What this opportunity is
The Department of Defense is seeking information for the repair of electrical distribution system switchgear stations and the addition of redundancy cable, utilizing a Progressive Design Build approach under Other Transaction Authority. This opportunity falls under NAICS code 238210 and is not set aside for any specific business type, making it open to all interested contractors. As a Sources Sought notice, this is primarily for market research purposes, so interested businesses should focus on providing information rather than preparing formal bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future.
NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors
SMALL BUSINESS STANDARD: $19,000,000.00
NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.
PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a.
This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure.
Project Title
JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy
Location
Joint Base Anacostia-Bolling (JBAB), 11th Wing
Acquisition Strategy
Progressive Design-Build (PDB) via Other Transaction Authority (OTA)
Primary Objective
Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure
Primary Deliverables
100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry
Scope Breakdown by Facility & Component
ESS B18 (Switching Station Upgrade)
• Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01)
• Life-cycle cost and sustainability integration (UFC 1-200-02)
• Thermal partition separating switchgear room from power generation bay
• Dedicated HVAC system and air conditioning ductwork
• Sized space heating units
• High-efficiency interior LED lighting
ESS B168 (Repair, Upgrade & Hardening)
• Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01)
• Sustainable design practices (UFC 1-200-02)
• Dedicated single HVAC unit and duct system
• Interior/exterior high-efficiency LED flood/task lighting
• Raised roof profile with comprehensive crack sealing/insulation
• Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system
• Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk
High-Voltage Redundancy Cables
• Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168
• Baseline routing derived from 2025 Engineering Study
• Mandatory underground routing preference across base footprint
• Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation
Wireless SCADA & Grid Telemetry
• Air Force long-term smart-grid wireless connectivity architecture
• Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines
• Relay-to-control panel comm wiring for ESS B18 and ESS B168
• Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles
Key Technical Standards & Compliance Baseline
UFC 3-550-01
Exterior Electrical Power Distribution
Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards.
UFC 1-200-02
High Performance and Sustainable Building Requirements
Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration.
PDB / OTA Authority
Prototype / Collaboration Framework
Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment.
INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy:
Company Profile:
Q1. Business Name
Q2. Address
Q3. Point of Contract (Name, Title)
Q4. Phone Number
Q5. Email Address
Q6. Unique Entity ID
Q7. Cage Code
Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.)
Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other)
Other Transaction Authority (OTA) & Statutory Compliance:
Q10. OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA.
Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement?
Progressive Design-Build (PDB) / Early Contractor Involvement:
Q12. What mini…
Source: SAM.gov, as posted. Verify the current solicitation before responding.