Federal Contractor Profile
Estes Bros. Const. INC.
$330M obligated·68 awards·4 agencies·2 NAICS
Federal Contracts
Showing contracts 51–100 of 106 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jun 14, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000070 | 237310 | PROJECT NP NATR BMS FY21(1) THE PROJECT CONSISTS OF EIGHTEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLING, CONCRETE | $383K |
| Jun 7, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $7.5M |
| May 20, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000062 | 237310 | PROJECT VA ERFO FS 2018-1(1) THE PROJECT CONSISTS OF ROADWAY REPAIRS. THE WORK INCLUDES ROADWAY AND DITCH EXCAVATION, STRUCTURAL BACKFILL, RIPRAP, GABION WALL, AGGREGATE SURFACE COURSE, DITCH RECONDITIONING, STRUCTURAL CONCRETE, STRUCTURAL PLATE BO | $1.4M |
| Mar 24, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000025 | 237310 | PROJECT NP GRSM 14(3), 112(1), ETC. THE PROJECT CONSISTS OF REHABILITATION OF 9 BRIDGES ON THE TENNESSEE SIDE OF THE GREAT SMOKY MOUNTAIN NATIONAL PARK. THE WORK INCLUDES ASPHALT WEARING COURSE REMOVAL, SCOUR PROTECTION AROUND EXISTING ABUTMENTS AN | $286K |
| Mar 8, 2021 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2021C0046 | 237310 | VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK | $7.2M |
| Mar 4, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000047 | 237310 | PROJECT FW-FLPA 419(1) THE PROJECT CONSISTS OF PAVEMENT WIDENING ON BOTH SIDES OF SR 29 TO ACCOMMODATE A LEFT TURN LANE IN THE NORTHBOUND DIRECTION AND A RIGHT DECELERATION TURN LANE IN THE SOUTHBOUND DIRECTION, AND A SECTION OF REFUGE ROAD RECONSTR | $2.2M |
| Feb 25, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000016 | 237310 | PROJECT NP-BLRI PVT PRES FY20 THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (THIN-LIFT ASPHALT OVERLAY) OF OVERLOOKS, PICNIC AREAS AND PARKING AREAS ALONG BLUE RIDGE PARKWAY. THE WORK INCLUDES PAVEMENT MARKING INSTALLATION AND OTHER MISCE | $3.3M |
| Feb 17, 2021 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0030 | 237110 | CHIMNEY'S PICNIC AREA WATER AND SEPTIC | $61K |
| Nov 6, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $39M |
| Sep 21, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0043 | 237310 | GREAT SMOKY MTS. NP: CHIMNEY'S PICNIC AREA PAVING | $999K |
| Sep 4, 2020 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2019C0067 | 237310 | SHEN-222245, SHENANDOAH NATIONAL PARK FY19 PAVEMENT IMPROVEMENTS, SHENANDOAH NATIONAL PARK, MADISON, PAGE AND RAPPAHANNOCK COUNTIES, VIRGINIA | $268K |
| Aug 21, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000033 | 237310 | PROJECT NC ERFO FS 2016-1(1) THE PROJECT CONSISTS OF REPAIRING FLOOD DAMAGED ROADS AND EMBANKMENTS OF 15 LOCATIONS WITHIN THE NANTAHALA AND PISGAH NATIONAL FORESTS. THE WORK INCLUDES GRADING, DRAINAGE, RIPRAP, AGGREGATE SURFACE COURSE, ASPHALT CONC | $48K |
| Aug 20, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000025 | 237310 | PROJECT NP GRSM 14(3), 112(1), ETC. THE PROJECT CONSISTS OF REHABILITATION OF 9 BRIDGES ON THE TENNESSEE SIDE OF THE GREAT SMOKY MOUNTAIN NATIONAL PARK. THE WORK INCLUDES ASPHALT WEARING COURSE REMOVAL, SCOUR PROTECTION AROUND EXISTING ABUTMENTS AN | $2.8M |
| Aug 13, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320F000060 | 237310 | THE PROJECT CONSISTS OF NINETEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES REPAIR DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACKS SEALING AND FILLING, CONCRETE REPAIRS, AND OTHER MISCELLANEOUS W | $590K |
