What this opportunity is
The Department of Defense is procuring services for the relocation of UPS circuits at the NRTF Lualualei in Hawaii, classified under NAICS 238210. This opportunity is open to all businesses as there is no set-aside for small businesses. Since this is an award notice, interested parties should focus on tracking the awarded contract rather than submitting bids.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
USE OF OTHER THAN FULL AND OPEN COMPETITION SAT
1. Identification of Agency and Contracting Activity
Agency: Navy Computer and Telecomm Area Master Station Pacific (NCTAMS PAC)
Contracting Activity: NAVSUP FLC Pearl Harbor
2. Nature and/or Description of the Action Being Approved
UPS Circuit relocation for critical mission equipment from a non critical panel to the critical UPS Branch circuit panels in Building 1A [PRF 106988]
3. Description of Supplies/Services to Meet the Agency's Needs Including Estimated Value
UPS Circuit relocation for critical mission equipment from a non critical panel to the critical UPS Branch circuit panels in Building 1A [PRF 106988]
The Contractor is required to perform critical circuit relocation of equipment from non critical power panels to the critical Uninterruptible Power Supply (UPS) branch circuit p
1A. Currently, several low-powered telecommunications equipment systems experience service disruptions during utility power transitions, which directly impacts active milita
The scope of work requires the contractor to relocate and land twelve (12) circuits as follows:
Panel P/P2 (6 Circuits):
One (1) Naval Research Laboratory (NRL) circuit breaker.
Two (2) Matreces circuit breakers.
One (1) Purge unit circuit breaker.
Two (2) spare slots/breakers.
Panel P/P3 (6 Circuits):
One (1) Outside rack circuit breaker.
One (1) Telecommunications (Telecom) circuit breaker.
One (1) Absorbent Glass Mat (AGM) battery charger circuit breaker.
Three (3) spare slots/breakers.
Additionally, the Contractor must coordinate and execute the required Panel and Equipment Authorized Service Interruptions (ASIs) to prevent unplanned outages, install new
land the wiring, perform 100% operational testing, and provide a comprehensive project closeout report.
Period of Performance: Not to exceed fourteen (14) business days from on-site start.
The total estimated cost for this requirement is: $
Estimated Dollar Value:
FY/Option/Ordering Period OM&N OPN RDT&E
FY 2026 0.00 0.00
Subtotals 0.00 0.00
Total
4. Statutory Authority Permitting Other Than Full and Open Competition
1. FAR 13.106 1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer
the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand name or industrial mobilizatio
J&A #:
Is the requested material or service represents the minimum requirements of the Government Estimated Dollar?
10 U.S.C. 3204(a)(2) as implemented by FAR 6.302-2 Unusual and
Compelling Urgency
Additional Information Regarding Statutory Authority if Applicable
Critical Infrastructure Risk & Safety: The 12 circuits being relocated support high priority, active Navy communication networks. Working on live critical UPS panels
Panel P/P3) in Building 1A poses extreme operational risks. An unauthorized or non-certified contractor performing these delicate operations could cause accidental sh
leading to widespread, unplanned communications outages for the Pacific fleet.
Specialized System Familiarity: Miquin/Critical Power Electric designed and maintains specialized knowledge of the underlying electrical architecture and UPS layout
1A. Their personnel possess proprietary and expert familiarity with the specific technical configurations of the NRL, Matreces, Purge, and Telecom systems involved in t
Warranty Preservation: The existing critical UPS branch circuit systems and associated power hardware are under active technical support and warranty. Utilizing a no
contractor to introduce new breakers, execute panel ASIs, and reroute active lines would void manufacturer warranties and technical support agreements, potentially s
financial liability and risk to the Government.
Schedule Efficiency: Miquin has already performed the preliminary engineering assessments and holds the necessary technical data to execute the task within the co
business day timeframe. Selecting an alternative contractor would require repeating engineering analyses, resulting in at least a 2 to 4 month delay, leaving critical N
vulnerable to further power-disruption events in the interim.
Procurement Request/Solicitation/Purchase Order Number: 1301402463
Control Number:
I. Background
9/17/26, 8:34 AM NAVSUP Procurement Tracker Tool
https://mynavsup.nag.navy.mil/apps/ops$protrack.request?p_request_id=50430 1/3
-- 1 of 3 --
2. As required by FAR 13.106 3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requiremen
of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE
Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, the estimated cost/price, and the required d
date/period of performance
UPS Circuit relocation for critical mission equipment from a non-critical panel to the critical UPS Branch circuit panels in Building 1A [PRF 106988]
The Contractor is required to perform critical circuit relocation of equipment from non critical power panels to the critical Uninterruptible Power Supply (UPS) branch circuit p
1A. Currently, several low-powered telecommunications equipment systems experience service disruptions during utility power transitions, which directly impacts active milita
The scope of work requires the contractor to relocate and land twelve (12) circuits as follows:
Panel P/P2 (6 Circuits):
One (1) Naval Research Laboratory (NRL) circuit breaker.
Two (2) Matreces circuit breakers.
One (1) Purge unit circuit breaker.
Two (2) spare slots/breakers.
Panel P/P3 (6 Circuits):
One (1) Outside rack circuit breaker.
One (1) Telecommunications (Telecom) circuit breaker.
One (1) Absorbent Glass Mat (AGM) battery charger circuit breaker.
Three (3) spare slots/breakers.