What this opportunity is
The Department of Defense is soliciting bids for the construction of South Lot 3 at Offutt AFB, NE, which involves providing labor, equipment, and supervision to build a parking lot according to specified drawings and specifications. This opportunity is set aside for small businesses, making it suitable for those in the construction sector under NAICS 237310. Interested bidders should note that submissions must be made electronically via email, as fax and hardcopy bids will be rejected, and they should track the solicitation and any amendments on SAM.gov.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
100% Submittal
CONSTRUCT N EW PARKING LOT #3,
B1000
Offutt A.F.B., Nebraska
OAFB Project No. SGBP 24-0018
Contract No. FA4600-22-D-0003
HGM Project No. 740924
June 9, 2026
-- 1 of 194 --
-- 2 of 194 --
Offutt AFB Construct Parking Lot #3, B1000 SGBP 24-0018
COA NE CA-0065
I hereby certify that this engineering document was prepared by me or under my direct personal
supervision and that I am a duly licensed Professional Engineer under the laws of the State of
Nebraska.
June 9, 2026
William J. Glismann, P.E.
My registration renewal date is December 31, 2027.
Pages or sheets covered by this seal:
All Divisions.
-- 3 of 194 --
-- 4 of 194 --
OAFB Parking Lot #3 B1000 SGBP24-0018
HGM # 740924 Table of Contents Page 1 of 1
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 List of Drawings
00 10 00 General Conditions
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 33 00 Submittal Procedures
01 42 00 Sources for Reference Publications
01 57 19 Temporary Environmental Controls
DIVISION 02 - EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 03 - CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 31 - EARTHWORK
31 00 00 Earthwork
31 11 00 Clearing and Grubbing
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 13 Bituminous Tack and Prime Coats
32 12 16.16 Road-Mix Asphalt Paving
32 16 19 Concrete Curbs, Gutters and Sidewalks
32 17 23.16 Road and Parking Lot Pavement Markings
32 92 19 Seeding
DIVISION 33 - UTILITIES
33 01 30.16 TV Inspection of Sewer Lines
33 40 00 Stormwater Utilities
-- End of Table of Contents --
-- 5 of 194 --
-- 6 of 194 --
OAFB Parking Lot #3 B1000 SGBP24-0018
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract
clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET NO. DRAWING NO. TITLE
1 Cover Cover Sheet & Location Plan
2 C0.1 Contractor Access & Staging Plan
3 C0.2 Topographic Survey
4 C1.1 Removal Plan - BASE BID
5 C1.2 Site Plan
6 C1.3 Enlarged Site Plan Area B - BASE BID
7 C1.4 Enlarged Site Plan Area C - BASE BID
8 C1.5 Grading Plan Area B - BASE BID
9 C1.6 Grading Plan Area C - BASE BID
10 C1.7 Drainage Plan - BASE BID
11 C1.8 Erosion Control Plan - BASE BID
12 C1.9 Permanent Stabilization Plan - BASE BID
13 C2.1 Removal Plan - ALTERNATIVE
14 C2.2 Site Plan - ALTERNATIVE
15 C2.3 Enlarged Site Plan Area A - ALTERNATIVE
16 C2.4 Enlarged Site Plan Area B - ALTERNATIVE
17 C2.5 Enlarged Site Plan Area C - ALTERNATIVE
18 C2.6 Grading Plan Area A - ALTERNATIVE
19 C2.7 Grading Plan Area B - ALTERNATIVE
20 C2.8 Grading Plan Area C - ALTERNATIVE
21 C2.9 Drainage Plan - ALTERNATIVE
22 C2.10 Erosion Control Plan - ALTERNATIVE
HGM #740924 DOCUMENT 00 01 15 Page 1
-- 7 of 194 --
OAFB Parking Lot #3 B1000 SGBP24-0018
SHEET NO. DRAWING NO. TITLE
23 C2.11 Permanent Stabilization Plan - ALTERNATIVE
24 C3.1 Pavement Details
25 C3.2 Storm Drainage Details
26 C3.3 Curb Inlet Details
27 C3.4 Curb Inlet Details
28 C3.5 Area Inlet Details
29 ED1.01 Site - Electrical Demolition
30 E1.01 Site Plan - BASE BID ELECTRICAL
31 E1.02 Site Plan - ALTERNATE ELECTRICAL
32 E1.03 Site Plan - PHOTOMETRICS
-- End of Document --
HGM #740924 DOCUMENT 00 01 15 Page 2
-- 8 of 194 --
Offutt Air Force Base July 2022
00 10 00-1
SECTION 00 10 00
GENERAL CONDITIONS
PART 1 - GENERAL
1.1 PRINCIPAL FEATURES.
The work covered by these specifications and accompanying drawings consists of furnishing all plans, labor,
materials, tools, and equipment necessary in performing all operations in connection with this contract.
1.2 REQUEST FOR INFORMATION (RFI).
RFIs shall be submitted electronically in an MS Word Macro file format on the 55 CES RFI form. The form
can be obtained from the Contracting Officer Representative (COR). The RFI shall be submitted on the web
based submittal system in an RFI log for action and tracking.
1.3 SUBMITTALS
a. Contractor Daily Logs (reference paragraph 1.8)
b. Material Delivery Receipt (reference paragraph 1.11)
c. Traffic Control Plan (reference paragraph 1.12c)
d. Security-Listing of Employees (reference paragraph 1.23a)
e. Security-Training (reference paragraph 1.23b)
f. Confined Space Permit (reference paragraph 1.24c6)
g. Air Space Coordination (reference paragraph 1.25)
h. Digging Permit (reference paragraph 1.27a)
i. Contractor Single Point of Contact (reference paragraph 1.37c)
j. AF Form 3064 (reference paragraph 1.39)
k. AF Form 3065 (reference paragraph 1.39)
l. MS Project Gant Schedule (reference paragraph 1.39)
m. CD of all Submittals (reference paragraph 1.39)
n. Not Used
o. Not Used
p. Not Used
q. Warranty Book (reference paragraph 1.45)
r. Not Used
1.4 OCCUPANCY
During construction, the Government may occupy the existing facilities. The Contractor shall not restrict
pedestrian or vehicular traffic to these facilities and shall coordinate construction with the COR to minimize
conflicts. The Contractor shall perform the work so as not to interfere with ongoing operations.
1.5 ELECTRONIC SUBMITTALS.
All submittals shall be submitted electronically, unless specified otherwise, using a web based electronic
submittal tracking system as outlined in Section 01 33 00.
1.6 CONSTRUCTION TRAILER USE/IDENTIFICATION.
The location of any trailer/temporary building, etc. used during a contract period shall be approved by the
Government (Chief of Construction Management) [(402) 294-5084] prior to installation or delivery to the base
(allow 7-10 days for this approval to be processed). For security, safety, and/or emergency notification
purposes, each trailer/building, etc. must be prominently marked, identifying the Contractor and providing
telephone number(s) for a point of contact during both duty and non-duty hours. Use either sign(s) or
permanent marki…
Source: SAM.gov, as posted. Verify the current solicitation before responding.