center (BARC)West
10300 Baltimore Ave.
Beltsville, MD 20705
1.1.3 Principal Features of Work
The Base Bid shall be milling, patching, numbering, and re-striping of the NAL and BARC
parking lots.
CLIN1 – NAL, Mill/ Repave/ Restripe Parking lot West.
CLIN2 – NAL, Mill/ Repave/ Restripe Parking Lot East.
CLIN3 – NAL, Mill/ Repave/ Restripe “Front” parking lot and driveways.
CLIN4 – BARC West, Clean/ Restripe Parking Lots:
CLIN5 (Option) – BARC West, Mill (4 Inches)/ repave road (160 Feet). See drawings.
1.2 SITE VISIT
A site visit and inspection tour will be held at the National Agricultural Library & BARC
west, in Beltsville, MD. All potential bidders will be notified of the exact time and date
and are strongly urged to attend the site visit. Inspection may only be made at this time,
unless prior written approval is obtained to inspect at another date and time.
Contact:
U.S. Department of Agriculture, ARS
Attn: Stan Koseki/ Jermaine Winstead
National Agricultural Library (NAL)
10301 Baltimore, Beltsville, MD 20705.
1.3 COORDINATION OF WORK
1. Workspace and space available for storing materials shall be subject to the approval
of the Contracting Officer. Do not store materials and equipment in other than assigned
areas.
2. Execute work so as to minimize the normal functioning of the facility, including
operations of utility services and any existing equipment, and with work being done by
subcontractors. No work shall be done during the adverse weather.
-- 4 of 150 --
NAL – BARC(West) Parking Lot Repairs
SECTION 01 11 00 Page 4
3. Minimize interference of construction activities with the flow of traffic by keeping
roads, walks and entrances to grounds, to parking areas and to occupied areas of
buildings clear of construction materials, debris, construction equipment and vehicles
except where noted on plans or in specifications. Provide unobstructed access to areas
required to remain in operation.
4. Building will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
5. Before work starts, arrange with the Contracting Officer a sequence of procedures,
means of access, space for storage of materials and equipment, and use of approaches,
corridors, and stairways. Contractor shall not mobilize and demolish the existing chiller
until 1-2 weeks prior to the delivery of the new chiller.
6. The Contractor shall complete all work within 120 consecutive calendar days after
Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall
provide the Government with a detailed schedule of dates on which the Contractor plans
to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 20
days in advance of starting work. A planned work schedule shall be submitted to the
Contracting Officer for approval. The schedule shall include a detailed description of the
methods and equipment to be used for each operation and the sequence of operations.
This schedule shall be updated monthly and submitted to the Contracting Officer for
approval.
7. The Contractor shall take all measures and provide all material necessary for
protecting existing equipment, property, and ongoing operations in affected areas of
construction against dust, noise and debris.
8. Power sources for the Contractor's operations will be available and supplied by the
Government to the Contractor as long as its use does not interfere with the operations of
the Government's facilities. Water sources will be available and supplied by the
Government to the Contractor as long as its use does not interfere with the operations of
any building. The Contractor is responsible for extending utility sources to his work
locations. Such extensions shall be removed after work is comple…