| Jul 20, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0027 | 237310 | BLRI - CORRECT MAINLINE TUNNEL ISSUES | $220K |
| Jul 9, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0031 | 237310 | BLRI-REPAIR REPAVE OTTER CREEK CG ROAD | $185K |
| Jul 7, 2020 | Department of the InteriorSER NORTH MABO (53000) | 140P5320C0030 | 237110 | CHIMNEY'S PICNIC AREA WATER AND SEPTIC | $374K |
| Jun 29, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000037 | 237310 | GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I | $58K |
| May 15, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000037 | 237310 | GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I | $14K |
| Apr 8, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000037 | 237310 | GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I | $19K |
| Mar 5, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000013 | 237310 | PROJECT NP-BLRI PVT PRES ASHEVILLE THE PROJECT CONSISTS OF PAVEMENT PRESERVATION OF APPROXIMATELY 25.67 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 365.50 TO MP 389.70 AND MP 393.23 TO MP 394.70. THE PROJECT WILL BE ADVERTISED WITH THE CONTR | $5.5M |
| Jan 30, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000011 | 237310 | PROJECT NP-SER PMS FY19(3) THE PROJECT CONSISTS OF REMOVING PAVEMENT MARKINGS, ADDING PAVEMENT PRESERVATION TREATMENT, REMOVE AND RESET WHEELSTOPS, ADD PAVEMENT MARKINGS ON IDENTIFIED PAVED ROADS AND PARKING AREAS, AND OTHER MISCELLANEOUS WORK. | $2.1M |
| Jan 29, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000033 | 237310 | PROJECT NC ERFO FS 2016-1(1) THE PROJECT CONSISTS OF REPAIRING FLOOD DAMAGED ROADS AND EMBANKMENTS OF 15 LOCATIONS WITHIN THE NANTAHALA AND PISGAH NATIONAL FORESTS. THE WORK INCLUDES GRADING, DRAINAGE, RIPRAP, AGGREGATE SURFACE COURSE, ASPHALT CONC | $65K |
| Jan 6, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000031 | 237310 | PROJECT NP-GWMP 1(2), 2(4) THE PROJECT CONSISTS OF INTERIM PAVEMENT REPAIRS ON GEORGE WASHINGTON MEMORIAL PARKWAY NORTH SECTION FROM I-495 TO SPOUT RUN PARKWAY AND CLARA BARTON PARKWAY FROM MACARTHUR BLVD TO CHAIN BRIDGE ROAD. THE WORK INCLUDES SPO | $574K |
| Dec 30, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000023 | 237310 | PROJECT WV ERFO FS 2016-1(4) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF MULTIPLE SEGMENTS OF THE MAINLINE OF WILLIAMS RIVER ROAD (FS ROUTE 86) FROM MILEPOST 8.0 TO 11.1. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, BRIDGE REMOVAL AND REPLACEMENT, SHOULDER AND DITCH RECONDITIONING, DRAINAGE IMPROVEMENT AND OTHER MISCELLANEOUS WORK. | $33K |
| Dec 19, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000021 | 237310 | PROJECT NP-NATR 3O19, 3P24 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.58 MILES OF THE NATCHEZ TRACE PARKWAY, FROM MILEPOST (MP) 102.42 TO MP 110, INCLUDING PULL-OFFS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, BRIDGE JOINT CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, AND OTHER MISCELLANEOUS WORK. | $598K |
| Nov 20, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000021 | 237310 | PROJECT NP-NATR 3O19, 3P24 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.58 MILES OF THE NATCHEZ TRACE PARKWAY, FROM MILEPOST (MP) 102.42 TO MP 110, INCLUDING PULL-OFFS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, BRIDGE JOINT CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, AND OTHER MISCELLANEOUS WORK. | $1.1M |
