1. DESCRIPTION OF SERVICES:
1.1. Scope: The contractor shall provide all labor, tools, equipment, hoses, gauges, test equip-
ment, hearing protection, eye protection including prescription safety glasses, materials, sup-
plies and parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA
to pump wet wells at Building 1306. The contractor shall be responsible for insuring all services
and parts provided under this contract are in accordance with the terms and conditions outlined
herein and conform to the manufacturer’s equipment specifications and this Performance Work
Statement (PWS).
1.2. Requested Service: Hanscom AFB requires temporary wastewater hauling capabilities
to prevent sanitary sewer overflows (SSOs), maintain environmental compliance, and support
operational continuity during lift station pump failure, replacement. The objective is to main-
tain wet well liquid levels at safe operating thresholds continuously until primary pumping
system is restored.
1.3 Scope of Work
Services encompass:
1. Continuous 24/7 on-site presence of certified vacuum/tanker truck(s) and qualified op-
erators.
2. Direct suction and extraction of raw sewage and effluent from the designated HAFB
lift station wet well(s) at Building 1306
3. Over-the-road transport of domestic wastewater along authorized public transit routes
between HAFB and the Town of Lexington municipal discharge location.
4. Safe, controlled discharge into the Town of Lexington receiving pump station in com-
pliance with municipal and state discharge authorizations.
5. Implementation of spill prevention, traffic management, and emergency response pro-
tocols.
1.4 Period of Performance (PoP)
The period of performance shall commence immediately upon issuance of the Notice to Pro-
ceed (NTP) / Task Order and shall continue uninterrupted 24/7 until official notice of de-mo-
bilization is provided by the Contracting Officer (KO).
1.5 Place of Performance
x Loading Site (Origin): Building 1306 Wet Well, Hanscom Air Force Base, Bed-
ford/Lexington, MA 01731.
x Offloading Site (Destination): Town of Lexington Pump Station / Lexington, MA.
-- 2 of 10 --
3
CUI
1.6 APPLICABLE REGULATIONS AND DIRECTIVES
The Contractor shall adhere to all applicable federal, Department of Defense (DoD), Depart-
ment of the Air Force (DAF), state, and local standards, including but not limited to:
x Air Force Instruction (AFI) 32-1067: Water and Wastewater Systems
x Department of the Air Force Manual (DAFMAN) 91-203: Air Force Occupational
Safety, Fire, and Health Standards
x Code of Federal Regulations (CFR):
o 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response /
HAZWOPER)
o 29 CFR 1910.146 (Permit-Required Confined Spaces)
o 40 CFR Part 503 (Standards for the Use or Disposal of Sewage Sludge)
o 49 CFR Parts 100–185 (DOT Hazardous Materials and Commercial Vehicle
Regulations)
x Massachusetts Department of Environmental Protection (MassDEP): 314 CMR
12.00 (Operation and Maintenance and Pretreatment Standards for Wastewater
Treatment Works)
x Hanscom AFB Integrated Spill Prevention, Control, and Countermeasure
(SPCC) Plan
1.7 SPECIFIC TECHNICAL REQUIREMENTS
1.7.1 Continuous Operations and Staffing Coverage
x 24/7 Shift Coverage: The Contractor shall maintain continuous shift coverage con-
sisting of at least three (3) primary operators/drivers on-site per active vehicle 24
hours per day, including weekends and federal holidays.
x Shift Handover: Shift changeovers shall occur on-site without interruption to pump-
ing or transport cycles. An overlap period of no less than fifteen (15) minutes shall be
observed to conduct operational status handoffs.
x Response and Cycle Time: The Contractor shall cycle between extraction, transit,
discharge, and return such that the target wet well level never exceeds the maximum
allowable emergency operating level established by the COR (e.g., maintaining level
at or below high-water alarm trigger point).
1.8 Equipment Specifications and Readiness
x Pumper / Vacuum Tanker Fleet: The Contractor shall provide road-worthy, Depart-
ment of Transportation (DOT)-certified vacuum pumper trucks or liquid tanker units
with a minimum capacity of 3,000 to 5,000 gallons each.
x Reserve / Redundancy: The Contractor shall maintain dedicated primary vehicles
and immediate backup vehicle availability to ensure that mechanical breakdown does
not result in an interruption exceeding fifteen (15) minutes.
-- 3 of 10 --
4
CUI
x Pumps and Hoses: All hoses, fittings, camlocks, and suction lines shall be rated for
raw municipal wastewater, watertight, and equipped with positive containment to pre-
vent drips during connection and disconnection.
x Auxiliary Equipment: Trucks shall be equipped with functional auxiliary scene light-
ing, amber safety strobes, and spill containment kits capable of capturing minor drips
or connection leaks.
1.9 Extraction, Transport, and Discharge Operations
x Wet Well Extraction: Suction shall be conducted without causing physical damage to
existing wet well components, level transducers, float switches, guide rails, or base in-
frastructure.
x Spill Mitigation During Hookup: Contractor personnel shall deploy drip pans or sec-
ondary containment under all hose connections prior to commencing suction or dis-
charge.
x Hauling & Transport: All transport must follow designated commercial transit
routes adhering strictly to local Town of Lexington, MassDOT, and HAFB traffic or-
dinances. Speed limits on base shall be strictly observed.
x Discharge Protocols: Wastewater offloading at the Town of Lexington pump station
shall be carried out in coordination with Town of Lincoln Department of Public Works
(DPW) / Water & Sewer Division requirements. Discharge must be metered or logged
by batch load to record total gallons discharged.
1.10 Spill…