Skip to content

Federal Contractor Profile

Estes Bros. Const. INC.

$334M obligated·69 awards·4 agencies·2 NAICS

Federal Contracts

Showing award actions 101–112 of 112 funded award actions, most recent first.

Contracts with positive obligations
69
Funded award actions shown
112
Obligations shown
$334M
Awarding agencies
4

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 3, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 1, 2017Department of the InteriorSER NORTH MABO (53000)INP17PC00236237310IGF::OT::IGF, X:NOGRN, CORRECT WILDERNESS ROAD CAMPGROUND ACCESSIBILITY DEFICIENCIES, CUGA, MIDDLESBORO, KY$18K
Jul 20, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00023237310IGF::OT::IGF PROJECT: VA ERFO FS 2013-1(2) THE PURPOSE OF THIS AMENDMENT IS TO POSTPONE THE BID OPENING DATE UNTIL FURTHER NOTICE. A NEW BID OPENING DATE WILL BE ISSUED IN AN UPCOMING AMENDMENT.$833K
Jun 20, 2017Department of the InteriorSER NORTH MABO (53000)INP17PC00236237310IGF::OT::IGF, X:NOGRN, CORRECT WILDERNESS ROAD CAMPGROUND ACCESSIBILITY DEFICIENCIES, CUGA, MIDDLESBORO, KY$86K
May 31, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00003237310IGF::OT::IGF PROJECT: GRSM 11(2) AND GRSM 1A29 THE NP-GRSM 11(2) PROJECT CONSISTS OF THE MILL AND OVERLAY OF GATLINBURG SPUR ROAD AND OVERLAY OF ADJACENT SIDE ROADS. THE NP-GRSM 1A29 PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.8 MILES OF NEWFOUND GAP, INCLUDING ROADSIDE PULLOUTS, THE INTERCHANGE WITH GATLINBURG ROAD, AND THE INTERSECTION WITH RIVER ROAD. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, SELECT FULL-DEPTH PAVEMENT PATCHING AND WIDENING, FULL-DEPTH PAVEMENT RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING AND STABILIZATION, CONCRETE CURB AND GUTTER, STONE MASONRY REPAIRS, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENTS, DRAINAGE IMPROVEMENTS, BRIDGE EXPANSION JOINT REPAIRS, BRIDGE DECK OVERLAY WITH POLYESTER POLYMER CONCRETE, AND OTHER MISCELLANEOUS WORK.$700K
Jan 25, 2017Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7117C00003237310IGF::OT::IGF PROJECT: GRSM 11(2) AND GRSM 1A29 THE NP-GRSM 11(2) PROJECT CONSISTS OF THE MILL AND OVERLAY OF GATLINBURG SPUR ROAD AND OVERLAY OF ADJACENT SIDE ROADS. THE NP-GRSM 1A29 PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.8 MILES OF NEWFOUND GAP, INCLUDING ROADSIDE PULLOUTS, THE INTERCHANGE WITH GATLINBURG ROAD, AND THE INTERSECTION WITH RIVER ROAD. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, SELECT FULL-DEPTH PAVEMENT PATCHING AND WIDENING, FULL-DEPTH PAVEMENT RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING AND STABILIZATION, CONCRETE CURB AND GUTTER, STONE MASONRY REPAIRS, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENTS, DRAINAGE IMPROVEMENTS, BRIDGE EXPANSION JOINT REPAIRS, BRIDGE DECK OVERLAY WITH POLYESTER POLYMER CONCRETE, AND OTHER MISCELLANEOUS WORK.$6.6M
Sep 9, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00016237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$184K
Aug 23, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00016237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$15K
Aug 1, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00016237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$55K
May 5, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00016237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$113K
Apr 25, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7115C00036237310IGF::OT::IGF PROJECT: PRA-BLRI 2F24 THE PROJECT CONSISTS OF THE RESURFACING AND REHABILITATION OF APPROXIMATELY 9.1 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 283.0 TO MP 291.9, INCLUDING OVERLOOKS AND THE EXIT/ENTRANCE RAMP AT U.S. ROUTE 321. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$41K
Apr 7, 2016Department of Transportation693C73 EASTERN FED LANDS DIVISIONDTFH7116C00016237310IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 3 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST MP 103.36 TO MP 106.00, INCLUDING THE EXIT/ENTRANCE RAMPS TO US ROUTE 460. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$2.9M
Dec 21, 2015Department of TransportationEASTERN FEDERAL LANDS HIGHWAY DIVISIONDTFH7116C00006237310IGF::OT::IGF PROJECT: VA ERFO FS 2013-1(1) THE PROJECT CONSISTS OF THE RESTORATION AND STABILIZATION OF THE SLIDE AREA ALONG HITE HOLLOW ROAD (FSR 82) WITHIN THE GEORGE WASHINGTON NATIONAL FOREST. THE WORK INCLUDES CONSTRUCTION OF A MECHANICALLY STABILIZED EARTH WALL WITH GEOGRID AND WELDED WIRE BASKETS, PLACEMENT OF RIPRAP, RESURFACING OF THE AGGREGATE ROADWAY, AND OTHER MISCELLANEOUS WORK.$190K

Get Alerted Before Estes Bros. Const. INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free