| Sep 20, 2019 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2019C0067 | 237310 | SHEN-222245, SHENANDOAH NATIONAL PARK FY19 PAVEMENT IMPROVEMENTS, SHENANDOAH NATIONAL PARK, MADISON, PAGE AND RAPPAHANNOCK COUNTIES, VIRGINIA | $10M |
| Sep 6, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000037 | 237310 | GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I | $1.1M |
| Aug 29, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000031 | 237310 | PROJECT NP-GWMP 1(2), 2(4) THE PROJECT CONSISTS OF INTERIM PAVEMENT REPAIRS ON GEORGE WASHINGTON MEMORIAL PARKWAY NORTH SECTION FROM I-495 TO SPOUT RUN PARKWAY AND CLARA BARTON PARKWAY FROM MACARTHUR BLVD TO CHAIN BRIDGE ROAD. THE WORK INCLUDES SPO | $2.4M |
| Aug 27, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000033 | 237310 | PROJECT NC ERFO FS 2016-1(1) THE PROJECT CONSISTS OF REPAIRING FLOOD DAMAGED ROADS AND EMBANKMENTS OF 15 LOCATIONS WITHIN THE NANTAHALA AND PISGAH NATIONAL FORESTS. THE WORK INCLUDES GRADING, DRAINAGE, RIPRAP, AGGREGATE SURFACE COURSE, ASPHALT CONC | $2.0M |
| Jul 30, 2019 | Department of the InteriorSER NORTH MABO (53000) | 140P5319C0021 | 237310 | REPAIR REPAVE PEAKS OF OTTER CAMPGROUND | $344K |
| Jun 27, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000021 | 237310 | PROJECT NP-NATR 3O19, 3P24 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.58 MILES OF THE NATCHEZ TRACE PARKWAY, FROM MILEPOST (MP) 102.42 TO MP 110, INCLUDING PULL-OFFS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, BRIDGE JOINT CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, AND OTHER MISCELLANEOUS WORK. | $1.7M |
| Jun 27, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000022 | 237310 | PROJECT WV ERFO FS 2016-1(3) THE PROJECT CONSISTS OF REPAIR OF MULTIPLE SEGMENTS OF MAINLINE OF WILLIAM RIVER ROAD (FS ROUTE 86) MILEPOST 12.0 TO 14.7. THE WORK INCLUDES REPAIR OF SLOPE FAILURES, SHOULDER AND DITCH RECONDITIONING, SMALL PIPE CULVERT REPLACEMENTS, AND OTHER MISCELLANEOUS WORK. | $813K |
| Jun 27, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000023 | 237310 | PROJECT WV ERFO FS 2016-1(4) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF MULTIPLE SEGMENTS OF THE MAINLINE OF WILLIAMS RIVER ROAD (FS ROUTE 86) FROM MILEPOST 8.0 TO 11.1. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, BRIDGE REMOVAL AND REPLACEMENT, SHOULDER AND DITCH RECONDITIONING, DRAINAGE IMPROVEMENT AND OTHER MISCELLANEOUS WORK. | $1.5M |
| May 8, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000012 | 237310 | SOEN: EMERGENCY REPAIRS TO REHABILITATE THE DETERIORATED PAVEMENT ALONG THE BALTIMORE WASHINGTON PARKWAY FROM BIG PATUXENT RIVER BRIDGE TO LITTLE PATUXENT RIVER BRIDGE. | $2.5M |
| Mar 28, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000012 | 237310 | SOEN: EMERGENCY REPAIRS TO REHABILITATE THE DETERIORATED PAVEMENT ALONG THE BALTIMORE WASHINGTON PARKWAY FROM BIG PATUXENT RIVER BRIDGE TO LITTLE PATUXENT RIVER BRIDGE. | $2.6M |
| Aug 27, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000042 | 237310 | THIS PR IS FOR THE AWARD OF PROJECT BLRI PVM PRES FY17 | $40K |
| Aug 23, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000041 | 237310 | IGF::OT::IGF PROJECT: NP-GRSM 1B22 THE PROJECT CONSISTS OF THE RESURFACING OF 14.27 MILES OF NEWFOUND GAP ROAD STARTING AT MILEPOST 14.64, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY WITH AN ULTRA-THIN BONDED WEARING COURSE, SHOULDER RECONDITIONING, AND OTHER MISCELLANEOUS WORK. | $990K |
| Aug 7, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000040 | 237310 | NP-CHCH 10(2), 14(1) TO AWARD PROJECT NP-CHCH 10(2), 14(1) | $114K |
