Skip to content

Open for responses

Wet Well Cleaning

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
2027-PZI-0004
NAICS
562998
PSC
Z1ND
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
December 4, 2026
Place of performance
0, MA

What this opportunity is

The Department of Defense is seeking a contractor to provide temporary wastewater hauling services at Hanscom AFB, MA, specifically for maintaining wet well liquid levels during pump failures. This opportunity is set aside for small businesses and falls under NAICS 562998. Interested vendors should note that this is a Combined Synopsis/Solicitation, indicating that they will need to track the notice closely for potential bidding opportunities and further details outlined in the Performance Work Statement.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

CUI CUI PERFORMANCE WORK STATEMENT FOR Wet Well Pumping PREPARED BY: 66 ABG/CEOES 22 October 2026 -- 1 of 10 -- 2 CUI 1. DESCRIPTION OF SERVICES: 1.1. Scope: The contractor shall provide all labor, tools, equipment, hoses, gauges, test equip- ment, hearing protection, eye protection including prescription safety glasses, materials, sup- plies and parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA to pump wet wells at Building 1306. The contractor shall be responsible for insuring all services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS). 1.2. Requested Service: Hanscom AFB requires temporary wastewater hauling capabilities to prevent sanitary sewer overflows (SSOs), maintain environmental compliance, and support operational continuity during lift station pump failure, replacement. The objective is to main- tain wet well liquid levels at safe operating thresholds continuously until primary pumping system is restored. 1.3 Scope of Work Services encompass: 1. Continuous 24/7 on-site presence of certified vacuum/tanker truck(s) and qualified op- erators. 2. Direct suction and extraction of raw sewage and effluent from the designated HAFB lift station wet well(s) at Building 1306 3. Over-the-road transport of domestic wastewater along authorized public transit routes between HAFB and the Town of Lexington municipal discharge location. 4. Safe, controlled discharge into the Town of Lexington receiving pump station in com- pliance with municipal and state discharge authorizations. 5. Implementation of spill prevention, traffic management, and emergency response pro- tocols. 1.4 Period of Performance (PoP) The period of performance shall commence immediately upon issuance of the Notice to Pro- ceed (NTP) / Task Order and shall continue uninterrupted 24/7 until official notice of de-mo- bilization is provided by the Contracting Officer (KO). 1.5 Place of Performance x Loading Site (Origin): Building 1306 Wet Well, Hanscom Air Force Base, Bed- ford/Lexington, MA 01731. x Offloading Site (Destination): Town of Lexington Pump Station / Lexington, MA. -- 2 of 10 -- 3 CUI 1.6 APPLICABLE REGULATIONS AND DIRECTIVES The Contractor shall adhere to all applicable federal, Department of Defense (DoD), Depart- ment of the Air Force (DAF), state, and local standards, including but not limited to: x Air Force Instruction (AFI) 32-1067: Water and Wastewater Systems x Department of the Air Force Manual (DAFMAN) 91-203: Air Force Occupational Safety, Fire, and Health Standards x Code of Federal Regulations (CFR): o 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response / HAZWOPER) o 29 CFR 1910.146 (Permit-Required Confined Spaces) o 40 CFR Part 503 (Standards for the Use or Disposal of Sewage Sludge) o 49 CFR Parts 100–185 (DOT Hazardous Materials and Commercial Vehicle Regulations) x Massachusetts Department of Environmental Protection (MassDEP): 314 CMR 12.00 (Operation and Maintenance and Pretreatment Standards for Wastewater Treatment Works) x Hanscom AFB Integrated Spill Prevention, Control, and Countermeasure (SPCC) Plan 1.7 SPECIFIC TECHNICAL REQUIREMENTS 1.7.1 Continuous Operations and Staffing Coverage x 24/7 Shift Coverage: The Contractor shall maintain continuous shift coverage con- sisting of at least three (3) primary operators/drivers on-site per active vehicle 24 hours per day, including weekends and federal holidays. x Shift Handover: Shift changeovers shall occur on-site without interruption to pump- ing or transport cycles. An overlap period of no less than fifteen (15) minutes shall be observed to conduct operational status handoffs. x Response and Cycle Time: The Contractor shall cycle between extraction, transit, discharge, and return such that the target wet well level never exceeds the maximum allowable emergency operating level established by the COR (e.g., maintaining level at or below high-water alarm trigger point). 1.8 Equipment Specifications and Readiness x Pumper / Vacuum Tanker Fleet: The Contractor shall provide road-worthy, Depart- ment of Transportation (DOT)-certified vacuum pumper trucks or liquid tanker units with a minimum capacity of 3,000 to 5,000 gallons each. x Reserve / Redundancy: The Contractor shall maintain dedicated primary vehicles and immediate backup vehicle availability to ensure that mechanical breakdown does not result in an interruption exceeding fifteen (15) minutes. -- 3 of 10 -- 4 CUI x Pumps and Hoses: All hoses, fittings, camlocks, and suction lines shall be rated for raw municipal wastewater, watertight, and equipped with positive containment to pre- vent drips during connection and disconnection. x Auxiliary Equipment: Trucks shall be equipped with functional auxiliary scene light- ing, amber safety strobes, and spill containment kits capable of capturing minor drips or connection leaks. 1.9 Extraction, Transport, and Discharge Operations x Wet Well Extraction: Suction shall be conducted without causing physical damage to existing wet well components, level transducers, float switches, guide rails, or base in- frastructure. x Spill Mitigation During Hookup: Contractor personnel shall deploy drip pans or sec- ondary containment under all hose connections prior to commencing suction or dis- charge. x Hauling & Transport: All transport must follow designated commercial transit routes adhering strictly to local Town of Lexington, MassDOT, and HAFB traffic or- dinances. Speed limits on base shall be strictly observed. x Discharge Protocols: Wastewater offloading at the Town of Lexington pump station shall be carried out in coordination with Town of Lincoln Department of Public Works (DPW) / Water & Sewer Division requirements. Discharge must be metered or logged by batch load to record total gallons discharged. 1.10 Spill…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 562998