| May 29, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000040 | 237310 | NP-CHCH 10(2), 14(1) TO AWARD PROJECT NP-CHCH 10(2), 14(1) | $311K |
| Apr 24, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000042 | 237310 | THIS PR IS FOR THE AWARD OF PROJECT BLRI PVM PRES FY17 | $4.1M |
| Apr 11, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000040 | 237310 | NP-CHCH 10(2), 14(1) TO AWARD PROJECT NP-CHCH 10(2), 14(1) | $3.2M |
| Apr 9, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000041 | 237310 | IGF::OT::IGF PROJECT: NP-GRSM 1B22 THE PROJECT CONSISTS OF THE RESURFACING OF 14.27 MILES OF NEWFOUND GAP ROAD STARTING AT MILEPOST 14.64, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY WITH AN ULTRA-THIN BONDED WEARING COURSE, SHOULDER RECONDITIONING, AND OTHER MISCELLANEOUS WORK. | $3.0M |
| Aug 1, 2017 | Department of the InteriorSER NORTH MABO (53000) | INP17PC00236 | 237310 | IGF::OT::IGF, X:NOGRN, CORRECT WILDERNESS ROAD CAMPGROUND ACCESSIBILITY DEFICIENCIES, CUGA, MIDDLESBORO, KY | $18K |
| Jul 20, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00023 | 237310 | IGF::OT::IGF PROJECT: VA ERFO FS 2013-1(2) THE PURPOSE OF THIS AMENDMENT IS TO POSTPONE THE BID OPENING DATE UNTIL FURTHER NOTICE. A NEW BID OPENING DATE WILL BE ISSUED IN AN UPCOMING AMENDMENT. | $833K |
| Jun 20, 2017 | Department of the InteriorSER NORTH MABO (53000) | INP17PC00236 | 237310 | IGF::OT::IGF, X:NOGRN, CORRECT WILDERNESS ROAD CAMPGROUND ACCESSIBILITY DEFICIENCIES, CUGA, MIDDLESBORO, KY | $86K |
| May 31, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00003 | 237310 | IGF::OT::IGF PROJECT: GRSM 11(2) AND GRSM 1A29 THE NP-GRSM 11(2) PROJECT CONSISTS OF THE MILL AND OVERLAY OF GATLINBURG SPUR ROAD AND OVERLAY OF ADJACENT SIDE ROADS. THE NP-GRSM 1A29 PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.8 MILES OF NEWFOUND GAP, INCLUDING ROADSIDE PULLOUTS, THE INTERCHANGE WITH GATLINBURG ROAD, AND THE INTERSECTION WITH RIVER ROAD. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, SELECT FULL-DEPTH PAVEMENT PATCHING AND WIDENING, FULL-DEPTH PAVEMENT RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING AND STABILIZATION, CONCRETE CURB AND GUTTER, STONE MASONRY REPAIRS, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENTS, DRAINAGE IMPROVEMENTS, BRIDGE EXPANSION JOINT REPAIRS, BRIDGE DECK OVERLAY WITH POLYESTER POLYMER CONCRETE, AND OTHER MISCELLANEOUS WORK. | $700K |
| Jan 25, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00003 | 237310 | IGF::OT::IGF PROJECT: GRSM 11(2) AND GRSM 1A29 THE NP-GRSM 11(2) PROJECT CONSISTS OF THE MILL AND OVERLAY OF GATLINBURG SPUR ROAD AND OVERLAY OF ADJACENT SIDE ROADS. THE NP-GRSM 1A29 PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.8 MILES OF NEWFOUND GAP, INCLUDING ROADSIDE PULLOUTS, THE INTERCHANGE WITH GATLINBURG ROAD, AND THE INTERSECTION WITH RIVER ROAD. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, SELECT FULL-DEPTH PAVEMENT PATCHING AND WIDENING, FULL-DEPTH PAVEMENT RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING AND STABILIZATION, CONCRETE CURB AND GUTTER, STONE MASONRY REPAIRS, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENTS, DRAINAGE IMPROVEMENTS, BRIDGE EXPANSION JOINT REPAIRS, BRIDGE DECK OVERLAY WITH POLYESTER POLYMER CONCRETE, AND OTHER MISCELLANEOUS WORK. | $6.6M |
| Sep 9, 2016 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7116C00016 | 237310 | IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $184K |
Get Alerted Before Estes Bros. Const. INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free